Ardalan Sherafati
- Listed as
- engineer
- Firm
- Design Everest
- Based in
- Mountain View
- On San Francisco permits
- Jan 2019 to Nov 2022
8 permits since 2000 (engineer on 8 permits): 2 completed, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2022 | Expired or cancelled expired Jan 2025 | 416 Precita Av | Miguel A Padilla Construction | structural revision to 202110070036. upgrade floor joists and add shear walls, repair roof and repair/repaint exterior walls, change beam in main staircase to steel so it fits existing cavity. voluntary lateral strengthening at 2nd floorDetails
structural revision to 202110070036. upgrade floor joists and add shear walls, repair roof and repair/repaint exterior walls, change beam in main staircase to steel so it fits existing cavity. voluntary lateral strengthening at 2nd floor | $5,000 |
| May 9, 2022 | Expired or cancelled expired Jan 2025 | 416 Precita Av | Miguel A Padilla Construction | structural revision to permit 202110070036. revision to post sizes and foundation detailsDetails
structural revision to permit 202110070036. revision to post sizes and foundation details | |
| Jan 29, 2021 | Expired or cancelled cancelled Jan 2026 | 1700 Page St | Metro General Construction Inc | mandatory soft story retrofit per sfebc chapter 4d.Details
mandatory soft story retrofit per sfebc chapter 4d. | $120,000 |
| Feb 13, 2020 | Never finaled issued Feb 2020, no final | 579 Rhode Island St | revision to pa #201801239338 s1. pouring of new concrete slab per structural engineer plans and parapet wall construction per structural engineer's plans.Details
revision to pa #201801239338 s1. pouring of new concrete slab per structural engineer plans and parapet wall construction per structural engineer's plans. | $2,500 | |
| Dec 13, 2019 | Completed final sign-off Jan 2023 | 610 29th St | Bay Build Design Inc | convert portion of garage to habitable space, (n) bedroom, (n) bathroom, (n) laundry room, (n) mechanical room.Details
convert portion of garage to habitable space, (n) bedroom, (n) bathroom, (n) laundry room, (n) mechanical room. | $250,000 |
| Jul 9, 2019 | Completed final sign-off Apr 2022 | 579 Rhode Island St | revision to pa #201801239338-s1. revision construct to addition, add structural cantilever/overhang to new addition.Details
revision to pa #201801239338-s1. revision construct to addition, add structural cantilever/overhang to new addition. | $1,000 | |
| May 30, 2019 | Never finaled issued May 2019, no final | 4064 24th St | Vsa Construction | rev to pa# 201904026933; include structural rebar in concrete colums & modify i-beams to fit inside rebar cageDetails
rev to pa# 201904026933; include structural rebar in concrete colums & modify i-beams to fit inside rebar cage | |
| Jan 15, 2019 | Never finaled issued Jan 2019, no final | 4064 24th St | Vsa Construction | shoring for excavation. ref pa #201603293285.Details
shoring for excavation. ref pa #201603293285. | $50,000 |