Jose S. Renderos
- Listed as
- authorized agent-others, contractor
- Firm
- Golden Star Construction
- Based in
- North Hollywood
- On San Francisco permits
- Jul 2019 to Jul 2021
14 permits since 2000 (contractor on 14 permits, authorized agent-others on 3 permits): 6 completed, 7 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2021 | Expired or cancelled cancelled Jan 2026 | 477 Hazelwood Av | Golden Star Construction | bathroom remodel. adding two recessed lights, switches, two receptacles, and one ceiling fan, also adding one vanity, one toilet and one shower.Details
bathroom remodel. adding two recessed lights, switches, two receptacles, and one ceiling fan, also adding one vanity, one toilet and one shower. | $18,000 |
| Jul 27, 2021 | Completed final sign-off Nov 2021 | 477 Hazelwood Av | Golden Star Construction | replace one window installation, stucco patching, window not facing street.Details
replace one window installation, stucco patching, window not facing street. | $3,000 |
| Jul 13, 2021 | Never finaled issued Mar 2022, no final | 106 Country Club Dr | Golden Star Construction | new 660 sq ft adu on garage level.Details
new 660 sq ft adu on garage level. | $60,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 477 Hazelwood Av | Golden Star Construction | remodeling of 3 bathrooms, upgrade to 200 amp electri box. rewire home, office/bedroom converted to full bedroom at lower levelDetails
remodeling of 3 bathrooms, upgrade to 200 amp electri box. rewire home, office/bedroom converted to full bedroom at lower level | $49,000 |
| Mar 9, 2021 | Completed final sign-off Nov 2021 | 477 Hazelwood Av | Golden Star Construction | remodel of 3 bathrooms in kind. upgrade to 200 amp electric box. rewire house.Details
remodel of 3 bathrooms in kind. upgrade to 200 amp electric box. rewire house. | $49,000 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 106 Country Club Dr | Golden Star Construction | kitchen remodel, 2 bathrooms remodel, rewire house and upgrade electrical box to 200 ampDetails
kitchen remodel, 2 bathrooms remodel, rewire house and upgrade electrical box to 200 amp | $49,000 |
| Jan 4, 2021 | Completed final sign-off Sep 2021 | 555 14th Av | Avonmore Construction Inc, Golden Star Construction | kitchen & bathroom remodel, change 4 street facing windows, same location/sizeDetails
kitchen & bathroom remodel, change 4 street facing windows, same location/size | $34,000 |
| Jan 4, 2021 | Never finaled issued Jan 2021, no final | 2411 Octavia St | Golden Star Construction | unit 5: bathroom remodel, gfci upgrade, change vanity, upgrade shower; unit 6: bathroom remodel; unit 7: kitchen & bathroom remodelDetails
unit 5: bathroom remodel, gfci upgrade, change vanity, upgrade shower; unit 6: bathroom remodel; unit 7: kitchen & bathroom remodel | $70,000 |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 30 Junior Tr | Golden Star Construction | adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights.Details
adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights. | $30,000 |
| Aug 15, 2020 | Completed final sign-off Aug 2021 | 30 Junior Tr | Golden Star Construction | bathroom (~100 sqft) remodel in kind, replace 1 shower, 1 sink, 1 toilet. no structural changes, including meps, fixtures to remain in same locationDetails
bathroom (~100 sqft) remodel in kind, replace 1 shower, 1 sink, 1 toilet. no structural changes, including meps, fixtures to remain in same location | $7,000 |
| Mar 9, 2020 | Never finaled issued Jun 2020, no final | 664 27th Av | Golden Star Construction | add bath on 2nd fl by converting (e) closet.Details
add bath on 2nd fl by converting (e) closet. | $12,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 2225 23rd St | Golden Star Construction | unit # 209: bathroom remodel in kind.Details
unit # 209: bathroom remodel in kind. | $9,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 50 Midcrest Wy | Golden Star Construction | remodel kitchen, counter top. update electrical and plumbing.Details
remodel kitchen, counter top. update electrical and plumbing. | $24,000 |
| Jul 18, 2019 | Never finaled issued Aug 2019, no final | 33 Chenery St | Golden Star Construction | remodel kitchen and remove small section of e wallDetails
remodel kitchen and remove small section of e wall | $12,000 |