Angeline Askham
- Listed as
- architect
- Firm
- Hulburd Design
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to May 2019
12 permits since 2000 (architect on 12 permits): 6 completed, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 22, 2019 | Never finaled issued May 2019, no final | 236 Moncada Wy | Vista Knoll Construction | replacement of (e) aluminum windows at side of residence w/ new marvin casement windows. location size to remain unchanged. u-factor to be 0.32 or better. n/a for maher.Details
replacement of (e) aluminum windows at side of residence w/ new marvin casement windows. location size to remain unchanged. u-factor to be 0.32 or better. n/a for maher. | $5,000 |
| Dec 28, 2018 | Never finaled issued Feb 2019, no final | 236 Moncada Wy | Vista Knoll Construction | kitchen remodel, demo of stud wall, (e) cabinets, finish flooring, drywall as req'd, remove and replace recessed light fixtures, plumbing and replace appliances w/ newDetails
kitchen remodel, demo of stud wall, (e) cabinets, finish flooring, drywall as req'd, remove and replace recessed light fixtures, plumbing and replace appliances w/ new | $50,000 |
| Mar 8, 2016 | Expired or cancelled expired Dec 2025 | 65 Montclair Tr | Dromhus Inc. | demo of select int. walls, decorative ceiling elements, casework, plbg, fixtures & all lighting. new stru framing where req. sheetrock, finishes, demo (e) wood burning fireplace. new surround & hearth on dining rm fireplace. add convenience outlets.all other elec/data to remain. add wet bar @ 2nd flDetails
demo of select int. walls, decorative ceiling elements, casework, plbg, fixtures & all lighting. new stru framing where req. sheetrock, finishes, demo (e) wood burning fireplace. new surround & hearth on dining rm fireplace. add convenience outlets.all other elec/data to remain. add wet bar @ 2nd fl | $500,000 |
| Oct 22, 2014 | Expired or cancelled expired Mar 2018 | 3627 21st St | Hadley General Contractors Inc | revision to 2014-06-03-7341. reconfigure of rooms on 1st & 2nd floors. add 1 bathroom. level 1st fl concrete slab. remove bay window on back side of house. route to cyril yu for plan check per bldg inspector joseph yu.Details
revision to 2014-06-03-7341. reconfigure of rooms on 1st & 2nd floors. add 1 bathroom. level 1st fl concrete slab. remove bay window on back side of house. route to cyril yu for plan check per bldg inspector joseph yu. | $50,000 |
| Jun 3, 2014 | Expired or cancelled expired Mar 2018 | 3627 21st St | Hadley General Contractors Inc | demo of int finishes, appliances, plbg & casework on 3rd floor. int remodel of (e) includ removal of select int walls, reconfigured interior spaces, new stair (2nd to 3rd floor). new windows, one door, in locations not visible form street. install type 'x' gyb in garage for 1-hr fire separation.Details
demo of int finishes, appliances, plbg & casework on 3rd floor. int remodel of (e) includ removal of select int walls, reconfigured interior spaces, new stair (2nd to 3rd floor). new windows, one door, in locations not visible form street. install type 'x' gyb in garage for 1-hr fire separation. | $480,000 |
| Jun 2, 2014 | Completed final sign-off Feb 2015 | 122 Duncan St | Vista Knoll Construction | replace front window in unit #120 w/wood same size/location. replace existing vinyl windows with new marvin ulitmate fixed and casement windows at front elevation. demo of int finishes, plumbing, appliances in unit #122 int remodle inc bathroom & relocate ktichen, removal of int walls.Details
replace front window in unit #120 w/wood same size/location. replace existing vinyl windows with new marvin ulitmate fixed and casement windows at front elevation. demo of int finishes, plumbing, appliances in unit #122 int remodle inc bathroom & relocate ktichen, removal of int walls. | $76,500 |
| May 21, 2014 | Expired or cancelled expired Mar 2018 | 3627 21st St | Hadley General Contractors Inc | removal of interior finishes, casework, plumbing fixtures, and appliances on 2nd and 3rd flrs. exploratory holes only at 3rd floorDetails
removal of interior finishes, casework, plumbing fixtures, and appliances on 2nd and 3rd flrs. exploratory holes only at 3rd floor | $21,000 |
| Jan 7, 2014 | Completed final sign-off Jun 2014 | 27 Maiden Ln | Hurst & Siebert Inc | revision to appl #2013.08.23.5067 - lobby remodel & interior finishes, revised work scope, store front & signage work under seperate permits.Details
revision to appl #2013.08.23.5067 - lobby remodel & interior finishes, revised work scope, store front & signage work under seperate permits. | |
| Mar 11, 2013 | Completed final sign-off Oct 2013 | 2513 Pacific Av | Cal C A D E Construction Inc | interior demo of (e) kitchen, back stair from 2nd to 3rd fl, interior walls, interior remodel of kitchen, 2 bathrooms, new pantry, partial new stair (reconfigured), new handrails, guarddrails, closets, storage room and new fireplace, surround & mantel.Details
interior demo of (e) kitchen, back stair from 2nd to 3rd fl, interior walls, interior remodel of kitchen, 2 bathrooms, new pantry, partial new stair (reconfigured), new handrails, guarddrails, closets, storage room and new fireplace, surround & mantel. | $190,000 |
| Jul 11, 2012 | Completed final sign-off May 2016 | 3636 Washington St | Upscale Construction Inc. | interior remodel of a guest suite & bathroom, additon of one bathroom, one sleeping room & mud room on the ground floor (lower level).Details
interior remodel of a guest suite & bathroom, additon of one bathroom, one sleeping room & mud room on the ground floor (lower level). | $40,000 |
| Jul 10, 2012 | Completed final sign-off Jun 2016 | 3636 Washington St | Upscale Construction Inc. | interior remodel of two bathrooms, laundry, addition of one bathroom at the third floor.Details
interior remodel of two bathrooms, laundry, addition of one bathroom at the third floor. | $700,000 |
| Apr 25, 2011 | Completed final sign-off Dec 2012 | 1516 Guerrero St | Seastar Construction Co | demolish exist wood courtyard staircase and replace in kind w/ metal staircase.Details
demolish exist wood courtyard staircase and replace in kind w/ metal staircase. | $10,000 |