Andy Jung-Wah Kwan
- License
- E20850
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E20850 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Sep 2020 to Mar 2026
3 permits since 2000 (engineer on 3 permits): 1 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cal State Constructors Inc
- Engineers
- Daniel Li, Janey Chan, Matthew Fong, Qingwen Xi, Zhong Qiu
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 permit has no location and is not shown.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 3, 2026 | In progress issued Apr 2026 | 1095 Indiana St | ref 202510308544- to include replacing electrical wiring for new paint bus boothDetails
ref 202510308544- to include replacing electrical wiring for new paint bus booth | $75,000 | |
| Nov 17, 2020 | Never finaled issued Oct 2021, no final | 425 Geneva Av | Cal State Constructors Inc | the work includes electrical, overhead & structural installation of traction power feeder cables, feeder breaker & switchgear, system monitoring & control, and replacement of the (e) overhead cables and supporting pole. reconstruct an (e) overhead contact system (ocs) pole and foundation andDetails
the work includes electrical, overhead & structural installation of traction power feeder cables, feeder breaker & switchgear, system monitoring & control, and replacement of the (e) overhead cables and supporting pole. reconstruct an (e) overhead contact system (ocs) pole and foundation and | $3,197,014 |
| Sep 10, 2020 | Completed final sign-off Feb 2023 | 1001 22nd St | installation of nine electrical bus charging statons & an equipment distribution center at sfmta woods bus yard. all of the equipment will be installed outside of the building within the yard.Details
installation of nine electrical bus charging statons & an equipment distribution center at sfmta woods bus yard. all of the equipment will be installed outside of the building within the yard. | $2,600,000 |