14 permits since 2000 (contractor on 14 permits, designer on 1 permit): 8 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Serina Calhoun (2), Aaron Lim, Audrey Tse
- Engineers
- Matthew Stillwell (2), Michael Hom, Sean Cheng
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 6
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2026 | In progress issued Sep 2026 | 1979 09th Av | Hawk Hill Construction Inc | bathroom remodel, 1/2 bath creation, media room creation (320 sq.ft), relocate laundry appliances into garage. add 240 square foot new space on 1st floorDetails
bathroom remodel, 1/2 bath creation, media room creation (320 sq.ft), relocate laundry appliances into garage. add 240 square foot new space on 1st floor | $50,000 |
| Jul 6, 2026 | In progress issued Sep 2026 | 1894 Great Hy | Hawk Hill Construction Inc | remodel existing home including new interior stair connecting level 1 and level 2. the conversion of a finished office space into a bedroom, a relocated bath, a relocated laundry room, new walkin closet, new exterior doors and window to match existing. remodel (e) kitchen in kind.Details
remodel existing home including new interior stair connecting level 1 and level 2. the conversion of a finished office space into a bedroom, a relocated bath, a relocated laundry room, new walkin closet, new exterior doors and window to match existing. remodel (e) kitchen in kind. | $100,000 |
| May 21, 2026 | In progress issued Jun 2026 | 3443 Balboa St | Hawk Hill Construction Inc | g/f commercial: remove non-load bearing walls. new roof at g/f lightwell only. ada upgrades.Details
g/f commercial: remove non-load bearing walls. new roof at g/f lightwell only. ada upgrades. | $90,000 |
| May 21, 2026 | In progress issued Jun 2026 | 3439 Balboa St | Hawk Hill Construction Inc | residential: remove juliet balcony at 2/f. replace entry gate at residential entrance.Details
residential: remove juliet balcony at 2/f. replace entry gate at residential entrance. | $5,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 3443 Balboa St | Hawk Hill Construction Inc | remove (e) drywall @ ground floor. exploratory demo patch & repair in kind to review structural member. roof repair to address complaint. minor demo & patching. ref to complaint #202654811Details
remove (e) drywall @ ground floor. exploratory demo patch & repair in kind to review structural member. roof repair to address complaint. minor demo & patching. ref to complaint #202654811 | $1,200 |
| Mar 5, 2026 | Completed final sign-off Oct 2026 | 277 Bemis St | Hawk Hill Construction Inc | 1st fl. rooms down remodel:partial conversion of (e) garage space to habitable space. new laundry, bath, bedroom & storage. new mechanical electrical and plumbing. no non structural interior partition walls. no change to (e) structure. no expansion of building envelope or work visible from streetDetails
1st fl. rooms down remodel:partial conversion of (e) garage space to habitable space. new laundry, bath, bedroom & storage. new mechanical electrical and plumbing. no non structural interior partition walls. no change to (e) structure. no expansion of building envelope or work visible from street | $115,000 |
| Jan 27, 2026 | Completed final sign-off Oct 2026 | 273 Vienna St | Hawk Hill Construction Inc | rebuild front staircaseDetails
rebuild front staircase | $5,000 |
| Oct 30, 2025 | Completed final sign-off Dec 2025 | 40 Capra Wy | Hawk Hill Construction Inc | revision to bpa 202508042207: change in materials for windows. casement + fixed + double hung. same location.Details
revision to bpa 202508042207: change in materials for windows. casement + fixed + double hung. same location. | |
| Aug 4, 2025 | Completed final sign-off Sep 2025 | 1580 Dolores St | Hawk Hill Construction Inc | to comply with physical inspection report #cc-8710Details
to comply with physical inspection report #cc-8710 | $2,650 |
| Aug 4, 2025 | Expired or cancelled withdrawn Aug 2025 | 1582 Dolores St | Hawk Hill Construction Inc | to comply with physical inspeciton report#cc-8710.building item #4-revert unapporved work back to its last legal approval,ref pa#201810223828Details
to comply with physical inspeciton report#cc-8710.building item #4-revert unapporved work back to its last legal approval,ref pa#201810223828 | $6,500 |
| Aug 4, 2025 | Completed final sign-off Nov 2025 | 1928 Pierce St | Hawk Hill Construction Inc | in kind bathroom remodel, (2nd floor)Details
in kind bathroom remodel, (2nd floor) | $65,000 |
| Aug 4, 2025 | Completed final sign-off Dec 2025 | 40 Capra Wy | Hawk Hill Construction Inc | windows replacement in kind at south elevation. 30 windows, u<=0.3Details
windows replacement in kind at south elevation. 30 windows, u<=0.3 | $42,000 |
| Jun 18, 2025 | Completed final sign-off Aug 2025 | 300 Prague St | Hawk Hill Construction Inc | #1: remodel (e) kitchen and (e) bath in kind. replace counters, cabinets, floor, new vanity, new plumbing no change to floor layout. no change to wall layout. no structual work. maintain all (e) fire rating and separation.Details
#1: remodel (e) kitchen and (e) bath in kind. replace counters, cabinets, floor, new vanity, new plumbing no change to floor layout. no change to wall layout. no structual work. maintain all (e) fire rating and separation. | $28,000 |
| Feb 19, 2025 | Completed final sign-off May 2025 | 2210 45th Av | Hawk Hill Construction Inc | partial remodel of kitchen in existing footprint. no change to kitchen layout, new cabinets, flooring, lighting, and plumbing. enlarge existing opening to kitchen in wall between kitchen and dining. new kitchen hood.Details
partial remodel of kitchen in existing footprint. no change to kitchen layout, new cabinets, flooring, lighting, and plumbing. enlarge existing opening to kitchen in wall between kitchen and dining. new kitchen hood. | $17,500 |