Andrew Mann
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Andrew Mann Architecture
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Jul 2026
59 permits since 2000 (architect on 56 permits, engineer on 2 permits, authorized agent-others on 1 permit): 47 completed, 6 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 30, 2026 | Completed final sign-off Sep 2026 | 1631 Grove St | Saturn Construction Co | revision to bpa 202504285334 and 202501168489. updates to t24.Details
revision to bpa 202504285334 and 202501168489. updates to t24. | |
| Apr 28, 2025 | Completed final sign-off Sep 2026 | 1631 Grove St | Marr B Olsen Inc, Saturn Construction Co | revision to pa #202501168489. remove and replace exterior property line wall, windows, and skylight at rear deck. replace ground floor roof over gindline 1-2 with new roof to match existing asphalt roof and new skylight.Details
revision to pa #202501168489. remove and replace exterior property line wall, windows, and skylight at rear deck. replace ground floor roof over gindline 1-2 with new roof to match existing asphalt roof and new skylight. | $35,000 |
| Jan 16, 2025 | Completed final sign-off Sep 2026 | 1631 Grove St | Saturn Construction Co | 3 story remodel: new office, office bath, game room, laundry, new windows & rear entry @ g/f w/ new conrete steps. new wood deck & stair at rear yard to main floor w/ new rear facing windows/doors. reconfiguration of 2 bed, kids bath, & primary bed.Details
3 story remodel: new office, office bath, game room, laundry, new windows & rear entry @ g/f w/ new conrete steps. new wood deck & stair at rear yard to main floor w/ new rear facing windows/doors. reconfiguration of 2 bed, kids bath, & primary bed. | $400,000 |
| May 22, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | Arrow Builders Inc | revision to pa# 202401234458 revised structural detailsDetails
revision to pa# 202401234458 revised structural details | |
| May 10, 2024 | Completed final sign-off Oct 2025 | 2006 Washington St | Moroso Construction Inc | rev 202009305599- unit 2- alter interior stairs and hand railsDetails
rev 202009305599- unit 2- alter interior stairs and hand rails | $20,000 |
| Jan 25, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | Arrow Builders Inc | new deck in the rear. meeting section 130 & 134 of sf planning code. new exterior lightsDetails
new deck in the rear. meeting section 130 & 134 of sf planning code. new exterior lights | $25,000 |
| Jan 23, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | Arrow Builders Inc | the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroomDetails
the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroom | $225,000 |
| Aug 23, 2023 | Expired or cancelled expired Oct 2025 | 2006 Washington St | Moroso Construction Inc | unit#2: revision to pa# 202010025727, revised scope of window replacement & t24.Details
unit#2: revision to pa# 202010025727, revised scope of window replacement & t24. | |
| Aug 23, 2023 | Expired or cancelled expired Oct 2025 | 2006 Washington St | Moroso Construction Inc | unit#2: revision to pa# 202009305599, alteration of (e) stair & structural design to be sudmitted on separate , deferred submission, revised mech, elec & lighting.Details
unit#2: revision to pa# 202009305599, alteration of (e) stair & structural design to be sudmitted on separate , deferred submission, revised mech, elec & lighting. | |
| Jan 9, 2023 | Never finaled issued Feb 2023, no final | 75 Howard St | Baxter Construction | unit 2004: revision to no-plan permit 202112094064. remove closet doors and shelving in 4 rooms, replace with new. install new kitchen countertop and new built-in cabinets in 6 rooms with led lighting.Details
unit 2004: revision to no-plan permit 202112094064. remove closet doors and shelving in 4 rooms, replace with new. install new kitchen countertop and new built-in cabinets in 6 rooms with led lighting. | $10,000 |
| Apr 27, 2022 | Never finaled issued Mar 2023, no final | 3719 22nd St | Ewen Utting Inc. | revision to pa# 201810233961. interior plan layout changes on proposed 1st fl. updated electrical & mechanical at basement. updated t24 reports.Details
revision to pa# 201810233961. interior plan layout changes on proposed 1st fl. updated electrical & mechanical at basement. updated t24 reports. | $2,500 |
| Mar 25, 2022 | Never finaled filed Mar 2022, never issued | 31 Elk St | alteration and addition to an (e) 2 story single family house. vertical addition: a new 3rd story and roof deck above the (e) 2 story house & lowering the ground fl to create new living area. horizontal additions rear of 1st & ground fl. alteration to exterior front facade & interior living area.Details
alteration and addition to an (e) 2 story single family house. vertical addition: a new 3rd story and roof deck above the (e) 2 story house & lowering the ground fl to create new living area. horizontal additions rear of 1st & ground fl. alteration to exterior front facade & interior living area. | $1,325,000 | |
| Oct 2, 2020 | Expired or cancelled expired Oct 2025 | 2006 Washington St | Moroso Construction Inc | unit 2: exterior window and door replacement for an individual unit withing a multi-unit building.Details
unit 2: exterior window and door replacement for an individual unit withing a multi-unit building. | $2,500 |
| Sep 30, 2020 | Completed final sign-off Oct 2025 | 2006 Washington St | Moroso Construction Inc | unit 2: interior alteration: reconfigure interior non-structural partitions walls.Details
unit 2: interior alteration: reconfigure interior non-structural partitions walls. | $25,000 |
| May 31, 2019 | Completed final sign-off Aug 2020 | 218 10th Av | Jeff King And Company Inc | revision to pa's 201806222695, 201808308757 & 201904036998. relocation of ground floor shear wall, plumbing and electrical.Details
revision to pa's 201806222695, 201808308757 & 201904036998. relocation of ground floor shear wall, plumbing and electrical. | |
| Oct 23, 2018 | Never finaled issued Nov 2019, no final | 3719 22nd St | Underpinning Specialist Inc. | horizontal addition. raise (e) 1st & 2nd stories to create a (n) garage entry, ramp & curbcut within the footprint. horizontal additions at the rear at 1st, 2nd, & 3rd stories. a (n) basement lvl at rear half of downsloping lot. full fire sprinkler system added under separate permit.Details
horizontal addition. raise (e) 1st & 2nd stories to create a (n) garage entry, ramp & curbcut within the footprint. horizontal additions at the rear at 1st, 2nd, & 3rd stories. a (n) basement lvl at rear half of downsloping lot. full fire sprinkler system added under separate permit. | $587,228 |
| Aug 30, 2018 | Completed final sign-off Aug 2020 | 218 10th Av | Jeff King And Company Inc | rev to pa# 201806222695; revision consists of a new garage in the 1st floor and new driveway and curb cut, a new side yard door.Details
rev to pa# 201806222695; revision consists of a new garage in the 1st floor and new driveway and curb cut, a new side yard door. | $50,000 |
| Apr 29, 2016 | Completed final sign-off Nov 2018 | 2812 Laguna St | Jeff King And Company Inc | (n) 3rd story addition to include (n) stairway from (e) 2nd fl. (n) bathrm, bedrm & living space to (e) 2-story single family residence. removal of non-complying property line window @ south face on 1st story (e) residence.Details
(n) 3rd story addition to include (n) stairway from (e) 2nd fl. (n) bathrm, bedrm & living space to (e) 2-story single family residence. removal of non-complying property line window @ south face on 1st story (e) residence. | $435,000 |
| Nov 3, 2015 | Completed final sign-off Aug 2016 | 104 Funston Av | Jeff King And Company Inc | renovate (e) basement-lower (e) slab of non conforming bathroom, office & laundry to provide code compliant headroom. relocate (e) bathroom, new finishes, elec/plmg throughout.3 new windows at basement. main floor-new fireplace surround & case work in (e) living room.Details
renovate (e) basement-lower (e) slab of non conforming bathroom, office & laundry to provide code compliant headroom. relocate (e) bathroom, new finishes, elec/plmg throughout.3 new windows at basement. main floor-new fireplace surround & case work in (e) living room. | $143,000 |
| Mar 20, 2015 | Completed final sign-off Jul 2015 | 921 Oak St | Hakewill Construction Co. Inc. | interior kitchen remodel in 2nd floor unit of a 2 unit building. no change in sq. ft.Details
interior kitchen remodel in 2nd floor unit of a 2 unit building. no change in sq. ft. | $48,525 |
| Mar 13, 2015 | Completed final sign-off Jul 2016 | 748 Church St | Saturn Construction Co | removal of a non-conforming rear decks. int renovation of (e) two unit w/expansion of the lower unit into unconditioned space on the 1st flr (n) full bathroom, (n) laundry rm, (n) bedroom. (n) kitchen in (e) location, (n) full bath on 2nd flr. 3rd flr remains. add roof deck. new interior stair.Details
removal of a non-conforming rear decks. int renovation of (e) two unit w/expansion of the lower unit into unconditioned space on the 1st flr (n) full bathroom, (n) laundry rm, (n) bedroom. (n) kitchen in (e) location, (n) full bath on 2nd flr. 3rd flr remains. add roof deck. new interior stair. | $489,000 |
| Feb 2, 2015 | Completed final sign-off May 2015 | 1769 Green St | Lee & Company Contractors Inc | replacement of exterior front stairs, no interior work. no change in sf or lot coverage.Details
replacement of exterior front stairs, no interior work. no change in sf or lot coverage. | $14,500 |
| Nov 6, 2014 | Completed final sign-off May 2015 | 1954 15th St | Lee & Company Contractors Inc | the project consists of the renovation of the upper unit. the work includes kitchen & bath remodel, new casework in the living room, & new electrical & lighting in specific locations.Details
the project consists of the renovation of the upper unit. the work includes kitchen & bath remodel, new casework in the living room, & new electrical & lighting in specific locations. | $105,000 |
| Aug 7, 2014 | Completed final sign-off Apr 2015 | 15 Montalvo Av | Hakewill Construction Co. Inc. | first floor kitchen and bath remodel.Details
first floor kitchen and bath remodel. | $78,000 |
| Jul 25, 2014 | Completed final sign-off Nov 2015 | 550 Mississippi St | T T General Construction | a demolition of an (e) 2nd floor deck and construction of a new horizontal addition containing a stairway, family room and new deck. addition of a new bedroom and bathroom within (e) non conditioned space.Details
a demolition of an (e) 2nd floor deck and construction of a new horizontal addition containing a stairway, family room and new deck. addition of a new bedroom and bathroom within (e) non conditioned space. | $153,000 |
| May 30, 2014 | Completed final sign-off Nov 2015 | 198 32nd Av | Jeff King And Company Inc | renovate kitchen, laundry room, bathrooms on all floors, renovate master suite. new outlets and lighting t/o, new hvac, install insulation, no change in square footage. no changes to exterior of bldg.Details
renovate kitchen, laundry room, bathrooms on all floors, renovate master suite. new outlets and lighting t/o, new hvac, install insulation, no change in square footage. no changes to exterior of bldg. | $387,000 |
| Apr 30, 2014 | Completed final sign-off Nov 2015 | 198 32nd Av | Jeff King And Company Inc | windows replacement & repair. windows are seen on a right of way.Details
windows replacement & repair. windows are seen on a right of way. | $8,200 |
| Apr 16, 2013 | Completed final sign-off Oct 2013 | 788 16th Av | Hakewill Construction Co. Inc. | alteration to an (e) residence involving the re-configuration of an existing 1/f kitchen and office into a renovated kitchen, powder room and closet on the 2/f, a bathrm and walk-in closet will be reconfigured into 2 bathrms, (n) windows (double-hung wood) and a (n) wood door in kitcheDetails
alteration to an (e) residence involving the re-configuration of an existing 1/f kitchen and office into a renovated kitchen, powder room and closet on the 2/f, a bathrm and walk-in closet will be reconfigured into 2 bathrms, (n) windows (double-hung wood) and a (n) wood door in kitche | $137,000 |
| May 30, 2012 | Expired or cancelled cancelled Sep 2012 | 1031 Jones St | Barker-O'donoghue Master Bldrs | renovation to an existing kitchen including frame in of 6 s.f. of additional space.Details
renovation to an existing kitchen including frame in of 6 s.f. of additional space. | $71,500 |
| Jan 24, 2012 | Completed final sign-off Jul 2012 | 1451 Masonic Av | Hakewill Construction Co. Inc. | interior renovation @ kitchen - new cabients, finishes, appliances replaced,new fixtures @ (e) powder room. changes to exterior openings at south & west elevations, side & rear windows & doors replaced, bay window & new back door. no change to (e) sq footage.Details
interior renovation @ kitchen - new cabients, finishes, appliances replaced,new fixtures @ (e) powder room. changes to exterior openings at south & west elevations, side & rear windows & doors replaced, bay window & new back door. no change to (e) sq footage. | $72,900 |
| May 6, 2011 | Completed final sign-off Apr 2012 | 201 Genebern Wy | Sing Wong | legalize/interior remodel at 1st & 2nd floors. new partial foundation, re-furbish (e) kitchen at 2nd floorDetails
legalize/interior remodel at 1st & 2nd floors. new partial foundation, re-furbish (e) kitchen at 2nd floor | $82,000 |
| Apr 15, 2011 | Completed final sign-off Nov 2012 | 155 San Anselmo Av | Saturn Construction Co | revise scope of permit #201102150234. reduce size of rear west and east side ground floor. additions. revise windows + interior layout. see job decription on title page a0.1 for additional description.Details
revise scope of permit #201102150234. reduce size of rear west and east side ground floor. additions. revise windows + interior layout. see job decription on title page a0.1 for additional description. | $50,000 |
| Mar 11, 2011 | Never finaled issued Oct 2011, no final | 444 36th Av | Seastar Construction Co | revision to 201012287482. a new metal spiral stair to be installed at the rear elevation. the new stair will connect the (e) upper deck to the lower deck below.Details
revision to 201012287482. a new metal spiral stair to be installed at the rear elevation. the new stair will connect the (e) upper deck to the lower deck below. | $3,500 |
| Feb 8, 2011 | Completed final sign-off Oct 2011 | 59 Mirabel Av | V And Company, Incorporated | partial upgrade extg foundation 30 lf. cap extg foundations below grade in extg crawl space. add 1 skylightDetails
partial upgrade extg foundation 30 lf. cap extg foundations below grade in extg crawl space. add 1 skylight | $2,000 |
| Dec 10, 2010 | Expired or cancelled cancelled Jul 2018 | 1625 Monterey Bl | the project consists of a new detached assceesory structure placed on the buildable area of the lot. the structure is an open garden trellis on a concrete slab & a new concrete stair on the south side of the new trellis.Details
the project consists of a new detached assceesory structure placed on the buildable area of the lot. the structure is an open garden trellis on a concrete slab & a new concrete stair on the south side of the new trellis. | $15,000 | |
| Jul 27, 2010 | Never finaled issued May 2011, no final | 3733 21st St | Saturn Construction Co | new horizontal 2 story rear addition that is to contain an expanded kitchen & renovated sitting room on the ground floor & a new bedroom, bathroom, & roof deck on the 2nd floor. (e) attic convert to 2nd floor.Details
new horizontal 2 story rear addition that is to contain an expanded kitchen & renovated sitting room on the ground floor & a new bedroom, bathroom, & roof deck on the 2nd floor. (e) attic convert to 2nd floor. | $255,000 |
| Jun 25, 2010 | Expired or cancelled cancelled Mar 2020 | 3801 Jackson St | interior remodel at all levels including horizontal extension at the first, second, and third levels. relocation of garage to cherry st. facade.Details
interior remodel at all levels including horizontal extension at the first, second, and third levels. relocation of garage to cherry st. facade. | $250,000 | |
| May 14, 2010 | Completed final sign-off Oct 2010 | 61 Sharon St | Saturn Construction Co | compose of a renovation of the (e) kitchen in the upper unit of a two unit bldg. the scope is to include (n) fixtures & finishes throughout & (n) windows on the rear facade. (e) bldg. is comprised of 3-stories: garage level, 63 sharon st. & 61 sharon st. (work @ 61 sharon st only).Details
compose of a renovation of the (e) kitchen in the upper unit of a two unit bldg. the scope is to include (n) fixtures & finishes throughout & (n) windows on the rear facade. (e) bldg. is comprised of 3-stories: garage level, 63 sharon st. & 61 sharon st. (work @ 61 sharon st only). | $49,000 |
| Dec 16, 2009 | Completed final sign-off Sep 2010 | 1664 09th Av | Bruce Binder Const. | reconfiguration of (e) kitchen, laundry & powder rm. with a 49 sq. ft. addition at the rear of the house. kitchen, laundry and powder room to have new fixtures and finishes throughout.Details
reconfiguration of (e) kitchen, laundry & powder rm. with a 49 sq. ft. addition at the rear of the house. kitchen, laundry and powder room to have new fixtures and finishes throughout. | $83,500 |
| Dec 24, 2008 | Completed final sign-off Apr 2010 | 428 Yerba Buena Av | new horizontal addition at lower and 1st level to include new family room, laundry room, secondary entry, reconfigure interior stair from ground level. existing kitchen to be reconfigured. new exterior patio at rear accessed by door. new skylight over stair.Details
new horizontal addition at lower and 1st level to include new family room, laundry room, secondary entry, reconfigure interior stair from ground level. existing kitchen to be reconfigured. new exterior patio at rear accessed by door. new skylight over stair. | $310,000 | |
| Oct 31, 2008 | Completed final sign-off Dec 2008 | 125 Evelyn Wy | revision to pa #200710266578, add hip to roof above family rm bay windows.Details
revision to pa #200710266578, add hip to roof above family rm bay windows. | ||
| Oct 17, 2008 | Completed final sign-off Oct 2010 | 5 Sea View Tr | Jeff King And Company Inc | interior remodel-new conditioned space @attic level, new stairs connecting the (e) 2nd fl to new attic space, reconfigured master bath, bedrms on 2nd fl, replace finishes, fixtures in secondary baths on 2nd fl & powder rm @1st fl, exterior remodel-addition of 3 new dormers @roof, repl (e) windowsDetails
interior remodel-new conditioned space @attic level, new stairs connecting the (e) 2nd fl to new attic space, reconfigured master bath, bedrms on 2nd fl, replace finishes, fixtures in secondary baths on 2nd fl & powder rm @1st fl, exterior remodel-addition of 3 new dormers @roof, repl (e) windows | $300,000 |
| Aug 22, 2008 | Completed final sign-off Dec 2008 | 125 Evelyn Wy | revision to application 200710266578. add 3 sections of grade beams where no foundation existed.Details
revision to application 200710266578. add 3 sections of grade beams where no foundation existed. | $5,000 | |
| May 21, 2008 | Completed final sign-off Nov 2008 | 1230 18th St | renovation of interiors including new fixtures in three bathrooms, new finishes throughout, and reconfiguration of master bathroom and bedroom.Details
renovation of interiors including new fixtures in three bathrooms, new finishes throughout, and reconfiguration of master bathroom and bedroom. | $150,000 | |
| Mar 13, 2008 | Completed final sign-off Aug 2008 | 3964 20th St | interior remodel of (e) kitchen w/ one change to foot print. 200sf of effected space. new windows.Details
interior remodel of (e) kitchen w/ one change to foot print. 200sf of effected space. new windows. | $65,000 | |
| Nov 30, 2007 | Completed final sign-off May 2008 | 3725 20th St | addition of skylight at rear of house in new laundry room on first floor.Details
addition of skylight at rear of house in new laundry room on first floor. | $750 | |
| Oct 26, 2007 | Completed final sign-off Dec 2008 | 125 Evelyn Wy | remodel existing kitchen, family room addition, new bath on 2nd level.Details
remodel existing kitchen, family room addition, new bath on 2nd level. | $275,000 | |
| Sep 13, 2007 | Completed final sign-off Apr 2008 | 632 11th Av | new deck addition, door & window replacement, repair roof (flat) at rear of family room, deck & windows @ rear, remove existing stair @ rear, remove existing door & replace with wood window.Details
new deck addition, door & window replacement, repair roof (flat) at rear of family room, deck & windows @ rear, remove existing stair @ rear, remove existing door & replace with wood window. | $25,000 | |
| Jun 20, 2007 | Completed final sign-off Apr 2008 | 632 11th Av | Hakewill Construction Co. Inc. | interior remodel - kitchen remodel, reconfiguration of bathrooms and bedrooms per plan.Details
interior remodel - kitchen remodel, reconfiguration of bathrooms and bedrooms per plan. | $240,000 |
| Apr 25, 2007 | Completed final sign-off Oct 2007 | 1664 09th Av | replace in-kind of existing entry stairs.Details
replace in-kind of existing entry stairs. | $30,000 | |
| Apr 25, 2007 | Completed final sign-off Jan 2008 | 1600 16th Av | kitchen renovation, bedroom renovation, construct of new bathroom and laundry area.Details
kitchen renovation, bedroom renovation, construct of new bathroom and laundry area. | $115,000 | |
| Mar 23, 2007 | Completed final sign-off Feb 2008 | 561 Hill St | renovation of existing kitchen and powder room.Details
renovation of existing kitchen and powder room. | $53,000 | |
| Dec 28, 2006 | Completed final sign-off Mar 2007 | 715 Moultrie St | renovation of existing kitchen, bathroom and laundry room. addition of an interior partition to create w/ hallway. replace 1 exterior door. flourescent lighting.Details
renovation of existing kitchen, bathroom and laundry room. addition of an interior partition to create w/ hallway. replace 1 exterior door. flourescent lighting. | $58,000 | |
| Dec 12, 2006 | Completed final sign-off May 2008 | 3725 20th St | remove (e) one story rear addition containing family room, laundry & replace with new one story rear addition containing new family room, new bathroom, new laundry & new home office.Details
remove (e) one story rear addition containing family room, laundry & replace with new one story rear addition containing new family room, new bathroom, new laundry & new home office. | $125,000 | |
| Nov 6, 2006 | Completed final sign-off Feb 2007 | 388 Beale St | Added Dimensions Inc. | remove existing interior partition (not full height), construct new interior partition (not full height). relocate (e) light fixtures on ground floor retail space. no exterior work.Details
remove existing interior partition (not full height), construct new interior partition (not full height). relocate (e) light fixtures on ground floor retail space. no exterior work. | $10,000 |
| Jul 10, 2006 | Completed final sign-off Jul 2006 | 921 Oak St | replace (e) fence 20' at tradesmen's alley, new interior doors, raised floor and utility sink @ storage room. fence not visable from street.Details
replace (e) fence 20' at tradesmen's alley, new interior doors, raised floor and utility sink @ storage room. fence not visable from street. | $6,500 | |
| Jun 27, 2005 | Completed final sign-off Mar 2006 | 172 Day St | V And Company, Incorporated | replace stucco,metal window w/wood window,tile roof w/ copper on front facade.new exterior light.Details
replace stucco,metal window w/wood window,tile roof w/ copper on front facade.new exterior light. | $45,000 |
| Apr 22, 2005 | Completed final sign-off Oct 2005 | 57 High St | rev. to appl#200502165598 remodel kitchen, bathroom #2 closet remodel,drywall replacement,living rooDetails
rev. to appl#200502165598 remodel kitchen, bathroom #2 closet remodel,drywall replacement,living roo | $45,000 | |
| Mar 28, 2005 | Completed final sign-off Jun 2007 | 55 Van Buren St | horizontal addition @g/f,replace 3/4 (e)foundation,renovation of g/f family room,office,studio.Details
horizontal addition @g/f,replace 3/4 (e)foundation,renovation of g/f family room,office,studio. | $190,000 |