Permit GraphShortlistSan Francisco building permits since 2000

Andrea Fleischman

License
C33867
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C33867 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, designer, engineer
Firm
Andrea Fleishman Architecture
On San Francisco permits
Aug 2008 to Apr 2024

15 permits since 2000 (architect on 11 permits, authorized agent-others on 2 permits, designer on 1 permit, engineer on 1 permit): 13 completed, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Continuum Construction (2), Knab Builders (2), Moreno Construction (2), 225 Shipley Inc, Celtic Custom Cabinets, Doherty Restoration, Inc., Handyman Heroes Inc., Living Structure Inc, Michael Mc Nulty Construction***Ask Id, Ryan Construction, Zack De Vito Inc
Architects
Andrew Germann, Karl Smith
Engineers
Dustin Muhn, Jason Lee
Authorized agents
Robert Newell

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 5, 2024Completed
final sign-off Apr 2024
933 Valencia StContinuum Constructionrevision to permit# 202404059450: elimination of powder room from scope.
Details
Permit
202404059467
Permit issued
Apr 5, 2024
Final sign-off
Apr 11, 2024

revision to permit# 202404059450: elimination of powder room from scope.

Open the permit page

Jul 15, 2021Completed
final sign-off Jun 2022
50 Liberty StDoherty Restoration, Inc.1)renovation of extg kitchen and bathrooms and reconfiguring 2 extg bathrooms. 2)adding a bathroom to the ground floor in extg storage space. 3)in kind window replacement. 4)new code complaint handrail/guard rail at extg staircase.
Details
Permit
202107154441
Permit issued
Jul 16, 2021
Final sign-off
Jun 16, 2022

1)renovation of extg kitchen and bathrooms and reconfiguring 2 extg bathrooms. 2)adding a bathroom to the ground floor in extg storage space. 3)in kind window replacement. 4)new code complaint handrail/guard rail at extg staircase.

Open the permit page

$75,000
Mar 26, 2021Completed
final sign-off Feb 2023
1851 14th AvKnab Buildersrevision to pa# 201910114302. changing wood kickers on wood deck to steel. changing size of (e) window. adding a door at (e) storage space.
Details
Permit
202103267354
Permit issued
Jun 25, 2021
Final sign-off
Feb 24, 2023

revision to pa# 201910114302. changing wood kickers on wood deck to steel. changing size of (e) window. adding a door at (e) storage space.

Open the permit page

Jun 30, 2020Completed
final sign-off Mar 2022
1242 Arguello BlRyan Constructionadd bedroom in existing storage space. new sliding glass door and swing door @ rear facade. new sealed direct vent fireplace & enclosure.
Details
Permit
202006309382
Permit issued
Aug 27, 2020
Final sign-off
Mar 2, 2022

add bedroom in existing storage space. new sliding glass door and swing door @ rear facade. new sealed direct vent fireplace & enclosure.

Open the permit page

$70,000
Oct 11, 2019Completed
final sign-off Feb 2023
1851 14th AvKnab Builderscreate additional dwelling unit on 1st fl. adu per ord #95-17. reconfigure (e) interior stair to provide open layout on 2nd & 3rd fl. (n) 300 sq ft deck @ rear of 1st fl for open space requirement. (n) stair from 2nd fl to 1st fl adu. replace 3rd fl deck in-kind
Details
Permit
201910114302
Permit issued
Feb 1, 2021
Final sign-off
Feb 24, 2023

create additional dwelling unit on 1st fl. adu per ord #95-17. reconfigure (e) interior stair to provide open layout on 2nd & 3rd fl. (n) 300 sq ft deck @ rear of 1st fl for open space requirement. (n) stair from 2nd fl to 1st fl adu. replace 3rd fl deck in-kind

Open the permit page

$150,000
Jul 31, 2018Completed
final sign-off Dec 2018
236 Day StMoreno Constructionrevision to pa 2016-0219-0057s1, 2nd floor bathroom - w/d closet made bigger. 2nd fl bedroom closet moved location. 3rd fl - bathroom door moved location. roof deck added additional sq. ft.
Details
Permit
201807316066
Permit issued
Sep 10, 2018
Final sign-off
Dec 18, 2018

revision to pa 2016-0219-0057s1, 2nd floor bathroom - w/d closet made bigger. 2nd fl bedroom closet moved location. 3rd fl - bathroom door moved location. roof deck added additional sq. ft.

Open the permit page

Jul 11, 2018Completed
final sign-off Jan 2019
522 Joost AvHandyman Heroes Inc.adding new code compliant interior stair connecting the (e) grnd flr to (e) 2nd flr. demo 1 windoe and reducing size of 1 (e) window
Details
Permit
201807114279
Permit issued
Jul 19, 2018
Final sign-off
Jan 18, 2019

adding new code compliant interior stair connecting the (e) grnd flr to (e) 2nd flr. demo 1 windoe and reducing size of 1 (e) window

Open the permit page

$70,000
Jun 15, 2018Completed
final sign-off Nov 2024
1326 Grove StZack De Vito Inc, 225 Shipley Incchange of use per office of canabis & planing from medical cannabis to recreational cannabis. no construction; previous tenant improvement under 201711093642. maher n/a.
Details
Permit
201806152030
Permit issued
Nov 8, 2024
Final sign-off
Nov 19, 2024

change of use per office of canabis & planing from medical cannabis to recreational cannabis. no construction; previous tenant improvement under 201711093642. maher n/a.

Open the permit page

Mar 8, 2018Completed
final sign-off Dec 2018
46 Geary StCeltic Custom Cabinetsinterior t.i. work only. reconfiguring tenant space to provide an open layout. new kitchen, conference room, phone booths, new lighting, and rework hvac ductwork.
Details
Permit
201803083181
Permit issued
Mar 9, 2018
Final sign-off
Dec 18, 2018

interior t.i. work only. reconfiguring tenant space to provide an open layout. new kitchen, conference room, phone booths, new lighting, and rework hvac ductwork.

Open the permit page

$130,000
Nov 9, 2017Completed
final sign-off Nov 2018
1326 Grove Sttenant improvements, work includes: reconfiguring current retail space to allow 2 additional teller windows and new teller windows, counters, lighting, air conditioners and tankless water heater. n/a ordinance #155-13
Details
Permit
201711093642
Permit issued
Nov 20, 2017
Final sign-off
Nov 2, 2018

tenant improvements, work includes: reconfiguring current retail space to allow 2 additional teller windows and new teller windows, counters, lighting, air conditioners and tankless water heater. n/a ordinance #155-13

Open the permit page

$30,000
Jun 17, 2016Expired or cancelled
withdrawn Jan 2020
1786 San Jose Avremodel an (e) 2 story building with 3 commercial space on ground floor & 1 residential unit on the 2nd floor into 4 story building with a dental office on the 1st floor & 5 units on 2nd to 4th floors. new foundation, int walls, floors, windows, doors & bldg systems. ext walls to be replace in kind.
Details
Permit
201606170282

remodel an (e) 2 story building with 3 commercial space on ground floor & 1 residential unit on the 2nd floor into 4 story building with a dental office on the 1st floor & 5 units on 2nd to 4th floors. new foundation, int walls, floors, windows, doors & bldg systems. ext walls to be replace in kind.

Open the permit page

$2,000,000
Jun 8, 2016Expired or cancelled
expired Apr 2024
933 Valencia StLiving Structure Inc, Continuum Constructionside expansion of 2nd floor bay and enclosure of porch. relocation of 2nd floor star and construction of solid firewall. interior remodel of 2nd floor and replacement of existing frontside gate. all work approved per acoa 2019.0422 and separate bldg permit: 201810183599
Details
Permit
201606089424
Permit issued
Jun 16, 2021

side expansion of 2nd floor bay and enclosure of porch. relocation of 2nd floor star and construction of solid firewall. interior remodel of 2nd floor and replacement of existing frontside gate. all work approved per acoa 2019.0422 and separate bldg permit: 201810183599

Open the permit page

$35,000
Feb 19, 2016Completed
final sign-off Dec 2018
236 Day StMoreno Construction(work on front bldg). build new vertical 3rd fl addition which included bedrm, bathrm, & family room. work to include renovation of (e) kitchen on second flr. the addition will be topped w/flat roof & horizonatal wood cladding. all new 3rd flor windows will face the rear.
Details
Permit
201602190057
Permit issued
Nov 10, 2016
Final sign-off
Dec 18, 2018

(work on front bldg). build new vertical 3rd fl addition which included bedrm, bathrm, & family room. work to include renovation of (e) kitchen on second flr. the addition will be topped w/flat roof & horizonatal wood cladding. all new 3rd flor windows will face the rear.

Open the permit page

$250,000
May 19, 2015Completed
final sign-off Nov 2015
1814 Hyde StMichael Mc Nulty Construction***Ask Idrenovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm.
Details
Permit
201505196671
Permit issued
May 20, 2015
Final sign-off
Nov 18, 2015

renovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm.

Open the permit page

$80,000
Aug 19, 2008Completed
final sign-off Dec 2012
220 Golden Gate Avconvert portions of exist building to 174 congregate living units, dept of health clinic,retail. existing uses retained include auditorium, gym, cafe, childrens daycare. new fire life safety system, complying stairwells, accessible elevators, fire sprinklers, alarm sys.
Details
Permit
200808199494
Permit issued
Apr 7, 2009
Final sign-off
Dec 21, 2012

convert portions of exist building to 174 congregate living units, dept of health clinic,retail. existing uses retained include auditorium, gym, cafe, childrens daycare. new fire life safety system, complying stairwells, accessible elevators, fire sprinklers, alarm sys.

Open the permit page