Andrea Fleischman
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Andrea Fleishman Architecture
- On San Francisco permits
- Aug 2008 to Apr 2024
15 permits since 2000 (architect on 11 permits, authorized agent-others on 2 permits, designer on 1 permit, engineer on 1 permit): 13 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 5, 2024 | Completed final sign-off Apr 2024 | 933 Valencia St | Continuum Construction | revision to permit# 202404059450: elimination of powder room from scope.Details
revision to permit# 202404059450: elimination of powder room from scope. | |
| Jul 15, 2021 | Completed final sign-off Jun 2022 | 50 Liberty St | Doherty Restoration, Inc. | 1)renovation of extg kitchen and bathrooms and reconfiguring 2 extg bathrooms. 2)adding a bathroom to the ground floor in extg storage space. 3)in kind window replacement. 4)new code complaint handrail/guard rail at extg staircase.Details
1)renovation of extg kitchen and bathrooms and reconfiguring 2 extg bathrooms. 2)adding a bathroom to the ground floor in extg storage space. 3)in kind window replacement. 4)new code complaint handrail/guard rail at extg staircase. | $75,000 |
| Mar 26, 2021 | Completed final sign-off Feb 2023 | 1851 14th Av | Knab Builder | revision to pa# 201910114302. changing wood kickers on wood deck to steel. changing size of (e) window. adding a door at (e) storage space.Details
revision to pa# 201910114302. changing wood kickers on wood deck to steel. changing size of (e) window. adding a door at (e) storage space. | |
| Jun 30, 2020 | Completed final sign-off Mar 2022 | 1242 Arguello Bl | Ryan Construction | add bedroom in existing storage space. new sliding glass door and swing door @ rear facade. new sealed direct vent fireplace & enclosure.Details
add bedroom in existing storage space. new sliding glass door and swing door @ rear facade. new sealed direct vent fireplace & enclosure. | $70,000 |
| Oct 11, 2019 | Completed final sign-off Feb 2023 | 1851 14th Av | Knab Builder | create additional dwelling unit on 1st fl. adu per ord #95-17. reconfigure (e) interior stair to provide open layout on 2nd & 3rd fl. (n) 300 sq ft deck @ rear of 1st fl for open space requirement. (n) stair from 2nd fl to 1st fl adu. replace 3rd fl deck in-kindDetails
create additional dwelling unit on 1st fl. adu per ord #95-17. reconfigure (e) interior stair to provide open layout on 2nd & 3rd fl. (n) 300 sq ft deck @ rear of 1st fl for open space requirement. (n) stair from 2nd fl to 1st fl adu. replace 3rd fl deck in-kind | $150,000 |
| Jul 31, 2018 | Completed final sign-off Dec 2018 | 236 Day St | Moreno Construction | revision to pa 2016-0219-0057s1, 2nd floor bathroom - w/d closet made bigger. 2nd fl bedroom closet moved location. 3rd fl - bathroom door moved location. roof deck added additional sq. ft.Details
revision to pa 2016-0219-0057s1, 2nd floor bathroom - w/d closet made bigger. 2nd fl bedroom closet moved location. 3rd fl - bathroom door moved location. roof deck added additional sq. ft. | |
| Jul 11, 2018 | Completed final sign-off Jan 2019 | 522 Joost Av | Handyman Heroes Inc. | adding new code compliant interior stair connecting the (e) grnd flr to (e) 2nd flr. demo 1 windoe and reducing size of 1 (e) windowDetails
adding new code compliant interior stair connecting the (e) grnd flr to (e) 2nd flr. demo 1 windoe and reducing size of 1 (e) window | $70,000 |
| Jun 15, 2018 | Completed final sign-off Nov 2024 | 1326 Grove St | Zack De Vito Inc, 225 Shipley Inc | change of use per office of canabis & planing from medical cannabis to recreational cannabis. no construction; previous tenant improvement under 201711093642. maher n/a.Details
change of use per office of canabis & planing from medical cannabis to recreational cannabis. no construction; previous tenant improvement under 201711093642. maher n/a. | |
| Mar 8, 2018 | Completed final sign-off Dec 2018 | 46 Geary St | Celtic Custom Cabinets | interior t.i. work only. reconfiguring tenant space to provide an open layout. new kitchen, conference room, phone booths, new lighting, and rework hvac ductwork.Details
interior t.i. work only. reconfiguring tenant space to provide an open layout. new kitchen, conference room, phone booths, new lighting, and rework hvac ductwork. | $130,000 |
| Nov 9, 2017 | Completed final sign-off Nov 2018 | 1326 Grove St | tenant improvements, work includes: reconfiguring current retail space to allow 2 additional teller windows and new teller windows, counters, lighting, air conditioners and tankless water heater. n/a ordinance #155-13Details
tenant improvements, work includes: reconfiguring current retail space to allow 2 additional teller windows and new teller windows, counters, lighting, air conditioners and tankless water heater. n/a ordinance #155-13 | $30,000 | |
| Jun 17, 2016 | Expired or cancelled withdrawn Jan 2020 | 1786 San Jose Av | remodel an (e) 2 story building with 3 commercial space on ground floor & 1 residential unit on the 2nd floor into 4 story building with a dental office on the 1st floor & 5 units on 2nd to 4th floors. new foundation, int walls, floors, windows, doors & bldg systems. ext walls to be replace in kind.Details
remodel an (e) 2 story building with 3 commercial space on ground floor & 1 residential unit on the 2nd floor into 4 story building with a dental office on the 1st floor & 5 units on 2nd to 4th floors. new foundation, int walls, floors, windows, doors & bldg systems. ext walls to be replace in kind. | $2,000,000 | |
| Jun 8, 2016 | Expired or cancelled expired Apr 2024 | 933 Valencia St | Living Structure Inc, Continuum Construction | side expansion of 2nd floor bay and enclosure of porch. relocation of 2nd floor star and construction of solid firewall. interior remodel of 2nd floor and replacement of existing frontside gate. all work approved per acoa 2019.0422 and separate bldg permit: 201810183599Details
side expansion of 2nd floor bay and enclosure of porch. relocation of 2nd floor star and construction of solid firewall. interior remodel of 2nd floor and replacement of existing frontside gate. all work approved per acoa 2019.0422 and separate bldg permit: 201810183599 | $35,000 |
| Feb 19, 2016 | Completed final sign-off Dec 2018 | 236 Day St | Moreno Construction | (work on front bldg). build new vertical 3rd fl addition which included bedrm, bathrm, & family room. work to include renovation of (e) kitchen on second flr. the addition will be topped w/flat roof & horizonatal wood cladding. all new 3rd flor windows will face the rear.Details
(work on front bldg). build new vertical 3rd fl addition which included bedrm, bathrm, & family room. work to include renovation of (e) kitchen on second flr. the addition will be topped w/flat roof & horizonatal wood cladding. all new 3rd flor windows will face the rear. | $250,000 |
| May 19, 2015 | Completed final sign-off Nov 2015 | 1814 Hyde St | Michael Mc Nulty Construction***Ask Id | renovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm.Details
renovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm. | $80,000 |
| Aug 19, 2008 | Completed final sign-off Dec 2012 | 220 Golden Gate Av | convert portions of exist building to 174 congregate living units, dept of health clinic,retail. existing uses retained include auditorium, gym, cafe, childrens daycare. new fire life safety system, complying stairwells, accessible elevators, fire sprinklers, alarm sys.Details
convert portions of exist building to 174 congregate living units, dept of health clinic,retail. existing uses retained include auditorium, gym, cafe, childrens daycare. new fire life safety system, complying stairwells, accessible elevators, fire sprinklers, alarm sys. |