Dean Sanders
- Listed as
- contractor, engineer, pmt consultant/expediter
- Firm
- Ams Heating Inc.
- Based in
- Stockton
- On San Francisco permits
- May 2005 to Sep 2016
4 permits since 2000 (contractor on 2 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- W. L. Butler Construction Inc
- Architects
- Dennis Heath, Levy Design
- Engineers
- Mission Electric Co., Mitchell Scheflo, Source Refrigeration & Hvac
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 13, 2016 | Never finaled issued Sep 2016, no final | 475 Valencia St | A M S Heating Inc | hvac repair & new ducting throughout. arch reference #2016-0401-3749. n/a ordinance #155-13Details
hvac repair & new ducting throughout. arch reference #2016-0401-3749. n/a ordinance #155-13 | $50,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 1045 Mission St | A M S Heating Inc | 1st floor/fitness room: add mini split with fresh air intake. maher naDetails
1st floor/fitness room: add mini split with fresh air intake. maher na | $17,000 |
| Nov 25, 2014 | Completed final sign-off Oct 2015 | 1830 Ocean Av | W. L. Butler Construction Inc | interior demolition. install reach-in refrigerator. plumbing & electrical. fully accessible restrooms. new mechanical systems include rtus. repair & replace finishes. deffered submittals: sales area fixtures over 5'-9", storage shelving over 5'-9", fire alarm, fire sprinkler. exterior signage.Details
interior demolition. install reach-in refrigerator. plumbing & electrical. fully accessible restrooms. new mechanical systems include rtus. repair & replace finishes. deffered submittals: sales area fixtures over 5'-9", storage shelving over 5'-9", fire alarm, fire sprinkler. exterior signage. | $1,444,000 |
| May 2, 2005 | Completed final sign-off Mar 2007 | 310 Townsend St | renovation of existing 5 story on reinforced masonry bldg to comprise 45 residen'l units above off street enclosed parking.Details
renovation of existing 5 story on reinforced masonry bldg to comprise 45 residen'l units above off street enclosed parking. | $7,000,000 |