62 permits since 2000 (architect on 57 permits, authorized agent-others on 5 permits, designer on 1 permit, engineer on 1 permit): 43 completed, 1 in progress, 9 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 16, 2024 | Completed final sign-off Mar 2025 | 2701 21st St | Lsr Maintenance Llc | rev 201702280348- was approved with 2 garage door. this revision is to have a single garage door instead of 2 doors facing front of street.Details
rev 201702280348- was approved with 2 garage door. this revision is to have a single garage door instead of 2 doors facing front of street. | $1,000 |
| Sep 10, 2024 | Completed final sign-off Feb 2026 | 670 Noe St | Be Home Remodeling Inc | demo the (e) front stair and construction of (n) one. the front planter also changes to include a walkway.Details
demo the (e) front stair and construction of (n) one. the front planter also changes to include a walkway. | $40,000 |
| Aug 21, 2024 | Completed final sign-off Mar 2025 | 2362 Bay St | move washer/dryer into a dedicated closet off the hallway. all work is interior workDetails
move washer/dryer into a dedicated closet off the hallway. all work is interior work | $5,000 | |
| Jun 20, 2024 | Completed final sign-off Jan 2026 | 2446 46th Av | O'neill & Neville Construction Inc | 2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permitDetails
2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permit | $300,000 |
| Mar 15, 2024 | In progress issued Apr 2024 | 1089 Valencia St | Lombardi Property Development | tile the exterior surfaces of the window bulkheads; repair the surface of the exterior entry landing; update door hardware; remove existing storefront signDetails
tile the exterior surfaces of the window bulkheads; repair the surface of the exterior entry landing; update door hardware; remove existing storefront sign | $5,000 |
| Sep 6, 2023 | Completed final sign-off Nov 2024 | 41 Alvarado St | response to nov #202306442: structural repairs to rear stair, installation of handrails at this stairway. response to nov #202306658: repair dryrot damage to rear stair. response to nov #202305627: installation of water heater, confirm stair geometry was legal work less than 50% of (e) stair fabric.Details
response to nov #202306442: structural repairs to rear stair, installation of handrails at this stairway. response to nov #202306658: repair dryrot damage to rear stair. response to nov #202305627: installation of water heater, confirm stair geometry was legal work less than 50% of (e) stair fabric. | $5,000 | |
| Oct 18, 2022 | Completed final sign-off May 2023 | 1446 10th Av | Mizen Construction Inc | convert 376sf of garage space to living space connected to 1446 10th ave with new internal stair, new bathroom in space, and 2 windows replace. remodel existing kitchen and bathroom in 1446.Details
convert 376sf of garage space to living space connected to 1446 10th ave with new internal stair, new bathroom in space, and 2 windows replace. remodel existing kitchen and bathroom in 1446. | $300,000 |
| Aug 17, 2022 | Completed final sign-off May 2024 | 2267 15th St | Miles Mustari Dba Anchorhead Constructio | the project will consist of the construction a two level deck serving the second and third floors. there is no plumbing or electrical work for the project.Details
the project will consist of the construction a two level deck serving the second and third floors. there is no plumbing or electrical work for the project. | $50,000 |
| May 25, 2022 | Completed final sign-off Mar 2024 | 487 Noe St | legalization of work done on the facade without permit approval.application is in response to planning review of condo conversion #2021-004052cnd.unpermitted work had been done to buildings facade.building was remodeled under permit #2013-0726-2847Details
legalization of work done on the facade without permit approval.application is in response to planning review of condo conversion #2021-004052cnd.unpermitted work had been done to buildings facade.building was remodeled under permit #2013-0726-2847 | $25,000 | |
| Feb 8, 2022 | Completed final sign-off Nov 2022 | 570 Eureka St | C N F Construction & Water Proofing Co | one story 100 sq ft garden structure in rear yard. not for habitable use.Details
one story 100 sq ft garden structure in rear yard. not for habitable use. | $20,000 |
| Feb 12, 2021 | Completed final sign-off May 2022 | 218 Cortland Av | kitchen remodel. replace cabinets & countertops. new electrical including light outlets & switches, widen opening onto dining room. structural work in garage.Details
kitchen remodel. replace cabinets & countertops. new electrical including light outlets & switches, widen opening onto dining room. structural work in garage. | $50,000 | |
| Jan 29, 2021 | Completed final sign-off Sep 2021 | 2423 Broadway | O'neill & Neville Construction Inc | remodel 2 (e) bathrooms. (n) plumbing fixtures, (n) skylight, (n) lighting & electrical. remodel office, rec room & bedroom. new cabinets, electrical. raising ceiling in rec room. (n) heating system & water heater. (n) skylight in rec room.Details
remodel 2 (e) bathrooms. (n) plumbing fixtures, (n) skylight, (n) lighting & electrical. remodel office, rec room & bedroom. new cabinets, electrical. raising ceiling in rec room. (n) heating system & water heater. (n) skylight in rec room. | $150,000 |
| Jan 28, 2020 | Completed final sign-off Apr 2020 | 35 Fulton St | Baywolf Construction | repair broken glass in windows & window frames, new bathroom faucets, grab bars, shower head & controls, new door level lock set @ bath door & front door, replace 3 electric heaters with new electric heatersDetails
repair broken glass in windows & window frames, new bathroom faucets, grab bars, shower head & controls, new door level lock set @ bath door & front door, replace 3 electric heaters with new electric heaters | $19,134 |
| Jun 13, 2019 | Never finaled issued Jul 2019, no final | 566 Chestnut St | front bldg: new overhang with brackets & moldings n/a maherDetails
front bldg: new overhang with brackets & moldings n/a maher | $5,000 | |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 80 Cerritos Av | Baywolf Construction | changing (e) bathtub into a shower. new grab barDetails
changing (e) bathtub into a shower. new grab bar | $8,000 |
| Jul 10, 2017 | Completed final sign-off Mar 2018 | 570 Eureka St | C N F Construction & Water Proofing Co | adding a bathroom to the 2/f. a dormer will be built to accomodate the headroom. skylights, electrical outlets & lights will be added ot the 2 bedrooms on the 2/f.Details
adding a bathroom to the 2/f. a dormer will be built to accomodate the headroom. skylights, electrical outlets & lights will be added ot the 2 bedrooms on the 2/f. | $40,000 |
| Feb 28, 2017 | Never finaled issued Apr 2018, no final | 2701 21st St | add 1 parking space to (e)2-car garage by making garage wider & taller. a parking machine for 2 spaces will replace one of the 2 surface spaces. the garage will be upgraded to 1-hour construction a single door changed to double door.Details
add 1 parking space to (e)2-car garage by making garage wider & taller. a parking machine for 2 spaces will replace one of the 2 surface spaces. the garage will be upgraded to 1-hour construction a single door changed to double door. | $15,000 | |
| Sep 4, 2015 | Never finaled issued Sep 2015, no final | 1055 Dolores St | remove (e) front yard & front stair steel guardrail & stair handrails & replace w/new guardrails & handrails. remove (e) stairs & landing and replace w/new stair & landscaping to ground flr unit.Details
remove (e) front yard & front stair steel guardrail & stair handrails & replace w/new guardrails & handrails. remove (e) stairs & landing and replace w/new stair & landscaping to ground flr unit. | $10,000 | |
| Feb 13, 2015 | Expired or cancelled cancelled Jul 2025 | 2774 Bryant St | the (e) 6 units to be remodeled. the (e) bldg will be lifted & a new garage, trash room & lobby will be built at the ground level. a new elevator and central staircase will be installed. new & replacment windos. new hvac & water heater. replace back stair. fill in (e) central lightwell.Details
the (e) 6 units to be remodeled. the (e) bldg will be lifted & a new garage, trash room & lobby will be built at the ground level. a new elevator and central staircase will be installed. new & replacment windos. new hvac & water heater. replace back stair. fill in (e) central lightwell. | $500,000 | |
| Mar 6, 2014 | Completed final sign-off Dec 2014 | 4132 03rd St | Mutual Seiko Construction | revision to pa 200707055953. change construction type from type va over type 1a to type va. enclose 2nd floor lobby. extend roof over 4th floor front decks. revise window specs. correct drafting errors.Details
revision to pa 200707055953. change construction type from type va over type 1a to type va. enclose 2nd floor lobby. extend roof over 4th floor front decks. revise window specs. correct drafting errors. | |
| Dec 26, 2013 | Never finaled issued Jun 2015, no final | 401 Duboce Av | Owr Mechanical Dba Monarch Mechanical | new mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n).Details
new mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n). | $124,000 |
| Nov 8, 2013 | Completed final sign-off Jul 2014 | 572 Moultrie St | Abacus Group Builders Inc | revision to pa# 2013-0320-2577-deck to become larger in east/west direction. stair to extend west by owe tread. 1 new post at front stairDetails
revision to pa# 2013-0320-2577-deck to become larger in east/west direction. stair to extend west by owe tread. 1 new post at front stair | $500 |
| Sep 9, 2013 | Completed final sign-off Nov 2015 | 1050 South Van Ness Av | Swinerton Builders | adding occupancy for residential shelter on the first and second floor per plan. also 1)upgrade electrical, 2) fix guardrails,& handrails. 3) remodel 2 bathrooms and add one unisex bathroom. 4)new ventilation system. 5)new water heater. 6)new furnace, 7)new signage.Details
adding occupancy for residential shelter on the first and second floor per plan. also 1)upgrade electrical, 2) fix guardrails,& handrails. 3) remodel 2 bathrooms and add one unisex bathroom. 4)new ventilation system. 5)new water heater. 6)new furnace, 7)new signage. | $478,000 |
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 572 Moultrie St | Abacus Group Builders Inc | 1)demolish the 32 sq ft floor area to the north of the kitchen, 2) replace the back deck and stair with a new stair and slightly larger deck. 3)remove the siding and stucco stone from and restore stucco finish. rebuild front stair and landing in wood. 4)replace windows and add skylights.Details
1)demolish the 32 sq ft floor area to the north of the kitchen, 2) replace the back deck and stair with a new stair and slightly larger deck. 3)remove the siding and stucco stone from and restore stucco finish. rebuild front stair and landing in wood. 4)replace windows and add skylights. | $50,000 |
| Apr 3, 2012 | Completed final sign-off Aug 2012 | 195 Randall St | Mascheroni Construction | remodel the south wall o the kitchen by replacing e door and wondow with a double door with transom. eplace existing waterproofing of existing deck with new sloped subfloor and waterproofing. provide wood pallets for walking surface. replace e wd stair with metal spiral stair.Details
remodel the south wall o the kitchen by replacing e door and wondow with a double door with transom. eplace existing waterproofing of existing deck with new sloped subfloor and waterproofing. provide wood pallets for walking surface. replace e wd stair with metal spiral stair. | $25,000 |
| Apr 3, 2012 | Completed final sign-off Aug 2012 | 348 Arlington St | J Reilly Construction | restore historic trim to the front facade. stucco will be removed. windows and front doors will be replacedDetails
restore historic trim to the front facade. stucco will be removed. windows and front doors will be replaced | $40,000 |
| Feb 21, 2012 | Completed final sign-off Feb 2013 | 1508 Diamond St | Century Design & Construction | project is to raise the roof 1'-1" (@ centerline) @ the front part of the house over the kitchen, dining rm & living rm. the ceiling will also be raised, a (n) skylight installed & (n) slightly larger windows installed @ the front.Details
project is to raise the roof 1'-1" (@ centerline) @ the front part of the house over the kitchen, dining rm & living rm. the ceiling will also be raised, a (n) skylight installed & (n) slightly larger windows installed @ the front. | $20,000 |
| Feb 21, 2012 | Completed final sign-off May 2012 | 1111 Dolores St | Eastwood Development Incorporated | the project is a revision to 201012247385 s1. the studio oat ground floor will be converted to 1 bedroom unit by moving the kitchen to the living room/bedroomDetails
the project is a revision to 201012247385 s1. the studio oat ground floor will be converted to 1 bedroom unit by moving the kitchen to the living room/bedroom | $5,000 |
| Nov 30, 2011 | Expired or cancelled withdrawn Jul 2014 | 1050 South Van Ness Av | Swinerton Builders | remodel 2 (e) 2nd floor bathrooms to repair them & to bring up to code including ada. the bathrooms will be used in conjunction with a homeless shelter on the same floor. 75% of the construction cost of the work is to establish ada complainceDetails
remodel 2 (e) 2nd floor bathrooms to repair them & to bring up to code including ada. the bathrooms will be used in conjunction with a homeless shelter on the same floor. 75% of the construction cost of the work is to establish ada complaince | $111,100 |
| Oct 31, 2011 | Completed final sign-off Aug 2012 | 348 Arlington St | J Reilly Construction | rebuild the deteriorated front wood stairs & new lighting. the dimension do not change.Details
rebuild the deteriorated front wood stairs & new lighting. the dimension do not change. | $10,000 |
| Sep 29, 2011 | Completed final sign-off Jul 2012 | 84 Sotelo Av | F J S Construction | remodel kitchen including elect & plumbing, remove 3 existing windows & replace with 6 new windows.Details
remodel kitchen including elect & plumbing, remove 3 existing windows & replace with 6 new windows. | $15,000 |
| Aug 22, 2011 | Never finaled issued Apr 2012, no final | 84 Sotelo Av | F J S Construction | a new 93 sq. ft. addition to rear of house @ the ground floor between the (e) deck & the (e) bay window above. a kitchen remodel with new windows on the west wall. replace windows in kind in the front rooms on both floors.Details
a new 93 sq. ft. addition to rear of house @ the ground floor between the (e) deck & the (e) bay window above. a kitchen remodel with new windows on the west wall. replace windows in kind in the front rooms on both floors. | $100,000 |
| Dec 24, 2010 | Completed final sign-off May 2012 | 1111 Dolores St | remodel the facade with new windows & finishes & to remodel the kitchen & baths & raise the ceiling in the living /dining , kitchen area of the upper unit.Details
remodel the facade with new windows & finishes & to remodel the kitchen & baths & raise the ceiling in the living /dining , kitchen area of the upper unit. | $150,000 | |
| Dec 9, 2010 | Expired or cancelled cancelled Mar 2020 | 2102 Castro St | the property is to add a veritical & horizontal addition to the rear of the house.Details
the property is to add a veritical & horizontal addition to the rear of the house. | $200,000 | |
| Aug 9, 2010 | Completed final sign-off Aug 2010 | 342 Jersey St | Mascheroni Construction | revision to 201002166563. delete 2 new windows from storage utility roomDetails
revision to 201002166563. delete 2 new windows from storage utility room | |
| Jul 27, 2010 | Completed final sign-off Jan 2011 | 93 Buena Vista Tr | F J S Construction | replacement of 8 windows in the second floor. replacemnt in-kind at the facade and replacement of vinyl windows with wood windows at the backDetails
replacement of 8 windows in the second floor. replacemnt in-kind at the facade and replacement of vinyl windows with wood windows at the back | $8,000 |
| Apr 28, 2010 | Completed final sign-off Oct 2012 | 309 Jersey St | add 2nd living level over the 1st 53 ft. of the house. aldo one story addition to the kitchen, filling in the east light well on the lowest living level ( 1st floor).Details
add 2nd living level over the 1st 53 ft. of the house. aldo one story addition to the kitchen, filling in the east light well on the lowest living level ( 1st floor). | $250,000 | |
| Mar 19, 2010 | Completed final sign-off Jun 2010 | 80 Ora Wy | Community Reconstruction Solutions | install (3) new roof level windows (hopper) on north west living room. no bedroom windows.Details
install (3) new roof level windows (hopper) on north west living room. no bedroom windows. | $3,650 |
| Mar 18, 2010 | Completed final sign-off May 2010 | 4376 21st St | F J S Construction | the project is to replace several (e) front facade windows & the front door. replace the non-orgimal 2nd. flr. projecting bay window w/2-double hung windows. replace the 1st. flr. bay window (oh) w/ marvin clad casement windows. replace the non-original fron dr. w/a marvin clad french dr.Details
the project is to replace several (e) front facade windows & the front door. replace the non-orgimal 2nd. flr. projecting bay window w/2-double hung windows. replace the 1st. flr. bay window (oh) w/ marvin clad casement windows. replace the non-original fron dr. w/a marvin clad french dr. | $10,000 |
| Jun 16, 2009 | Expired or cancelled cancelled Jul 2016 | 60 Fountain St | new house @ location of existing house, house is 2001 sq ft. at rear, no work to front unit, rebuildside stair to street.Details
new house @ location of existing house, house is 2001 sq ft. at rear, no work to front unit, rebuildside stair to street. | $500,000 | |
| Jun 16, 2009 | Completed final sign-off Aug 2009 | 2245 Filbert St | renew pa# 2003/05/28/5693 to obtain final inspection. all work has been completed.Details
renew pa# 2003/05/28/5693 to obtain final inspection. all work has been completed. | ||
| May 5, 2009 | Never finaled issued Jun 2013, no final | 1627 Anza St | demolition of existing stair and deck at back. demo walls around sw indentaton at back. demo interior and exterior finishes and windows at back. new 207 sf 2 story addition at back to make bedroom larger and add interior stair to lower level. remodel 444 sf of lower level to become family rm w/bath/Details
demolition of existing stair and deck at back. demo walls around sw indentaton at back. demo interior and exterior finishes and windows at back. new 207 sf 2 story addition at back to make bedroom larger and add interior stair to lower level. remodel 444 sf of lower level to become family rm w/bath/ | $80,000 | |
| Nov 4, 2008 | Completed final sign-off Jun 2009 | 69 Mirabel Av | Baywolf Construction Inc | revision to pa# 2005-0623-5921-s1/r1-include new kitchen cabinets, electrical outlets and switches to go with them. gas outlets will also be moved or installed with new lights installed. (n) short wall @ pantry.Details
revision to pa# 2005-0623-5921-s1/r1-include new kitchen cabinets, electrical outlets and switches to go with them. gas outlets will also be moved or installed with new lights installed. (n) short wall @ pantry. | $5,000 |
| Sep 22, 2008 | Completed final sign-off Sep 2009 | 76 Hernandez Av | Mascheroni Construction | remove & replace (e) decking & roofing at rear. remove & replace (e) deck guardrail. repair damaged soffit @ bay @ east side. repair damage under first flr windows. waterproof existing deck & adjacent stuccoDetails
remove & replace (e) decking & roofing at rear. remove & replace (e) deck guardrail. repair damaged soffit @ bay @ east side. repair damage under first flr windows. waterproof existing deck & adjacent stucco | $80,000 |
| Jul 22, 2008 | Completed final sign-off Nov 2013 | 623 Duncan St | Sage Building Company | revision to pa #200509092498, change to exterior finishes-shingles changed to cedar siding @ top two floors, siding changed to cement plaster @ lowest residential floor.Details
revision to pa #200509092498, change to exterior finishes-shingles changed to cedar siding @ top two floors, siding changed to cement plaster @ lowest residential floor. | |
| May 9, 2008 | Completed final sign-off Jun 2009 | 69 Mirabel Av | Baywolf Construction Inc | renew appl#200706295559, 200709273898, 200609152495, 200506235921 to complete work.Details
renew appl#200706295559, 200709273898, 200609152495, 200506235921 to complete work. | $25,001 |
| Apr 1, 2008 | Completed final sign-off Jun 2009 | 643 Hampshire St | interior remodel, new kitchen and bath on 2nd floor, new bath on 3rd floor and fill in skylight, retrofit and repair floor of lower unit, remove chimney, fill in window at ground floor garage (backyard). plumbing/electrical on separate permit.Details
interior remodel, new kitchen and bath on 2nd floor, new bath on 3rd floor and fill in skylight, retrofit and repair floor of lower unit, remove chimney, fill in window at ground floor garage (backyard). plumbing/electrical on separate permit. | $80,000 | |
| Dec 24, 2007 | Expired or cancelled cancelled Jun 2009 | 69 Mirabel Av | Baywolf Construction Inc | revision to pa# 2005/06/23/5921. rebuild wooden walkway and stair to the west side of bldg.Details
revision to pa# 2005/06/23/5921. rebuild wooden walkway and stair to the west side of bldg. | $6,000 |
| Dec 21, 2007 | Completed final sign-off Jun 2009 | 69 Mirabel Av | Baywolf Construction Inc | revision to pa# 2005/06/23/5921. replace slashes in 6 ex. windows with the same opening. 5 of the windows are in front of bldg.Details
revision to pa# 2005/06/23/5921. replace slashes in 6 ex. windows with the same opening. 5 of the windows are in front of bldg. | $2,000 |
| Sep 27, 2007 | Expired or cancelled expired Apr 2009 | 69 Mirabel Av | renew permit pa#200609152495. new front stair for completion of work & final inspection.Details
renew permit pa#200609152495. new front stair for completion of work & final inspection. | $8,000 | |
| Jul 23, 2007 | Expired or cancelled cancelled Nov 2009 | 841 Jamestown Av | 13-D Fire Systems | install n.f.p.a. 13 sprinkler system in condos & parking garage with stand pipes.Details
install n.f.p.a. 13 sprinkler system in condos & parking garage with stand pipes. | $75,000 |
| Jul 20, 2007 | Never finaled issued Nov 2007, no final | 855 Jamestown Av | 13-D Fire Systems | bldg #11 - install nfpa 13 sprinkler system with standpipes in condos and parking garage (bldg 11).Details
bldg #11 - install nfpa 13 sprinkler system with standpipes in condos and parking garage (bldg 11). | $75,000 |
| Jul 5, 2007 | Completed final sign-off Dec 2014 | 4132 03rd St | Mutual Seiko Construction | erect a new 4-story, 7 units residential & commercial building.Details
erect a new 4-story, 7 units residential & commercial building. | $2,000,000 |
| Jun 29, 2007 | Expired or cancelled expired Apr 2009 | 69 Mirabel Av | renew pa#200506235921.Details
renew pa#200506235921. | $5,100 | |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 861 Jamestown Av | Thompson Pacific Corp | building 5- revision to appl#9924081s (under construction) change of wall assemblies.Details
building 5- revision to appl#9924081s (under construction) change of wall assemblies. | |
| Jan 3, 2007 | Completed final sign-off Apr 2007 | 713 Noe St | Baywolf Construction Inc | bathroom remodel new fixtures at finishes. no new floor area or moved wallsDetails
bathroom remodel new fixtures at finishes. no new floor area or moved walls | $30,000 |
| Nov 29, 2006 | Completed final sign-off Oct 2008 | 330 Duncan St | Benjamin Shaw | horizontal addition - 1 story addition in rear yard with deck above addition.Details
horizontal addition - 1 story addition in rear yard with deck above addition. | $200,000 |
| Sep 9, 2005 | Completed final sign-off Nov 2008 | 625 Duncan St | Sage Building Company | horizontal addition - addition to (e) house. remodel (e) house. adding 1 unit to (e) house. rebuilding garage.Details
horizontal addition - addition to (e) house. remodel (e) house. adding 1 unit to (e) house. rebuilding garage. | $400,000 |
| May 10, 2002 | Completed final sign-off Nov 2007 | 1335 Fulton St | erect a new 3 stories 6 unit residential bldg with commercial spaceDetails
erect a new 3 stories 6 unit residential bldg with commercial space | $787,000 | |
| May 10, 2002 | Completed final sign-off Oct 2007 | 1335 Fulton St | demolish a one story comm'l office bldng.Details
demolish a one story comm'l office bldng. | ||
| Aug 16, 2001 | Expired or cancelled expired Dec 2001 | 2423 Broadway | rev. to appl#200007145150 fireplace front & mantleDetails
rev. to appl#200007145150 fireplace front & mantle | ||
| Apr 26, 2000 | Completed final sign-off Oct 2010 | 2423 Broadway | Barcewski Inc Dba Sunshine Construction, Plath & Company Inc | new two car garage in front yard w/terrace above. rebuild front staircase.Details