Alan Ohashi
- Listed as
- architect, authorized agent-others
- Firm
- Ohashi Design Studio
- Based in
- Emeryville
- On San Francisco permits
- Feb 2002 to Nov 2018
10 permits since 2000 (architect on 9 permits, authorized agent-others on 1 permit): 4 completed, 1 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 9, 2018 | Expired or cancelled cancelled Jan 2026 | 240 Edgewood Av | Eastwood Development Incorporated | raising roof by 5 1/2". rev to pa#201710161323Details
raising roof by 5 1/2". rev to pa#201710161323 | $25,000 |
| Nov 10, 2016 | Expired or cancelled cancelled Aug 2022 | 132 Corbett Av | Jim Crone Construction | erect 3 story single family dwelling no basement.Details
erect 3 story single family dwelling no basement. | $600,000 |
| Jul 28, 2016 | Expired or cancelled cancelled Nov 2023 | 233 Greenwich St | M F Construction | reconfigure entry stairwqay. new deck @ top floor unit #3. replace existing windows. new compliant fire exit staircase. code compliant railing and decking @ rear balconies.Details
reconfigure entry stairwqay. new deck @ top floor unit #3. replace existing windows. new compliant fire exit staircase. code compliant railing and decking @ rear balconies. | $60,000 |
| Feb 18, 2016 | Expired or cancelled cancelled Jan 2026 | 501 Noe St | unit 1: partial basement and 1st fl remodel within a 3 story residential building. replacement of exterior windows and doors within lower unit and private backyard patio remodel. basement level includes family rm, full bath, 1st fl: 2 bedrooms, study, 2 full, 1 half bath, kitchen remodel, roof deckDetails
unit 1: partial basement and 1st fl remodel within a 3 story residential building. replacement of exterior windows and doors within lower unit and private backyard patio remodel. basement level includes family rm, full bath, 1st fl: 2 bedrooms, study, 2 full, 1 half bath, kitchen remodel, roof deck | $400,000 | |
| Oct 16, 2015 | Completed final sign-off Mar 2017 | 48 Fountain St | Conscious Construction | remodel of (e) kitchen, dining, powder rm, master bedrm, bathrm including electrical/plumbing, structural addition of 1 bathrm and rear extension of 6'4"Details
remodel of (e) kitchen, dining, powder rm, master bedrm, bathrm including electrical/plumbing, structural addition of 1 bathrm and rear extension of 6'4" | $100,000 |
| Dec 11, 2014 | Completed final sign-off Jun 2018 | 1537 06th Av | Artisan Builders Corp | rear yard addition to lower level & mid level, and interior remodel to the bottom 2 floors with minimal work to top floor. new rear stair to rear yard. lower floor to become 2 bedrooms and 1 bedroom. middle floor to reconfigure 2 bedrooms, 2 bath & laundry.Details
rear yard addition to lower level & mid level, and interior remodel to the bottom 2 floors with minimal work to top floor. new rear stair to rear yard. lower floor to become 2 bedrooms and 1 bedroom. middle floor to reconfigure 2 bedrooms, 2 bath & laundry. | $375,000 |
| Aug 29, 2013 | Never finaled issued Sep 2013, no final | 568 Sanchez St | Live Oak Building & Design Inc | front building unit #568 sanchez street- (n) entry door, interior stairs & guardrail, (n) gas fireplace, (n) light fixtures, (n) cabinetry, (n) sliding doors @ rear, (n) entry to laundryDetails
front building unit #568 sanchez street- (n) entry door, interior stairs & guardrail, (n) gas fireplace, (n) light fixtures, (n) cabinetry, (n) sliding doors @ rear, (n) entry to laundry | $110,000 |
| Dec 23, 2010 | Expired or cancelled expired Nov 2012 | 455 27th St | Doran Construction & Design | 3rd floor closet horizontal addition. remove 2nd stair between 2nd floor & roof deck. convert exterior stairwell to closet.Details
3rd floor closet horizontal addition. remove 2nd stair between 2nd floor & roof deck. convert exterior stairwell to closet. | $80,000 |
| Jan 16, 2009 | Completed final sign-off Jun 2011 | 347 Liberty St | Van Der Sterre Construction | the project is remodeling a 3 story, 2 unit residience built over a garage. we are applying for a site permit to re-design the 4th story bedroom roof to provide more interior headroom. to add new dormers for a new elevator penthouse. to add a new dormer for new laundry area.Details
the project is remodeling a 3 story, 2 unit residience built over a garage. we are applying for a site permit to re-design the 4th story bedroom roof to provide more interior headroom. to add new dormers for a new elevator penthouse. to add a new dormer for new laundry area. | $50,000 |
| Feb 15, 2002 | Completed final sign-off Apr 2002 | 49 Geary St | new partitions, lighting, floors, space has no heating or cooling, no hvac under this permitDetails
new partitions, lighting, floors, space has no heating or cooling, no hvac under this permit | $8,000 |