Adrian Al-Adeeb
- Listed as
- architect, engineer
- Firm
- Ama Engineering
- Based in
- Walnut Creek
- On San Francisco permits
- Oct 2004 to May 2017
11 permits since 2000 (engineer on 8 permits, architect on 3 permits): 4 completed, 1 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2017 | Expired or cancelled withdrawn Apr 2019 | 860 Divisadero St | residential only. soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4.Details
residential only. soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. | $118,000 | |
| Sep 15, 2016 | Expired or cancelled withdrawn Aug 2017 | 3407 24th St | soft story retrofit per sfbc chapter 34b engineering criteria is per 2012 ibec appendix a-4.Details
soft story retrofit per sfbc chapter 34b engineering criteria is per 2012 ibec appendix a-4. | $60,000 | |
| Aug 31, 2016 | Completed final sign-off May 2019 | 3317 Mission St | E.J. Builders | soft story retrofit for tier ii structure per 2016 cebc appendix a4 as amended by ab107, design base shear for 100% cbc at target story.Details
soft story retrofit for tier ii structure per 2016 cebc appendix a4 as amended by ab107, design base shear for 100% cbc at target story. | $100,000 |
| Nov 2, 2015 | Expired or cancelled withdrawn Apr 2019 | 860 Divisadero St | commerical only. seismic strenghting/soft story. per 2012 iebc appendix a-4. n/a for maher ordinance no.155-13.Details
commerical only. seismic strenghting/soft story. per 2012 iebc appendix a-4. n/a for maher ordinance no.155-13. | $50,000 | |
| May 28, 2015 | Completed final sign-off Dec 2017 | 1141 Dolores St | remodeling of (e) exterior deck + stair & addition of 10 sqft to (e) sub floor. n/a for maher ordinance.Details
remodeling of (e) exterior deck + stair & addition of 10 sqft to (e) sub floor. n/a for maher ordinance. | $50,000 | |
| Feb 24, 2014 | Completed final sign-off Feb 2015 | 1808 Fulton St | P & L Construction Co | foundation & stucco work.Details
foundation & stucco work. | $85,000 |
| Jun 2, 2006 | Expired or cancelled expired Jul 2009 | 3407 24th St | installation steel posts and new concrete footing w/ ada bathroom upgrade.Details
installation steel posts and new concrete footing w/ ada bathroom upgrade. | $25,000 | |
| Mar 21, 2006 | Expired or cancelled expired Feb 2011 | 1987 14th Av | Group Construction | solid fuel burning stove (fireplace) epa certified, ul1482 brand:rais,model: bora a pellet-fueled wood heater.Details
solid fuel burning stove (fireplace) epa certified, ul1482 brand:rais,model: bora a pellet-fueled wood heater. | $4,838 |
| Jul 1, 2005 | Never finaled issued Jul 2005, no final | 1343 Oak St | G B & E Construction Inc. | new foundation & support for building. excavate to extend (e) garage for storage space. w/(e) bldgDetails
new foundation & support for building. excavate to extend (e) garage for storage space. w/(e) bldg | $20,000 |
| Dec 8, 2004 | Expired or cancelled cancelled Mar 2009 | 855 Battery St | Mcclier Corporation | erect a steel platfform framing on the roof to support new tv satellite dishesDetails
erect a steel platfform framing on the roof to support new tv satellite dishes | $50,000 |
| Oct 18, 2004 | Completed final sign-off Sep 2005 | 58 Collingwood St | B C Construction | minor room reconfiguration.no change in bldg. structure,size/shape.3/f-retain (e)bedroom reduce sizeDetails
minor room reconfiguration.no change in bldg. structure,size/shape.3/f-retain (e)bedroom reduce size |