Adam A
- License
- S7366
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S7366 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Aug 2025 to Aug 2025
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- High Band Construction Inc, Nrci Telecom, Tristrux Llc Dba Tristrux Construction
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2025 | In progress issued Oct 2025 | 1155 Bryant St | Tristrux Llc Dba Tristrux Construction | att modification of (e) faciilty . remove and replace (6) antenna, install (3) dc 9 raycaps, (3) 24 pair fiber trunks, (6) 6 awg dc power trunks, remove (1) power plant and (6) rectifiers; install (1) net sure conversion kit power plant. (1) 58v buss bar panel, (12) 18v rectifiers, (11) 58vDetails
att modification of (e) faciilty . remove and replace (6) antenna, install (3) dc 9 raycaps, (3) 24 pair fiber trunks, (6) 6 awg dc power trunks, remove (1) power plant and (6) rectifiers; install (1) net sure conversion kit power plant. (1) 58v buss bar panel, (12) 18v rectifiers, (11) 58v | $45,000 |
| Aug 21, 2025 | Completed final sign-off Jun 2026 | 1625 Post St | Nrci Telecom | at&t modification of e) wireless facility:r/r 3 antennas, install 3 rru's, 1 dc trunk, 1 dc-9, rf stripping, barricade & signage, remove 32 batteries, install 20 new 210aa, r/r 12 rectifiers, remove 2 power plants, install 1 netsure conversion power plant, install 12 58v converters, 1) 15 amp & 6 dcDetails
at&t modification of e) wireless facility:r/r 3 antennas, install 3 rru's, 1 dc trunk, 1 dc-9, rf stripping, barricade & signage, remove 32 batteries, install 20 new 210aa, r/r 12 rectifiers, remove 2 power plants, install 1 netsure conversion power plant, install 12 58v converters, 1) 15 amp & 6 dc | $55,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 2242 Polk St | High Band Construction Inc | modification of (e) att wireless facility to consisting of relocate (3) antennas & add (3)withing (e) frp radome; r/r(3)rru's. remove(1) infinety power plant;install(1)netsure conversion power plant;(13)rectifies;(12)58v converters;(1)expansion shelf;(1)15amp+(6)50amp dc breakers.(1)g4 bbu;(1)dc12Details
modification of (e) att wireless facility to consisting of relocate (3) antennas & add (3)withing (e) frp radome; r/r(3)rru's. remove(1) infinety power plant;install(1)netsure conversion power plant;(13)rectifies;(12)58v converters;(1)expansion shelf;(1)15amp+(6)50amp dc breakers.(1)g4 bbu;(1)dc12 | $35,000 |