- May 2024 to Aug 2026
4 permits since 2000 (contractor on 3 permits, authorized agent-others on 1 permit, designer on 1 permit): 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cmd Electric Inc
- Engineers
- Babak Hashemi (2), Stephen Shaffer, Thomas S. Yatos, Troy Turley
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 655 Beach St | Cmd Electric Inc | electrical permit add to permit ew202604274538 to add a 100amp load centerDetails
electrical permit add to permit ew202604274538 to add a 100amp load center | $2,500 |
| May 21, 2026 | In progress issued May 2026 | 1355 Market St | Prime Electric | 3rd floor - replacing existing 40kw ups(uninteruptible power supply) with new 20kwDetails
3rd floor - replacing existing 40kw ups(uninteruptible power supply) with new 20kw | $195,000 |
| Nov 20, 2024 | Expired or cancelled withdrawn Apr 2025 | 1450 Owens St | Prime Electric | the 40.2 kw system will be comprised of (67) 600w hanwha q.cell modules, (67) solaredge optimizers (1) 30 kw solaredge inverter. revision to pa# 202407166568, design change narrative attached. additional $2000 construction valuation for change, moved location of (6) solar modules.Details
the 40.2 kw system will be comprised of (67) 600w hanwha q.cell modules, (67) solaredge optimizers (1) 30 kw solaredge inverter. revision to pa# 202407166568, design change narrative attached. additional $2000 construction valuation for change, moved location of (6) solar modules. | $2,000 |
| May 15, 2024 | In progress issued Aug 2026 | 750 Florida St | Prime Electric | prop h- installation of photoviltaic(pv) system & the battery energy storage(bess). the 50 kw system will be comprised of (130) 595w q.cell modules, (2) sol-ark inverter, (4) 60kwh sol-ark battery batteryDetails
prop h- installation of photoviltaic(pv) system & the battery energy storage(bess). the 50 kw system will be comprised of (130) 595w q.cell modules, (2) sol-ark inverter, (4) 60kwh sol-ark battery battery | $587,304 |