Permit 202204192485
233 Presidio Av
bolt down the foundation plates every 3 ft with a all thread 5/8 galvanized rod, set with epoxy 7 in in the concrete and simpson strong tie 6" 1/4 in. 14 gauge galvanized steel foundation strap wood to conrete, approx 30 bolts and 30 straps.
- Outcome
- Completed (city status: complete, Apr 26, 2022)
- Filed
- Apr 19, 2022
- Permit issued
- Apr 19, 2022
- Final sign-off
- Apr 26, 2022
- Declared cost
- $12,000
- Building use
- 2 family dwelling
- Neighborhood
- Presidio Heights
- Contractor
- Merlyn Construction (license 1024274)
- Property
- All permits at this address (block 0997, lot 029)