Back to bathroom remodel contractors
Zone 4 Power Inc
- Based in
- South San Francisco
- On San Francisco permits
- Apr 2003 to Jun 2024
- Last 24 months
- 0 permits filed
20 permits since 2000: 18 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 456 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2021 | Completed final sign-off Jun 2022 | 265 Shotwell St | revision to pa 202010287606 issued on 6/30/21 to include the built-out of 2 gender neutral bathrooms and a trash closetDetails
revision to pa 202010287606 issued on 6/30/21 to include the built-out of 2 gender neutral bathrooms and a trash closet | $50,000 |
| Jun 14, 2010 | Completed final sign-off Sep 2011 | 50 Clayton St | replace kitchen cabinets for 2 units,replace tubs lavatories and water closets, electric as required(2 kitchens and 2 bathrooms). kitchen:replace cabinets and counter.bathrooms:replace plmg fixtures new lighting to comply.no wall relocation and no structural changes with cec 150 k.Details
replace kitchen cabinets for 2 units,replace tubs lavatories and water closets, electric as required(2 kitchens and 2 bathrooms). kitchen:replace cabinets and counter.bathrooms:replace plmg fixtures new lighting to comply.no wall relocation and no structural changes with cec 150 k. | $50,000 |
| Apr 28, 2003 | Completed final sign-off Oct 2004 | 2257 Filbert St | kitchen remodel, installation of beams, master bath remodel, new cornice at rear of house, new sidinDetails
kitchen remodel, installation of beams, master bath remodel, new cornice at rear of house, new sidin | $75,000 |