Zhong Art Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Mar 2026
- Last 24 months
- 3 permits filed
26 permits since 2000: 17 completed, 3 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 38 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2018 | Completed final sign-off Jan 2019 | 790 35th Av | revision to app#201711174307 to enlarge the storage and remove a closet on 1st floor per plan. extend the closet on 3rd floor. reduce the exterior decking on the 1st floor per plan.Details
revision to app#201711174307 to enlarge the storage and remove a closet on 1st floor per plan. extend the closet on 3rd floor. reduce the exterior decking on the 1st floor per plan. | |
| Sep 6, 2018 | Completed final sign-off Jul 2020 | 463 Madrid St | 1/f: add 1 bedrm, 1 playrm, 1 bath, laundry, & patio. 2/f: total remodel. add 1 bedrm & half bath. new stairs to connect all 3 floor. new deck @rear. attic: add 2 bedrms, loft, & 1 bath. 4 new dormers & roof deck @rear. new alumn-clad wood windows at front. infill under front stairs metal railings.Details
1/f: add 1 bedrm, 1 playrm, 1 bath, laundry, & patio. 2/f: total remodel. add 1 bedrm & half bath. new stairs to connect all 3 floor. new deck @rear. attic: add 2 bedrms, loft, & 1 bath. 4 new dormers & roof deck @rear. new alumn-clad wood windows at front. infill under front stairs metal railings. | $130,000 |
| Dec 5, 2017 | Completed final sign-off Aug 2018 | 2730 44th Av | infill 1 light well per plan at 2nd fl. 2nd fl. 2nd fl remodel kitchen and 1 bath, add 1 new bath, new deck at back. gr fl add 2 bedrm, 1 bath, 1/2 bath 1 media roomDetails
infill 1 light well per plan at 2nd fl. 2nd fl. 2nd fl remodel kitchen and 1 bath, add 1 new bath, new deck at back. gr fl add 2 bedrm, 1 bath, 1/2 bath 1 media room | $88,888 |
| Jun 30, 2017 | Completed final sign-off Sep 2017 | 39 Dalewood Wy | 2nd fl remodel, 1 e bath, remodel bedroom. gr fl: add 1.5 new bath, new office, sheetrock garage. exterior: replace rear windows and patio door in kind at rear. build new wood deck and replace patio dr to deck. replace 4 lr windows and 3 br windows with aluminum-clad wood in lr & bedroomDetails
2nd fl remodel, 1 e bath, remodel bedroom. gr fl: add 1.5 new bath, new office, sheetrock garage. exterior: replace rear windows and patio door in kind at rear. build new wood deck and replace patio dr to deck. replace 4 lr windows and 3 br windows with aluminum-clad wood in lr & bedroom | $50,000 |