Zetzflush Construction & Home Services
- Based in
- Novato
- On San Francisco permits
- Oct 2023 to Aug 2026
- Last 24 months
- 4 permits filed
6 permits since 2000: 2 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 140 Precita Av | new window at kitchen, 24x48. sliding door at breakfast nook. new window, 17x24 at bathroom. sliding door at breakfast nook. replace siding around window replacements.Details
new window at kitchen, 24x48. sliding door at breakfast nook. new window, 17x24 at bathroom. sliding door at breakfast nook. replace siding around window replacements. | $11,000 |
| Jul 24, 2026 | In progress issued Jul 2026 | 140 Precita Av | 5revision to 202604219769. new structural framing, new footing, epoxy anchors.Details
5revision to 202604219769. new structural framing, new footing, epoxy anchors. | $8,700 |
| Apr 21, 2026 | In progress issued Apr 2026 | 140 Precita Av | remove all interior drywall or old wet plaster system, replace with (n) drywall. remove (e) wiring & upgrade to (n) 200amp service. remove 7 replace all plumbing. remove (e) kitchen, install (n) kitchen, remove (e) bathroom, install (n) bathroom, remove fireplace, install (n) electric fireplace.Details
remove all interior drywall or old wet plaster system, replace with (n) drywall. remove (e) wiring & upgrade to (n) 200amp service. remove 7 replace all plumbing. remove (e) kitchen, install (n) kitchen, remove (e) bathroom, install (n) bathroom, remove fireplace, install (n) electric fireplace. | $80,000 |
| Oct 17, 2024 | Completed final sign-off Nov 2024 | 1321 Revere Av | remove (e) risers and treads on front stairs. replace rise and replace treads. all work in-kind. no structural.Details
remove (e) risers and treads on front stairs. replace rise and replace treads. all work in-kind. no structural. | $4,000 |
| May 8, 2024 | In progress issued May 2024 | 2170 26th Av | dry rot in front pony wall (11 x 8) 6 " thick dry rot in botom seal of front window (in living room floor) approx 12" wide interior flooring the exterior front is stucco repair to approx 42 sqft. repair at front no changes approx 42 sq. ft.Details
dry rot in front pony wall (11 x 8) 6 " thick dry rot in botom seal of front window (in living room floor) approx 12" wide interior flooring the exterior front is stucco repair to approx 42 sqft. repair at front no changes approx 42 sq. ft. | $10,000 |
| Oct 2, 2023 | Completed final sign-off Nov 2023 | 2634 Judah St | unit #1: to comply w/nov 202305814 replace floor covering; paint walls and ceiling; repair ceiling; provide single cylinder deadbolt locks with a min 1"throw for entry doors; provide primary locking devices at exterior doorsDetails
unit #1: to comply w/nov 202305814 replace floor covering; paint walls and ceiling; repair ceiling; provide single cylinder deadbolt locks with a min 1"throw for entry doors; provide primary locking devices at exterior doors | $21,000 |