Back to bathroom remodel contractors
Zak Tile & Stone
- Based in
- Martinez
- On San Francisco permits
- Aug 2024 to Aug 2024
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 1 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2024 | Expired or cancelled cancelled Feb 2025 | 25 Cameo Wy | remodel primary bathroom & tub including removal and replacement of 12o sq. ft. of floor tile, remove and replace tub, remove and replace 15 sq. ft. of wall tile at shower.Details
remodel primary bathroom & tub including removal and replacement of 12o sq. ft. of floor tile, remove and replace tub, remove and replace 15 sq. ft. of wall tile at shower. | $15,000 |