Z L Construction
- Based in
- San Leandro
- On San Francisco permits
- Apr 2021 to Jan 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 63 days from filing to permit and 436 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2021 | Completed final sign-off Sep 2022 | 1695 Funston Av | remodel 2nd fl kitchen area. add laundry room at 3rd fl. replace bathroom #1 bathrub to shower. replace bathroom #2 shower to tub. replace deck finish on top floor.Details
remodel 2nd fl kitchen area. add laundry room at 3rd fl. replace bathroom #1 bathrub to shower. replace bathroom #2 shower to tub. replace deck finish on top floor. | $30,000 |