Back to bathroom remodel contractors
Yushen Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2022 to Sep 2022
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 8 days from filing to permit and 1070 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2022 | Completed final sign-off Sep 2025 | 816 Paris St | add 2 bedroom, 1 full bathroom, a family room and 1 ktichenette at ground floor, approx 745 sqft . replace, 2 windows on the left side of building and 1 in the back or building, replace window with sliding door in the back of building.Details
add 2 bedroom, 1 full bathroom, a family room and 1 ktichenette at ground floor, approx 745 sqft . replace, 2 windows on the left side of building and 1 in the back or building, replace window with sliding door in the back of building. | $70,000 |