Back to bathroom remodel contractors
Yu's Family Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2024 to Aug 2025
- Last 24 months
- 4 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 in progress. Typically 23 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2025 | In progress issued Jan 2025 | 153 Guttenberg St | add a cook top (2 burners only, no oven)at wet bar area with exhaust fan. change shower & sink location of bathrm #1 existing bathroom (#2) sink and toilet change location. nw bathroom #3 toilet & shower switch location. new location for refridgerator & stove on 2nd floor. revise to pa202407267330.Details
add a cook top (2 burners only, no oven)at wet bar area with exhaust fan. change shower & sink location of bathrm #1 existing bathroom (#2) sink and toilet change location. nw bathroom #3 toilet & shower switch location. new location for refridgerator & stove on 2nd floor. revise to pa202407267330. | |
| Jul 26, 2024 | In progress issued Sep 2024 | 153 Guttenberg St | 1st fl - add 2 bedrooms, bathroom (shower), half bath and a wet bar; add 120 and 240 receptacles; (n)bathroom with standing shower at 2nd floor. remodel kitchen at 2nd flDetails
1st fl - add 2 bedrooms, bathroom (shower), half bath and a wet bar; add 120 and 240 receptacles; (n)bathroom with standing shower at 2nd floor. remodel kitchen at 2nd fl | $18,000 |