Back to bathroom remodel contractors
Yk Mason & Sons Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Jul 2026
- Last 24 months
- 8 permits filed
26 permits since 2000: 21 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 2 in progress. Typically 4 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 478 Joost Av | bathroom remodel, changing tub to shower pan, plumbing and electrical updates as needed.Details
bathroom remodel, changing tub to shower pan, plumbing and electrical updates as needed. | $20,000 |
| Mar 25, 2026 | In progress issued Mar 2026 | 128 Valmar Tr | add bathroom and storage room in first floor in sfd.Details
add bathroom and storage room in first floor in sfd. | $25,000 |
| Jun 30, 2025 | Completed final sign-off Oct 2025 | 1831 40th Av | bathroom remodel on 2nd floor. changing bath tub to shower. all plumbing and electrical to remain in same location.Details
bathroom remodel on 2nd floor. changing bath tub to shower. all plumbing and electrical to remain in same location. | $15,000 |
| Nov 17, 2023 | Completed final sign-off Jul 2024 | 880 Wisconsin St | 1st fl:convert e bathroom and storage into bedrm suite (390 sf). update e interior stairs rise and tread to comply w code, install solar tube from roof to 1st fl, remove diagonal bracing in garage.Details
1st fl:convert e bathroom and storage into bedrm suite (390 sf). update e interior stairs rise and tread to comply w code, install solar tube from roof to 1st fl, remove diagonal bracing in garage. | $40,000 |
| Oct 19, 2022 | Completed final sign-off Oct 2023 | 2154 Taylor St | revision to 202103156516, new garage bathroom, meter room, and remove rear storage. reconfigure 2nd fl kitchen, bath, laundry, rear sizing. reconfigure 3rd fl kitchen, bathroom, laundry, area glazing and 3 skylightDetails
revision to 202103156516, new garage bathroom, meter room, and remove rear storage. reconfigure 2nd fl kitchen, bath, laundry, rear sizing. reconfigure 3rd fl kitchen, bathroom, laundry, area glazing and 3 skylight | $10,000 |
| May 27, 2022 | Completed final sign-off Oct 2022 | 430 Warren Dr | to comply with nov 202184086. fire and water damage repair. 1 bathroom remodel and 1 kitchen remodel. remove all walls, sheetrock and add new insulation and sheetrock for unit 1Details
to comply with nov 202184086. fire and water damage repair. 1 bathroom remodel and 1 kitchen remodel. remove all walls, sheetrock and add new insulation and sheetrock for unit 1 | $130,000 |
| Oct 28, 2021 | Completed final sign-off Nov 2021 | 295 Mangels Av | first floor one bathroom remodel. changing bath tub to custom shower.Details
first floor one bathroom remodel. changing bath tub to custom shower. | $15,000 |
| May 7, 2021 | Completed final sign-off Aug 2021 | 232 04th Av | #f: kitchen and bathroom remodel. no structure changes. no plmbg changes. add new sub-panel to the unit for kitchen and bathroom.Details
#f: kitchen and bathroom remodel. no structure changes. no plmbg changes. add new sub-panel to the unit for kitchen and bathroom. | $35,000 |
| Mar 15, 2021 | Completed final sign-off Oct 2023 | 2154 Taylor St | kitchen & bathroom remodel in unit 1,2,3,4,6. layout reconfiguration in unit 3,4 and add washer/dryer to unit 1,5. reconfigure unit 5 to (2) bed (3) bath.Details
kitchen & bathroom remodel in unit 1,2,3,4,6. layout reconfiguration in unit 3,4 and add washer/dryer to unit 1,5. reconfigure unit 5 to (2) bed (3) bath. | $180,000 |
| Aug 29, 2019 | Completed final sign-off Mar 2021 | 634 South Van Ness Av | add new kitchen, 1 (n) bedroom and 1 (n) bathroom on 1st flr. add 1 (n) bedroom and 1 (n) bathroom on 3rd flr. infill lightwell.Details
add new kitchen, 1 (n) bedroom and 1 (n) bathroom on 1st flr. add 1 (n) bedroom and 1 (n) bathroom on 3rd flr. infill lightwell. | $96,000 |