Back to bathroom remodel contractors
Yiming Construction Com
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Sep 2026
- Last 24 months
- 2 permits filed
20 permits since 2000: 14 completed, 1 in progress, 5 never finaled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 in progress, 1 never finaled. Typically 16 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 60 Santa Fe Av | bathroom remodel in kind to include replace floor tile and wall tile replacement, (n) storage towel, replace shower wall, and sink.Details
bathroom remodel in kind to include replace floor tile and wall tile replacement, (n) storage towel, replace shower wall, and sink. | $10,000 |
| Sep 18, 2023 | Completed final sign-off Apr 2024 | 795 La Playa | kitchen remodel - replace cabinet and countertop with (n) applicance. bathroom remodel - replace tiels and vanity and toilet. paint wall and ceiling.Details
kitchen remodel - replace cabinet and countertop with (n) applicance. bathroom remodel - replace tiels and vanity and toilet. paint wall and ceiling. | $30,000 |
| Aug 3, 2023 | Completed final sign-off Apr 2026 | 355 San Benito Wy | master bathroom remodel -replace tub vanity and toilet , faucetsd -retile floor and wall -rewire electrical and install light and plugDetails
master bathroom remodel -replace tub vanity and toilet , faucetsd -retile floor and wall -rewire electrical and install light and plug | $10,000 |
| Jul 18, 2022 | Completed final sign-off Oct 2023 | 1511 44th Av | 1/f add one bathroom, family room, office, relocate washer and dryer.Details
1/f add one bathroom, family room, office, relocate washer and dryer. | $38,000 |
| Jan 12, 2021 | Never finaled issued May 2021, no final | 333 Felton St | to add 2 bedrooms at enclosed area on 1st fl. enclosed area with skylight above on 2/f. add a bathroom on 2/fDetails
to add 2 bedrooms at enclosed area on 1st fl. enclosed area with skylight above on 2/f. add a bathroom on 2/f | $60,000 |
| Oct 22, 2019 | Completed final sign-off Aug 2020 | 1295 Silver Av | add 2 bedrooms, 2 full bath, playroom at e gr flDetails
add 2 bedrooms, 2 full bath, playroom at e gr fl | $60,000 |