Back to bathroom remodel contractors
Yes Construction
- Based in
- Pacifica
- On San Francisco permits
- Mar 2009 to Jul 2025
- Last 24 months
- 6 permits filed
49 permits since 2000: 40 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 15 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2025 | Completed final sign-off Oct 2025 | 1879 Oak St | unit 2: install 1 new bathroom fan. install 2 4" recessed lighting cans.Details
unit 2: install 1 new bathroom fan. install 2 4" recessed lighting cans. | $2,500 |
| Jul 30, 2025 | Completed final sign-off Oct 2025 | 1879 Oak St | unit 4: install 1 new bathroom fan. install 2 recessed 4" lighting cans.Details
unit 4: install 1 new bathroom fan. install 2 recessed 4" lighting cans. | $2,500 |
| Jun 11, 2024 | Completed final sign-off May 2025 | 2550 Ocean Av | (e) vacant retail tenant space at 2550 ocean ave. no change of use. all work limited to interior only. work involves upgrading toilet areas, crating new all gender bathrooms modify partitions for offices and storage within the space at 1st & 2nd levels. create new compliant stair and exit access.Details
(e) vacant retail tenant space at 2550 ocean ave. no change of use. all work limited to interior only. work involves upgrading toilet areas, crating new all gender bathrooms modify partitions for offices and storage within the space at 1st & 2nd levels. create new compliant stair and exit access. | $60,000 |
| Oct 12, 2023 | Completed final sign-off Dec 2023 | 1449 South Van Ness Av | comply with complaint 202288905 to build out storage area within existing garage. repair wall adjacent to 1/2 bath, remodel 1/2 bath. add wall at garage space for storage room.Details
comply with complaint 202288905 to build out storage area within existing garage. repair wall adjacent to 1/2 bath, remodel 1/2 bath. add wall at garage space for storage room. | $8,000 |
| May 3, 2022 | Completed final sign-off Aug 2022 | 857 Greenwich St | one kitchen and one bathroom remodel in-kind, non-structural.Details
one kitchen and one bathroom remodel in-kind, non-structural. | $39,000 |
| Nov 15, 2021 | Completed final sign-off Feb 2022 | 861 Greenwich St | kitchen and bath room remodel in kind. no moving walls.Details
kitchen and bath room remodel in kind. no moving walls. | $40,000 |
| Apr 27, 2021 | Completed final sign-off Jul 2021 | 156 Terra Vista Av | kitchen and bathroom remodel in-kind. no moving walls.Details
kitchen and bathroom remodel in-kind. no moving walls. | $25,000 |
| Jan 17, 2020 | Expired or cancelled expired Jun 2025 | 1234 Capitol Av | comply with complaint #201935721 for wall electrical heater, replace bathroom fanDetails
comply with complaint #201935721 for wall electrical heater, replace bathroom fan | $500 |
| Apr 9, 2019 | Completed final sign-off May 2019 | 3563 Pierce St | remodel kitchen and bathroom. no change of existing floor planDetails
remodel kitchen and bathroom. no change of existing floor plan | $40,000 |
| Jan 4, 2019 | Completed final sign-off Mar 2019 | 145 Paloma Av | remodel existing two bathrooms. no change of existing floor planDetails
remodel existing two bathrooms. no change of existing floor plan | $30,000 |
| Sep 25, 2017 | Completed final sign-off Oct 2017 | 234 Myrtle St | remodel (e) bathroom. replace tub, toilet, shower valve ,tiles, fan & light.Details
remodel (e) bathroom. replace tub, toilet, shower valve ,tiles, fan & light. | $10,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2015 | 363 Bocana St | two unit building: 363 bocana - remodel existing master bathroom in kind(replace tub w/ shower); bathroom two, replace tiles only. 365 bocana - remodel (2) bathrooms in kind; hall bathroom change to shower, replace cabinet and sink in kitchen.Details
two unit building: 363 bocana - remodel existing master bathroom in kind(replace tub w/ shower); bathroom two, replace tiles only. 365 bocana - remodel (2) bathrooms in kind; hall bathroom change to shower, replace cabinet and sink in kitchen. | $30,000 |
| Jun 18, 2013 | Completed final sign-off Mar 2014 | 401 Madrid St | remodeling and alteration extg bldg. add bathroom at 1st floor and 2nd floor. rebuild rear yard stairs in kind.Details
remodeling and alteration extg bldg. add bathroom at 1st floor and 2nd floor. rebuild rear yard stairs in kind. | $80,000 |
| Jan 25, 2013 | Completed final sign-off Mar 2013 | 1 Daniel Burnham Ct | open shower wall just enough to replace tub & shower valve in bathroom. patch back in-kindDetails
open shower wall just enough to replace tub & shower valve in bathroom. patch back in-kind | $4,000 |
| Aug 16, 2010 | Completed final sign-off Sep 2010 | 3425 19th St | kitchen and bath remodel. replace kitchen cabinets, countertop, floor, kitchen sink, tub, shower valve, vanity, sink, floorDetails
kitchen and bath remodel. replace kitchen cabinets, countertop, floor, kitchen sink, tub, shower valve, vanity, sink, floor | $8,300 |
| Aug 12, 2009 | Completed final sign-off Jan 2010 | 20 Germania St | remodeling existing building changes all windows. add new bathroom at 1st floor. add redwood trim all around windows and garage door in front building. change the attic floor windows to 2-large windows. remodeling 2nd floor bathroom & bedrooms.Details
remodeling existing building changes all windows. add new bathroom at 1st floor. add redwood trim all around windows and garage door in front building. change the attic floor windows to 2-large windows. remodeling 2nd floor bathroom & bedrooms. | $68,000 |