Back to bathroom remodel contractors
Yefa Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to Jun 2026
- Last 24 months
- 24 permits filed
92 permits since 2000: 73 completed, 16 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 29 completed, 2 in progress. Typically 29 days from filing to permit and 310 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2025 | Completed final sign-off Jul 2026 | 883 De Haro St | revision bpa# 202403147816. 1/f: reconfigure 2 bedroom's layout. 2/f: reconfigure kitchen layout. 3/f: reconfigure bathroom layout. add new stairs at rear.Details
revision bpa# 202403147816. 1/f: reconfigure 2 bedroom's layout. 2/f: reconfigure kitchen layout. 3/f: reconfigure bathroom layout. add new stairs at rear. | $8,000 |
| May 13, 2025 | Completed final sign-off May 2026 | 862 York St | 1st floor: add media, den, 2 bedrooms, 2 full bath. relocate laundry. 2nd floor: existing kitchen reconfiguration. remodel existing dining, bedroom, and bathroom. add 1 powder room. infill lightwell, new skylights, patio & roof deck.Details
1st floor: add media, den, 2 bedrooms, 2 full bath. relocate laundry. 2nd floor: existing kitchen reconfiguration. remodel existing dining, bedroom, and bathroom. add 1 powder room. infill lightwell, new skylights, patio & roof deck. | $420,000 |
| Feb 21, 2025 | Completed final sign-off Aug 2025 | 1201 06th Av | unit 2: remodel kitchen (56sf) and 1 bath (35sf) in-kind. reference to administrative permit under bpa# 202502210875.Details
unit 2: remodel kitchen (56sf) and 1 bath (35sf) in-kind. reference to administrative permit under bpa# 202502210875. | $2 |
| Feb 21, 2025 | Completed final sign-off Aug 2025 | 1201 06th Av | administrative permit to remove unit #2 from scope of work under bpa# 202302081654. new remodel kitchen and bathroom is submitted under bpa# 202502210877.Details
administrative permit to remove unit #2 from scope of work under bpa# 202302081654. new remodel kitchen and bathroom is submitted under bpa# 202502210877. | |
| Feb 21, 2025 | Completed final sign-off May 2025 | 340 Silliman St | remodel kitchen (160sf) and bathroom (40sf) in kind.Details
remodel kitchen (160sf) and bathroom (40sf) in kind. | $30,000 |
| May 17, 2024 | Completed final sign-off Jan 2026 | 6 Skyview Wy | renovation to e single family dwelling 1st fl.create new family room, primary bedroom,bath 2nd fl, renovate kitchen, 2 baths, add new side facing and rear windows. add sliding doors, relocate skylight. infill e overhang at rear gr to floor aboveDetails
renovation to e single family dwelling 1st fl.create new family room, primary bedroom,bath 2nd fl, renovate kitchen, 2 baths, add new side facing and rear windows. add sliding doors, relocate skylight. infill e overhang at rear gr to floor above | $165,025 |
| May 1, 2024 | Completed final sign-off Dec 2024 | 41 Brunswick St | 1/f: relocate powder room and laundry. add new office, media and den. 2/f: kitchen remodel, add (1) full bath. ref to permit 202403198179.Details
1/f: relocate powder room and laundry. add new office, media and den. 2/f: kitchen remodel, add (1) full bath. ref to permit 202403198179. | $60,000 |
| Mar 4, 2024 | Completed final sign-off Oct 2024 | 21 Massasoit St | revision to permit 202310259392. add habitable area in (e) garage and rear below (e) floor area. new full bathroom. new hydronic heating systemDetails
revision to permit 202310259392. add habitable area in (e) garage and rear below (e) floor area. new full bathroom. new hydronic heating system | $25,000 |
| Feb 14, 2024 | Completed final sign-off Mar 2025 | 52 Los Palmos Dr | 1st/f: add 1 bedroom, family rm & 1 full bath (604 sf) 2nd/f: reconfigure kitchen per plan & remodel bathroom in-kindDetails
1st/f: add 1 bedroom, family rm & 1 full bath (604 sf) 2nd/f: reconfigure kitchen per plan & remodel bathroom in-kind | $85,000 |
| Oct 20, 2023 | Completed final sign-off Dec 2024 | 57 Longview Ct | interior remodel w/(n) kitchen, bathrooms, interior finishes & skylights; extend (e) space to rear of bldg for (n) family room & full bath; (e) stucco on north & east wall to be replaced entirely; replace (e) street facing windows w/aluminum cld, and (n) glass sliding doors @ rear; raise hood deckDetails
interior remodel w/(n) kitchen, bathrooms, interior finishes & skylights; extend (e) space to rear of bldg for (n) family room & full bath; (e) stucco on north & east wall to be replaced entirely; replace (e) street facing windows w/aluminum cld, and (n) glass sliding doors @ rear; raise hood deck | $350,000 |
| Feb 17, 2023 | Completed final sign-off Jun 2023 | 31 Ramona Av | unit#31 kitchen (110 s.f) and bathroom (30 s.f) remodel in kind unit#33 kitchen (110 s.f) and bathroom (30 s.f) remodel in kindDetails
unit#31 kitchen (110 s.f) and bathroom (30 s.f) remodel in kind unit#33 kitchen (110 s.f) and bathroom (30 s.f) remodel in kind | $12,000 |
| Feb 10, 2023 | Completed final sign-off Dec 2023 | 533 Peralta Av | revision to pa# 2022-0927-3266; switch location of bathroom/washer and dryer replace stair landing (interior)Details
revision to pa# 2022-0927-3266; switch location of bathroom/washer and dryer replace stair landing (interior) | |
| Jan 23, 2023 | Completed final sign-off Aug 2023 | 2660 Filbert St | remodel (1) kitchen, (1) bath, add (1) new 1/2 bath + (1) new full bath, remodel (1) 1/2 bath to full bath. replace vanity @ (e) bath (3rd/f), replace water heater, reconfig ducts from furnace, new closet + reconfig stair landing @ 2/f foyer, open wall between kitchen + dining, cover int side of (1)Details
remodel (1) kitchen, (1) bath, add (1) new 1/2 bath + (1) new full bath, remodel (1) 1/2 bath to full bath. replace vanity @ (e) bath (3rd/f), replace water heater, reconfig ducts from furnace, new closet + reconfig stair landing @ 2/f foyer, open wall between kitchen + dining, cover int side of (1) | $125,000 |
| Jan 6, 2023 | Completed final sign-off Oct 2023 | 176 Banks St | rev to pa202210285440: 1/f: reconfigure bedroom & bathoom layout. 2/f: reconfigure living, bedrooms, bathroom and kitchen.Details
rev to pa202210285440: 1/f: reconfigure bedroom & bathoom layout. 2/f: reconfigure living, bedrooms, bathroom and kitchen. | |
| Oct 28, 2022 | Completed final sign-off Oct 2023 | 176 Banks St | 1st fl: add family, bedroom, 1 full bath, and 1 half bath. 2nd fl: total reconfigure per layout. 2 new skylightsDetails
1st fl: add family, bedroom, 1 full bath, and 1 half bath. 2nd fl: total reconfigure per layout. 2 new skylights | $90,000 |
| Sep 27, 2022 | Completed final sign-off Dec 2023 | 533 Peralta Av | lower level construction to create 798 sq. ft. habitable space from unconditioned space, add (1.5) bathrooms, (1) bedroom; upper level remodel, remove (1) bath, kitchen reconfiguration, replace (2) doors, (2) windows on back of house, replace siding at backDetails
lower level construction to create 798 sq. ft. habitable space from unconditioned space, add (1.5) bathrooms, (1) bedroom; upper level remodel, remove (1) bath, kitchen reconfiguration, replace (2) doors, (2) windows on back of house, replace siding at back | $200,000 |
| Mar 29, 2022 | Completed final sign-off Aug 2022 | 2067 Green St | total remodel of three bathrooms. in kindDetails
total remodel of three bathrooms. in kind | $35,000 |
| Nov 17, 2021 | Completed final sign-off Jan 2022 | 336 Avila St | 1st floor: 1 bathroom remodel.Details
1st floor: 1 bathroom remodel. | $5,000 |
| Oct 14, 2021 | Completed final sign-off Dec 2022 | 228 Ewing Tr | 1st floor: add 2 bedrooms,media & 1 full bath. infill at rear. 2nd floor: remodel kitchen & bath per layout, add 1 full bath.Details
1st floor: add 2 bedrooms,media & 1 full bath. infill at rear. 2nd floor: remodel kitchen & bath per layout, add 1 full bath. | $65,000 |
| Sep 23, 2021 | In progress issued Oct 2023 | 269 Stratford Dr | new addition above the existing kitchen and dining room areas. new addition to provide one bedroom, full bathroom, and new stairs to access the addition from the existing hallway.Details
new addition above the existing kitchen and dining room areas. new addition to provide one bedroom, full bathroom, and new stairs to access the addition from the existing hallway. | $105,000 |
| Aug 10, 2021 | Completed final sign-off Nov 2021 | 3747 Cabrillo St | remodel kitchen (49 sf) and bath (40 sf). convert gas laundry appliances to electric in same location. lighting comly with cec 150.0(k).Details
remodel kitchen (49 sf) and bath (40 sf). convert gas laundry appliances to electric in same location. lighting comly with cec 150.0(k). | $25,000 |
| May 21, 2021 | Completed final sign-off Aug 2023 | 190 Putnam St | 1st fl. add bedroom and 1 full bath 2nd fl. total kitchen and bathroom remodel, reconfigure interior stairsDetails
1st fl. add bedroom and 1 full bath 2nd fl. total kitchen and bathroom remodel, reconfigure interior stairs | $85,000 |
| Aug 12, 2020 | Completed final sign-off Jan 2025 | 1779 15th St | vertical addition to existing 3 unit building. add fourth floor for new bedroom level connected to 3rd floor unit- remodel 3rd floor unit for total 5 bedroom 3 1/2 bath unit. remodel first and second floor units. replace existing rear non-conforming egress stair.document/verify 3rd unit on ground flDetails
vertical addition to existing 3 unit building. add fourth floor for new bedroom level connected to 3rd floor unit- remodel 3rd floor unit for total 5 bedroom 3 1/2 bath unit. remodel first and second floor units. replace existing rear non-conforming egress stair.document/verify 3rd unit on ground fl | $275,000 |
| Aug 4, 2020 | Completed final sign-off Nov 2021 | 242 Baltimore Wy | 1st floor: add 2 bedroom,2 full bath & media room. 2nd floor: remodel living rm, kitchen & bath. add 1 full bath & office. infill at rear, add patio @ rear. infill lightwell, add skylight. install nfpa 13d sprinklers throughout, under separate permit. (horizontal addition)Details
1st floor: add 2 bedroom,2 full bath & media room. 2nd floor: remodel living rm, kitchen & bath. add 1 full bath & office. infill at rear, add patio @ rear. infill lightwell, add skylight. install nfpa 13d sprinklers throughout, under separate permit. (horizontal addition) | $78,000 |
| Nov 5, 2019 | In progress issued Dec 2023 | 617 Elizabeth St | horizontal & vertical expansion to (e) (3) bedroom, (2.5) bath house to create total of (4) bedroom, (3.5) bath main unit including (n) rear facing decks. adu compromising of (1) bedroom & (1) bath will be created on 1st fl & facing rear yard. adu under permmit #: 202211307361.Details
horizontal & vertical expansion to (e) (3) bedroom, (2.5) bath house to create total of (4) bedroom, (3.5) bath main unit including (n) rear facing decks. adu compromising of (1) bedroom & (1) bath will be created on 1st fl & facing rear yard. adu under permmit #: 202211307361. | $245,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2023 | 214 09th Av | remodel & include rear yard horizontal addition (on 3 levels), 2nd fl east deck, some ground fl excavation & foundation work, (n) bathroom, remodel kitchens (2) & bathrooms, some (n) windows & doors.Details
remodel & include rear yard horizontal addition (on 3 levels), 2nd fl east deck, some ground fl excavation & foundation work, (n) bathroom, remodel kitchens (2) & bathrooms, some (n) windows & doors. | $345,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2023 | 1501 35th Av | comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylightsDetails
comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylights | $20,000 |
| Jul 21, 2017 | Completed final sign-off Apr 2024 | 2200 Turk Bl | adu per ord #162-16. add 3 studios units. (1) kitchen & (1) bath for each unit.Details
adu per ord #162-16. add 3 studios units. (1) kitchen & (1) bath for each unit. | $200,000 |
| Jun 12, 2017 | Completed final sign-off May 2023 | 2220 Turk Bl | add 3 adus per ord. 162-16. (2) studio units & (1) 1-bedroom unit. (1) kitchen & (1) bath for each unit. soft story permit #2017-0612-9016.Details
add 3 adus per ord. 162-16. (2) studio units & (1) 1-bedroom unit. (1) kitchen & (1) bath for each unit. soft story permit #2017-0612-9016. | $200,000 |
| Jun 5, 2017 | Completed final sign-off Apr 2024 | 2210 Turk Bl | ground fl: add (2) studio units with (1) kitchen & (1) bath for each unit. per ord 162-16. seismic done under 2017-0605-8380. sprinkler to nfpa 13-r deferred.Details
ground fl: add (2) studio units with (1) kitchen & (1) bath for each unit. per ord 162-16. seismic done under 2017-0605-8380. sprinkler to nfpa 13-r deferred. | $200,000 |
| May 30, 2017 | Completed final sign-off May 2023 | 2230 Turk Bl | add 3 adus per ord. 162-16. (1) 2-bedroom unit, (2) 1-bedroom units; (1) kitchen & (1) bath for each unit. soft story permit pa #201705267737.Details
add 3 adus per ord. 162-16. (1) 2-bedroom unit, (2) 1-bedroom units; (1) kitchen & (1) bath for each unit. soft story permit pa #201705267737. | $200,000 |