Back to kitchen remodel contractors
Yao Star Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Sep 2026
- Last 24 months
- 33 permits filed
196 permits since 2000: 168 completed, 10 in progress, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
65 kitchen remodel permits: 53 completed, 4 in progress, 6 never finaled, 2 expired or cancelled. Typically 1 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 1871 31st Av | to partially comply with nov# 202544607: replace kitchen cabinets and countertop with (e) plumbing and electrical.Details
to partially comply with nov# 202544607: replace kitchen cabinets and countertop with (e) plumbing and electrical. | $8,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 1883 31st Av | remodel 1 bathroom and 1 kitchen at 2nd floor. replace 2 new vinyl windows in front of house. replace 3 windows and one siding door at back side of the buildingDetails
remodel 1 bathroom and 1 kitchen at 2nd floor. replace 2 new vinyl windows in front of house. replace 3 windows and one siding door at back side of the building | $45,000 |
| Apr 2, 2026 | Completed final sign-off Aug 2026 | 1670 26th Av | remodel kitchen and bathroom. at 2nd floor, replace 2 windows (vinyl) in front of house, facing the street, upgrade 2nd floor electrical wires, replace 1 window in bathroom, not facing street.Details
remodel kitchen and bathroom. at 2nd floor, replace 2 windows (vinyl) in front of house, facing the street, upgrade 2nd floor electrical wires, replace 1 window in bathroom, not facing street. | $36,000 |
| Jan 20, 2026 | In progress issued Feb 2026 | 1647 24th Av | 1st fl: infill at rear. add 2 baths, laundry room, 2 bedroom and family room. 2nd fl: remodel kitchen and bath. add 1.5 bath, reconfigure interior stairs. replace front windows with vinyl windows.Details
1st fl: infill at rear. add 2 baths, laundry room, 2 bedroom and family room. 2nd fl: remodel kitchen and bath. add 1.5 bath, reconfigure interior stairs. replace front windows with vinyl windows. | $320,000 |
| Sep 3, 2025 | In progress issued Oct 2025 | 2519 32nd Av | interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cielingDetails
interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cieling | $400,000 |
| Jul 23, 2025 | Completed final sign-off Apr 2026 | 238 Hamilton St | remodel kitchen and 1 bathroom at 2nd fl. replace front 2 windows, 6 windows (2 in the backyard and 4 in the middle porch) replace around 500 sqft. sheet rck for living room dining room and two bedrooms/hallway install insulaltion for ceiling and wall (no structural wall change)Details
remodel kitchen and 1 bathroom at 2nd fl. replace front 2 windows, 6 windows (2 in the backyard and 4 in the middle porch) replace around 500 sqft. sheet rck for living room dining room and two bedrooms/hallway install insulaltion for ceiling and wall (no structural wall change) | $80,000 |
| Jun 20, 2025 | Completed final sign-off Jul 2025 | 741 Edinburgh St | replace new cabinets, counter top, sink and the hardwood floor at the kitchen. replace new tiles, tub, faucet, new vanity, new toilet on 2nd floor bathroom. replace new electrical wires on 2nd floor. comply with #202539159. construct to get start work inspection.Details
replace new cabinets, counter top, sink and the hardwood floor at the kitchen. replace new tiles, tub, faucet, new vanity, new toilet on 2nd floor bathroom. replace new electrical wires on 2nd floor. comply with #202539159. construct to get start work inspection. | $25,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2025 | 1678 23rd Av | comply w/ complaint #202536511:(1)replace cabinets, new countertop & new floor for the kitchen. install (n) electric system for kitchen. (2)replace two vanities and two toilets in two bathrooms. replace floor tile at hallway bathroom. replace 2 (n) windows in kitchen, in kind in same openingsDetails
comply w/ complaint #202536511:(1)replace cabinets, new countertop & new floor for the kitchen. install (n) electric system for kitchen. (2)replace two vanities and two toilets in two bathrooms. replace floor tile at hallway bathroom. replace 2 (n) windows in kitchen, in kind in same openings | $30,000 |
| Dec 12, 2024 | Completed final sign-off Jul 2025 | 1036 Munich St | kitchen and 1-bathroom remodel @ 2/f, like for like, no wall demolition or construction, no change in plumbing fixture count.Details
kitchen and 1-bathroom remodel @ 2/f, like for like, no wall demolition or construction, no change in plumbing fixture count. | $20,000 |
| Oct 16, 2024 | Completed final sign-off Dec 2025 | 773 46th Av | 2nd fl: relocate kitchen, dining & bathroom. add (1) bathroom & remodel bedrooms per planDetails
2nd fl: relocate kitchen, dining & bathroom. add (1) bathroom & remodel bedrooms per plan | $63,000 |
| Jul 2, 2024 | Completed final sign-off Dec 2024 | 1463 Funston Av | remodel (1) kitchen. (1) half bathroom at 2/f. remodel (2) full bathrooms at 3rd floor. upgrade whole house electric work and upgrade to 200 amp service. remodel laundry room at 2/f. bathrooms shall include exhaust fans. kitchen shall include hood.Details
remodel (1) kitchen. (1) half bathroom at 2/f. remodel (2) full bathrooms at 3rd floor. upgrade whole house electric work and upgrade to 200 amp service. remodel laundry room at 2/f. bathrooms shall include exhaust fans. kitchen shall include hood. | $60,000 |
| May 9, 2024 | Completed final sign-off Dec 2025 | 238 Louisburg St | 2/f: remodel 1 kitchen & 1 bathroom, in-kind. ; replace whole drywall with 5/8in type-x gypsum board.Details
2/f: remodel 1 kitchen & 1 bathroom, in-kind. ; replace whole drywall with 5/8in type-x gypsum board. | $68,000 |
| Apr 22, 2024 | Completed final sign-off May 2024 | 318 Chicago Wy | remove the kitchen cabinets and countertops, floor tiles, remove the bathroom tile and tub. change tube shower pan. replace new vanity at 2nd fl. comply with complaint 202422347. install new cabinets and counter top at the kitchen.Details
remove the kitchen cabinets and countertops, floor tiles, remove the bathroom tile and tub. change tube shower pan. replace new vanity at 2nd fl. comply with complaint 202422347. install new cabinets and counter top at the kitchen. | $20,000 |
| Apr 15, 2024 | Completed final sign-off Jul 2024 | 1962 33rd Av | remodel kitchen. bathroom at second floor in kind. replace front (2) new windows and 1 window. 1 sliding door at back side. replace new furnace in garage. and upgrade 125 amp electric services.Details
remodel kitchen. bathroom at second floor in kind. replace front (2) new windows and 1 window. 1 sliding door at back side. replace new furnace in garage. and upgrade 125 amp electric services. | $25,000 |
| Apr 11, 2024 | Completed final sign-off Apr 2025 | 2169 26th Av | renovate kitchen on 2nd floor. replace 18 windows. convert partial garage space to 1 office, 1 gym, and 2 bathrooms. aprox 716 sq ft. front window to be in kindDetails
renovate kitchen on 2nd floor. replace 18 windows. convert partial garage space to 1 office, 1 gym, and 2 bathrooms. aprox 716 sq ft. front window to be in kind | $80,000 |
| Apr 21, 2023 | Completed final sign-off Sep 2023 | 3040 22nd Av | remodel kitchen and bathroom. replace new 5/8 sheetrock at 2nd floor. upgrade whole house electric workDetails
remodel kitchen and bathroom. replace new 5/8 sheetrock at 2nd floor. upgrade whole house electric work | $60,000 |
| Aug 26, 2022 | Completed final sign-off May 2023 | 2728 35th Av | 2/f: remodel 1 kitchen and remodel (e) bathroom. no other work pefformed.Details
2/f: remodel 1 kitchen and remodel (e) bathroom. no other work pefformed. | $32,000 |
| Aug 25, 2022 | Completed final sign-off Apr 2025 | 2239 43rd Av | compliance w/ compliant notice 202290967. proposed interior remodeling of (e) sfh: 1st fl conversion of storage space @ 1st fl to habitable space to incorporate bedrooms & bathrooms all with envelope. 2nd flor modi of 2nd fl remodel kitchen and bath. additon of new deck @ and flr to provide accessDetails
compliance w/ compliant notice 202290967. proposed interior remodeling of (e) sfh: 1st fl conversion of storage space @ 1st fl to habitable space to incorporate bedrooms & bathrooms all with envelope. 2nd flor modi of 2nd fl remodel kitchen and bath. additon of new deck @ and flr to provide access | $250,000 |
| Jun 29, 2022 | Completed final sign-off Dec 2022 | 2217 16th Av | revision to pa# 202110180610. add ground floor bedroom, bathroom, media room + kitchenette (2 burner cooktop, no oven) within (e) footprint. add 2 windows to rear facade. not visible from street.Details
revision to pa# 202110180610. add ground floor bedroom, bathroom, media room + kitchenette (2 burner cooktop, no oven) within (e) footprint. add 2 windows to rear facade. not visible from street. | $71,000 |
| Jan 21, 2022 | Completed final sign-off Jun 2022 | 163 Whittier St | to comply with nov 202182937, reconfigure existing bathroom on ground fl; convert (e) playroom to bedroom and (e) playroom; add wet bar; 2nd fl - remodel kitchen and reconfigure (e) bathroom and add (n) half bath; no new window openings under this permitDetails
to comply with nov 202182937, reconfigure existing bathroom on ground fl; convert (e) playroom to bedroom and (e) playroom; add wet bar; 2nd fl - remodel kitchen and reconfigure (e) bathroom and add (n) half bath; no new window openings under this permit | $46,000 |
| Jan 3, 2022 | Completed final sign-off Feb 2022 | 669 Spruce St | remodel kitchen. replace new cabinets. new countertop. replace new sink. no changes layout and no wall openingDetails
remodel kitchen. replace new cabinets. new countertop. replace new sink. no changes layout and no wall opening | $15,000 |
| Dec 21, 2021 | Never finaled issued Feb 2022, no final | 1643 11th Av | 1st fl: re-configure (e) interior space 2 new bedrooms, 2 bathrooms, family rm, laundry and storage area. 2nd fl: re-configure bathrooms, add new bathrooms. kitchen remodel in-kind, infill (e) lightwell and (e) stair , build new staircase.Details
1st fl: re-configure (e) interior space 2 new bedrooms, 2 bathrooms, family rm, laundry and storage area. 2nd fl: re-configure bathrooms, add new bathrooms. kitchen remodel in-kind, infill (e) lightwell and (e) stair , build new staircase. | $110,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2022 | 2217 16th Av | interior remodel, kitchen and bath remodel, add full bath, remodel interior stair, no expansion of bldg envelope or work at front facade visible from street.Details
interior remodel, kitchen and bath remodel, add full bath, remodel interior stair, no expansion of bldg envelope or work at front facade visible from street. | $120,000 |
| Jun 4, 2021 | Completed final sign-off Aug 2022 | 2295 25th Av | 1st floor: add 2 bedrooms, 2 full baths, office and family. 2nd floor: remodel kitchen and bath. add bedroom and full bath. replace all window in kind.Details
1st floor: add 2 bedrooms, 2 full baths, office and family. 2nd floor: remodel kitchen and bath. add bedroom and full bath. replace all window in kind. | $140,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 579 Naples St | 1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer.Details
1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer. | $98,000 |
| Mar 4, 2021 | Completed final sign-off Aug 2024 | 1274 22nd Av | add second unit per density rule on 1st floor: 1)infill under the extg structure at rear. 2)infill the south side lightwell on 1st floor. 3)add living/dining room, bedroom, office, kitchen, entertainment and one 3 fixture bathroom. 2nd floor: 4)remove wall between living room and dining room.Details
add second unit per density rule on 1st floor: 1)infill under the extg structure at rear. 2)infill the south side lightwell on 1st floor. 3)add living/dining room, bedroom, office, kitchen, entertainment and one 3 fixture bathroom. 2nd floor: 4)remove wall between living room and dining room. | $20,000 |
| Nov 12, 2020 | Completed final sign-off Apr 2023 | 590 27th Av | construct 2 bedroom, 1 bathroom, & laundry at g/f. remodel (e) bathroom, relocate (e) kitchen. add 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor. construct new dek at rear of bldg (18' x 4'6"). in-fill (e) lighwell & install 4 skylights.Details
construct 2 bedroom, 1 bathroom, & laundry at g/f. remodel (e) bathroom, relocate (e) kitchen. add 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor. construct new dek at rear of bldg (18' x 4'6"). in-fill (e) lighwell & install 4 skylights. | $120,000 |
| Nov 4, 2020 | Completed final sign-off Jun 2021 | 2601 31st Av | remodel (e) kitchen, bathroom, and add one new bathroom at 2nd floor.Details
remodel (e) kitchen, bathroom, and add one new bathroom at 2nd floor. | $35,000 |
| Sep 5, 2020 | Completed final sign-off May 2021 | 25 Ottawa Av | ground floor relocate half bath and add new bath, bedroom, office and media room. 2nd floor: rearrange bathroom and add new bathroom, remodel kitchen per plan. no new opening proposed.Details
ground floor relocate half bath and add new bath, bedroom, office and media room. 2nd floor: rearrange bathroom and add new bathroom, remodel kitchen per plan. no new opening proposed. | $90,000 |
| Aug 12, 2020 | Completed final sign-off Dec 2020 | 1652 Greenwich St | 2nd flr unit_remodel one kitchen and 1.5 bathroom in kind. remodel laudry area. all work in kind.Details
2nd flr unit_remodel one kitchen and 1.5 bathroom in kind. remodel laudry area. all work in kind. | $40,000 |
| Mar 4, 2020 | Completed final sign-off Oct 2021 | 2623 22nd Av | interior renovation 1st fl - add 2 bedrooms, 2 (3) fixture bathrooms, add 1 entertainment; 2nd fl - relocate (e) kitchen & bathroom, add 1 office and 1 (3) fixture bathroom; eliminate (e) lightwell.Details
interior renovation 1st fl - add 2 bedrooms, 2 (3) fixture bathrooms, add 1 entertainment; 2nd fl - relocate (e) kitchen & bathroom, add 1 office and 1 (3) fixture bathroom; eliminate (e) lightwell. | $50,000 |
| Dec 27, 2019 | Completed final sign-off Jul 2020 | 600 Felton St | 2/f: demo wall between (e) living room & kitchen. demo (e) fireplace. construct (n) bathroom for (e) master bedroom, n 1/2 bath (n) elec. fireplace in (e) dining room. g/f: construction 3 new bedrooms, 2 (n) bathrooms, (n) rec room, relocate (e) furnace & w/h, enlarge wndw in (n) bed 3 & garage.Details
2/f: demo wall between (e) living room & kitchen. demo (e) fireplace. construct (n) bathroom for (e) master bedroom, n 1/2 bath (n) elec. fireplace in (e) dining room. g/f: construction 3 new bedrooms, 2 (n) bathrooms, (n) rec room, relocate (e) furnace & w/h, enlarge wndw in (n) bed 3 & garage. | $65,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 723 43rd Av | 1)convert 2 bedroom, 2 bathroom, and media room at ground floor. 2)remodel extg kitchen, & add one bathroom at 2nd floor. 3)new deck at rear of bldg. (size approx 9'-6x 16'-8")Details
1)convert 2 bedroom, 2 bathroom, and media room at ground floor. 2)remodel extg kitchen, & add one bathroom at 2nd floor. 3)new deck at rear of bldg. (size approx 9'-6x 16'-8") | $168,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2020 | 723 43rd Av | replace new wood floor for kitchen. replace 5 new vinly windows at backside in kind.Details
replace new wood floor for kitchen. replace 5 new vinly windows at backside in kind. | $5,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 335 Head St | remodel kitchen at second floor. 10'x12'.Details
remodel kitchen at second floor. 10'x12'. | $12,000 |
| Jul 1, 2019 | Completed final sign-off Oct 2019 | 426 Sweeny St | 1st flr - add 2 bedrooms, 2 baths, office and family room. 2nd floor - relocate kitchen and add 1 full bathDetails
1st flr - add 2 bedrooms, 2 baths, office and family room. 2nd floor - relocate kitchen and add 1 full bath | $80,000 |
| Jun 17, 2019 | Completed final sign-off Oct 2019 | 961 Athens St | remodel 2 full bathrooms (5x8), kitchen (10x11) at 2nd floor. replace new 5/8 type x sheetrock. for bedroom dining room., fam room about 1500 sq ftDetails
remodel 2 full bathrooms (5x8), kitchen (10x11) at 2nd floor. replace new 5/8 type x sheetrock. for bedroom dining room., fam room about 1500 sq ft | $40,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 1663 37th Av | construct 2 bedrooms, 2 full bathrooms & half bathroom @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & re-built (e) interior staircase from 2nd fl down to ground fl & upgrade partial ceiling joists at 2nd fl; construct new deck w/staircase at rear of bldg (size 17'x12')Details
construct 2 bedrooms, 2 full bathrooms & half bathroom @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & re-built (e) interior staircase from 2nd fl down to ground fl & upgrade partial ceiling joists at 2nd fl; construct new deck w/staircase at rear of bldg (size 17'x12') | $125,000 |
| Jan 16, 2019 | Completed final sign-off Jan 2021 | 2278 29th Av | remodel kitchen (10x12) a full bathroom (5x8) replace new sheetrock 2000 sq ft for bedroom, 1 dining room 1, living room at 2nd floor (all interior wall)Details
remodel kitchen (10x12) a full bathroom (5x8) replace new sheetrock 2000 sq ft for bedroom, 1 dining room 1, living room at 2nd floor (all interior wall) | $35,000 |
| Nov 29, 2018 | Completed final sign-off May 2019 | 2400 41st Av | remodel kitchen and 1 full bathroom at second floorDetails
remodel kitchen and 1 full bathroom at second floor | $20,000 |
| May 10, 2018 | Completed final sign-off Aug 2019 | 255 Tingley St | remodel 2 bathrooms, 1 kitchen. replace new sheetrock for 3 bedrooms (100 sf max), 1 living room, 1 dining room at second floor; n/a maherDetails
remodel 2 bathrooms, 1 kitchen. replace new sheetrock for 3 bedrooms (100 sf max), 1 living room, 1 dining room at second floor; n/a maher | $28,000 |
| May 10, 2018 | Completed final sign-off Jun 2019 | 1838 33rd Av | remodel kitchen, 2 bathrooms at second floor. replace new sheetrock for dining room, living room (100 sq.ft. max), 3 bedrooms at second floor.Details
remodel kitchen, 2 bathrooms at second floor. replace new sheetrock for dining room, living room (100 sq.ft. max), 3 bedrooms at second floor. | $28,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2018 | 568 41st Av | comply with n.o.v 201832682. kitchen and bathroom remodel. replace tile at bathroom floor.Details
comply with n.o.v 201832682. kitchen and bathroom remodel. replace tile at bathroom floor. | $6,000 |
| Dec 15, 2017 | Completed final sign-off Jul 2020 | 2463 19th Av | legalize 1st fl as 2nd unit including 3 beds,3 full baths,kitchen, dining and living.remodel kitchen and bath, add 2 full bath, relocate stairs, remove walls & add flat skylights on 2nd fl. enlarge garage door. replace w/aluminum clad wood windows at front & side,vinyl winddows at rear.Details
legalize 1st fl as 2nd unit including 3 beds,3 full baths,kitchen, dining and living.remodel kitchen and bath, add 2 full bath, relocate stairs, remove walls & add flat skylights on 2nd fl. enlarge garage door. replace w/aluminum clad wood windows at front & side,vinyl winddows at rear. | $120,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 250 Burrows St | remodel on 2nd floor - add 1 new bathroom & 1/2 bathroom, remodel kitchen & new partition wall, enlarge computer room w/closet.Details
remodel on 2nd floor - add 1 new bathroom & 1/2 bathroom, remodel kitchen & new partition wall, enlarge computer room w/closet. | $30,000 |
| Aug 8, 2017 | Never finaled issued Aug 2017, no final | 250 Burrows St | remodel (1) full bathroom, (1) powder room, (1) kitchenDetails
remodel (1) full bathroom, (1) powder room, (1) kitchen | $32,000 |
| Apr 28, 2017 | Completed final sign-off Jul 2017 | 240 Holyoke St | interior remodeling 0 2nd floor - add 1 bathroom, kitchen remodel; 1st floor - add 1 bathrooms, 2 bedrooms, family room and laundry room.Details
interior remodeling 0 2nd floor - add 1 bathroom, kitchen remodel; 1st floor - add 1 bathrooms, 2 bedrooms, family room and laundry room. | $40,000 |
| Feb 7, 2017 | Completed final sign-off Oct 2017 | 473 11th Av | add 2 bedrooms, 2 bathrooms, 1 family room & mud room on 1st floor per plan; kitchen remodel and add a full bath on 2nd floorDetails
add 2 bedrooms, 2 bathrooms, 1 family room & mud room on 1st floor per plan; kitchen remodel and add a full bath on 2nd floor | $50,000 |
| Dec 14, 2016 | Expired or cancelled expired Mar 2018 | 212 Howth St | remodel 2 full bathroom, kitchen, 3 bedrooms, one dining room, one family room at 2nd floor. replace new windows at back of building.Details
remodel 2 full bathroom, kitchen, 3 bedrooms, one dining room, one family room at 2nd floor. replace new windows at back of building. | $30,000 |
| Oct 13, 2016 | Completed final sign-off Jan 2017 | 1440 09th Av | remodel 2 full bathroom. 1 kitchen at 2/f. replace new 5/8in sheetrock and change 8 windows at rear side.Details
remodel 2 full bathroom. 1 kitchen at 2/f. replace new 5/8in sheetrock and change 8 windows at rear side. | $35,000 |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 473 11th Av | remodel kitchen 2/f, replace (3) bedroom wall/sheetrock, change (10) windows rear building, remodel (1) full bath 2/f, new drywall to be 5/8" type "x" at all areas where removed/replaced.Details
remodel kitchen 2/f, replace (3) bedroom wall/sheetrock, change (10) windows rear building, remodel (1) full bath 2/f, new drywall to be 5/8" type "x" at all areas where removed/replaced. | $20,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 435 Spruce St | remodel 1 bathroom and 1 half bathroom. remodel kitchen. change 10 windows at the rear side and the left side. paint the whole unit. no change on walls.Details
remodel 1 bathroom and 1 half bathroom. remodel kitchen. change 10 windows at the rear side and the left side. paint the whole unit. no change on walls. | $25,000 |
| May 25, 2016 | Completed final sign-off Oct 2016 | 47 Meadowbrook Dr | remodel kitchen at second floor.Details
remodel kitchen at second floor. | $12,000 |
| Sep 10, 2015 | Completed final sign-off Feb 2016 | 756 Valencia St | remodel kitchen, 3 full bathrooms at 2nd flDetails
remodel kitchen, 3 full bathrooms at 2nd fl | $47,000 |
| Jul 8, 2015 | Completed final sign-off Sep 2015 | 34 Malta Dr | remodel kitchen and rmeodel 2 full bathroom at third floor. no walls to be altered or removed.Details
remodel kitchen and rmeodel 2 full bathroom at third floor. no walls to be altered or removed. | $25,000 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 269 Stratford Dr | new bathroom, bedroom and laundry room on 1st floor. remodel (e) kitchen, remove wall between kitchen and dining room. remodel (e) bathroom on 2nd floor.Details
new bathroom, bedroom and laundry room on 1st floor. remodel (e) kitchen, remove wall between kitchen and dining room. remodel (e) bathroom on 2nd floor. | $40,000 |
| Jun 26, 2014 | Completed final sign-off Dec 2014 | 328 Cambridge St | remodel kitchen & remodel 2 full bathrooms, change 4 windows at second floor at rear. not visible from street. kitchen comply cec 150 (k).Details
remodel kitchen & remodel 2 full bathrooms, change 4 windows at second floor at rear. not visible from street. kitchen comply cec 150 (k). | $29,000 |
| Apr 24, 2014 | Completed final sign-off Aug 2014 | 2236 Cecilia Av | remodel extg kitchen. replace counter, cabinets, convert dining room into bed room and rewire electrical and lighting for kitchen. all work at 2nd floor.Details
remodel extg kitchen. replace counter, cabinets, convert dining room into bed room and rewire electrical and lighting for kitchen. all work at 2nd floor. | $22,000 |
| Feb 11, 2014 | Completed final sign-off May 2014 | 1347 41st Av | remodel kitchen & two full bathroom at second floor, change 4 windows at rear of bldg, not visible from street, max u-factor 0.40Details
remodel kitchen & two full bathroom at second floor, change 4 windows at rear of bldg, not visible from street, max u-factor 0.40 | $2,000 |
| Feb 3, 2014 | Expired or cancelled cancelled Jun 2016 | 138 08th Av | remodel 2nd and 3rd floor bath room and kitchen.Details
remodel 2nd and 3rd floor bath room and kitchen. | $50,000 |
| Jul 11, 2013 | Never finaled issued Jul 2013, no final | 3726 Judah St | remodel one full bathrm and remodel kitchen; change new tile on kitchen floor, permanently installed lighting to comply with cec150(k) and 150(k)Details
remodel one full bathrm and remodel kitchen; change new tile on kitchen floor, permanently installed lighting to comply with cec150(k) and 150(k) | $12,000 |
| Mar 6, 2013 | Completed final sign-off Aug 2013 | 1526 19th Av | change kitchen cabinets, countertop. change 1/2 bathroom tiles & toilet. re-sue (e) appliancesDetails
change kitchen cabinets, countertop. change 1/2 bathroom tiles & toilet. re-sue (e) appliances | $25,000 |
| Aug 9, 2012 | Completed final sign-off Sep 2012 | 49 Martha Av | fix dining room sheetrock and floor, change kitchen floor to hardwoodDetails
fix dining room sheetrock and floor, change kitchen floor to hardwood | $2,500 |
| Aug 8, 2012 | Completed final sign-off Aug 2012 | 315 Virginia Av | change kitchen top cabinets and put new tile at kitchen wall. no change on walls and openingsDetails
change kitchen top cabinets and put new tile at kitchen wall. no change on walls and openings | $2,500 |
| May 27, 2008 | Completed final sign-off Sep 2023 | 107 Lunado Wy | horizontal rear addition: 5'x8" @ basement & new deck above additional 1/f; vertical addition: 8'-6" from midpoint of (e) roo fto midpoint of new roof; new bedroom & new baths @ new 2nd flr lvl, new pool @ (e) basement lvl; (e) kitchen to be removed; new interior stairs; new skylights & new windows.Details
horizontal rear addition: 5'x8" @ basement & new deck above additional 1/f; vertical addition: 8'-6" from midpoint of (e) roo fto midpoint of new roof; new bedroom & new baths @ new 2nd flr lvl, new pool @ (e) basement lvl; (e) kitchen to be removed; new interior stairs; new skylights & new windows. | $120,000 |