Back to bathroom remodel contractors
Yao Star Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Sep 2026
- Last 24 months
- 33 permits filed
196 permits since 2000: 168 completed, 10 in progress, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
112 bathroom remodel permits: 96 completed, 6 in progress, 5 never finaled, 5 expired or cancelled. Typically 7 days from filing to permit and 174 days from permit to final inspection.
Showing the 100 most recent of 112.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | Completed final sign-off Sep 2026 | 227 Cordova St | bathroom remodel on 2nd floor. tub to shower conversion.Details
bathroom remodel on 2nd floor. tub to shower conversion. | $10,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 1883 31st Av | remodel 1 bathroom and 1 kitchen at 2nd floor. replace 2 new vinyl windows in front of house. replace 3 windows and one siding door at back side of the buildingDetails
remodel 1 bathroom and 1 kitchen at 2nd floor. replace 2 new vinyl windows in front of house. replace 3 windows and one siding door at back side of the building | $45,000 |
| May 22, 2026 | In progress issued Jun 2026 | 1350 23rd Av | revision to 2025121115953, revise foundation detail. change master bath and closet layout at gr floor. no added space. revise rear patio.Details
revision to 2025121115953, revise foundation detail. change master bath and closet layout at gr floor. no added space. revise rear patio. | |
| Apr 2, 2026 | Completed final sign-off Aug 2026 | 1670 26th Av | remodel kitchen and bathroom. at 2nd floor, replace 2 windows (vinyl) in front of house, facing the street, upgrade 2nd floor electrical wires, replace 1 window in bathroom, not facing street.Details
remodel kitchen and bathroom. at 2nd floor, replace 2 windows (vinyl) in front of house, facing the street, upgrade 2nd floor electrical wires, replace 1 window in bathroom, not facing street. | $36,000 |
| Jan 20, 2026 | In progress issued Feb 2026 | 1647 24th Av | 1st fl: infill at rear. add 2 baths, laundry room, 2 bedroom and family room. 2nd fl: remodel kitchen and bath. add 1.5 bath, reconfigure interior stairs. replace front windows with vinyl windows.Details
1st fl: infill at rear. add 2 baths, laundry room, 2 bedroom and family room. 2nd fl: remodel kitchen and bath. add 1.5 bath, reconfigure interior stairs. replace front windows with vinyl windows. | $320,000 |
| Dec 31, 2025 | Completed final sign-off Jul 2026 | 1942 24th Av | 3/f: add 2 bathrooms in (e) bathroom, no other work performed.Details
3/f: add 2 bathrooms in (e) bathroom, no other work performed. | $60,000 |
| Dec 26, 2025 | Completed final sign-off Feb 2026 | 430 27th Av | 2/f: apt 1: new bedroom and bathroom. 3/f: apt 3: new bedroom and bathroom.Details
2/f: apt 1: new bedroom and bathroom. 3/f: apt 3: new bedroom and bathroom. | $60,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 1350 23rd Av | interior renovation: 1st fl - convert storage space into master bedroom, master bath & family room. total added habitable area: 480 sf. 2 new windows and 1 door at rear. no work on 2nd flDetails
interior renovation: 1st fl - convert storage space into master bedroom, master bath & family room. total added habitable area: 480 sf. 2 new windows and 1 door at rear. no work on 2nd fl | $100,000 |
| Sep 3, 2025 | In progress issued Oct 2025 | 2519 32nd Av | interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cielingDetails
interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cieling | $400,000 |
| Aug 28, 2025 | In progress issued Oct 2025 | 1318 31st Av | 1/f: 2 new bedrooms, 1 bathroom with shower, wet bar, no other work performed.Details
1/f: 2 new bedrooms, 1 bathroom with shower, wet bar, no other work performed. | $110,000 |
| Jul 23, 2025 | Completed final sign-off Apr 2026 | 238 Hamilton St | remodel kitchen and 1 bathroom at 2nd fl. replace front 2 windows, 6 windows (2 in the backyard and 4 in the middle porch) replace around 500 sqft. sheet rck for living room dining room and two bedrooms/hallway install insulaltion for ceiling and wall (no structural wall change)Details
remodel kitchen and 1 bathroom at 2nd fl. replace front 2 windows, 6 windows (2 in the backyard and 4 in the middle porch) replace around 500 sqft. sheet rck for living room dining room and two bedrooms/hallway install insulaltion for ceiling and wall (no structural wall change) | $80,000 |
| Jul 1, 2025 | Completed final sign-off Jan 2026 | 238 Hamilton St | convert 1/f garage space into living space (708 sq.ft) - one family room with wetbar, one bathroom, one bedroom and a media room. relocate washer/dryer, water heater and furnance. add one new furnance for new living space.Details
convert 1/f garage space into living space (708 sq.ft) - one family room with wetbar, one bathroom, one bedroom and a media room. relocate washer/dryer, water heater and furnance. add one new furnance for new living space. | $180,000 |
| Jun 20, 2025 | Completed final sign-off Jul 2025 | 741 Edinburgh St | replace new cabinets, counter top, sink and the hardwood floor at the kitchen. replace new tiles, tub, faucet, new vanity, new toilet on 2nd floor bathroom. replace new electrical wires on 2nd floor. comply with #202539159. construct to get start work inspection.Details
replace new cabinets, counter top, sink and the hardwood floor at the kitchen. replace new tiles, tub, faucet, new vanity, new toilet on 2nd floor bathroom. replace new electrical wires on 2nd floor. comply with #202539159. construct to get start work inspection. | $25,000 |
| Apr 24, 2025 | Completed final sign-off Jun 2025 | 2550 22nd Av | 3/f - bathroom remodel in kindDetails
3/f - bathroom remodel in kind | $30,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2025 | 1678 23rd Av | comply w/ complaint #202536511:(1)replace cabinets, new countertop & new floor for the kitchen. install (n) electric system for kitchen. (2)replace two vanities and two toilets in two bathrooms. replace floor tile at hallway bathroom. replace 2 (n) windows in kitchen, in kind in same openingsDetails
comply w/ complaint #202536511:(1)replace cabinets, new countertop & new floor for the kitchen. install (n) electric system for kitchen. (2)replace two vanities and two toilets in two bathrooms. replace floor tile at hallway bathroom. replace 2 (n) windows in kitchen, in kind in same openings | $30,000 |
| Feb 28, 2025 | Expired or cancelled expired Oct 2026 | 1207 30th Av | 1st floor: reconfigure e) bedroom. relocate existing bathroom. family and laundry, and new wetbar. 2nd floor:remodel e) bathroom. replace front stairs in kind. stair treds to be replaced in kind with brick as per photos - google.Details
1st floor: reconfigure e) bedroom. relocate existing bathroom. family and laundry, and new wetbar. 2nd floor:remodel e) bathroom. replace front stairs in kind. stair treds to be replaced in kind with brick as per photos - google. | $60,000 |
| Dec 16, 2024 | Completed final sign-off Jul 2025 | 1036 Munich St | construct one bedroom, one full bath room, media room, storage rm install wet bar & convert (e) storage room to office, all work at g/fDetails
construct one bedroom, one full bath room, media room, storage rm install wet bar & convert (e) storage room to office, all work at g/f | $189,000 |
| Dec 12, 2024 | Completed final sign-off Jul 2025 | 1036 Munich St | kitchen and 1-bathroom remodel @ 2/f, like for like, no wall demolition or construction, no change in plumbing fixture count.Details
kitchen and 1-bathroom remodel @ 2/f, like for like, no wall demolition or construction, no change in plumbing fixture count. | $20,000 |
| Oct 22, 2024 | Completed final sign-off Dec 2025 | 238 Louisburg St | 1/f: new bedroom, bathroom and media room. replace mech in-kind.Details
1/f: new bedroom, bathroom and media room. replace mech in-kind. | $104,000 |
| Oct 16, 2024 | Completed final sign-off Dec 2025 | 773 46th Av | 2nd fl: relocate kitchen, dining & bathroom. add (1) bathroom & remodel bedrooms per planDetails
2nd fl: relocate kitchen, dining & bathroom. add (1) bathroom & remodel bedrooms per plan | $63,000 |
| Sep 4, 2024 | Completed final sign-off Apr 2025 | 2169 26th Av | remodel 2 full bathroom and 1 half bathroom at 2nd floor. replace 1500 sqft of hardie siding at back of the house. in kind.Details
remodel 2 full bathroom and 1 half bathroom at 2nd floor. replace 1500 sqft of hardie siding at back of the house. in kind. | $50,000 |
| Jul 2, 2024 | Completed final sign-off Dec 2024 | 1463 Funston Av | remodel (1) kitchen. (1) half bathroom at 2/f. remodel (2) full bathrooms at 3rd floor. upgrade whole house electric work and upgrade to 200 amp service. remodel laundry room at 2/f. bathrooms shall include exhaust fans. kitchen shall include hood.Details
remodel (1) kitchen. (1) half bathroom at 2/f. remodel (2) full bathrooms at 3rd floor. upgrade whole house electric work and upgrade to 200 amp service. remodel laundry room at 2/f. bathrooms shall include exhaust fans. kitchen shall include hood. | $60,000 |
| May 9, 2024 | Completed final sign-off Dec 2025 | 238 Louisburg St | 2/f: remodel 1 kitchen & 1 bathroom, in-kind. ; replace whole drywall with 5/8in type-x gypsum board.Details
2/f: remodel 1 kitchen & 1 bathroom, in-kind. ; replace whole drywall with 5/8in type-x gypsum board. | $68,000 |
| Apr 22, 2024 | Completed final sign-off May 2024 | 318 Chicago Wy | remove the kitchen cabinets and countertops, floor tiles, remove the bathroom tile and tub. change tube shower pan. replace new vanity at 2nd fl. comply with complaint 202422347. install new cabinets and counter top at the kitchen.Details
remove the kitchen cabinets and countertops, floor tiles, remove the bathroom tile and tub. change tube shower pan. replace new vanity at 2nd fl. comply with complaint 202422347. install new cabinets and counter top at the kitchen. | $20,000 |
| Apr 15, 2024 | Completed final sign-off May 2024 | 183 21st Av | comply complaint #202420951: repair light, install electric heater, replace cracked glazing, remove security grates bedroom, install shutoff valve for stove, reinstall water heater per plumbing code, repair window sash, install new fan bathroom. comply complaint #202418086,202421394Details
comply complaint #202420951: repair light, install electric heater, replace cracked glazing, remove security grates bedroom, install shutoff valve for stove, reinstall water heater per plumbing code, repair window sash, install new fan bathroom. comply complaint #202418086,202421394 | $4,500 |
| Apr 15, 2024 | Completed final sign-off Jul 2024 | 1962 33rd Av | remodel kitchen. bathroom at second floor in kind. replace front (2) new windows and 1 window. 1 sliding door at back side. replace new furnace in garage. and upgrade 125 amp electric services.Details
remodel kitchen. bathroom at second floor in kind. replace front (2) new windows and 1 window. 1 sliding door at back side. replace new furnace in garage. and upgrade 125 amp electric services. | $25,000 |
| Apr 11, 2024 | Completed final sign-off Apr 2025 | 2169 26th Av | renovate kitchen on 2nd floor. replace 18 windows. convert partial garage space to 1 office, 1 gym, and 2 bathrooms. aprox 716 sq ft. front window to be in kindDetails
renovate kitchen on 2nd floor. replace 18 windows. convert partial garage space to 1 office, 1 gym, and 2 bathrooms. aprox 716 sq ft. front window to be in kind | $80,000 |
| Feb 1, 2024 | Completed final sign-off May 2024 | 183 21st Av | comply complaint#: 202418086. repair fireplace. repair. damaged ceiling repair damaged walls. repair bathroom ventilation. repair floor covering. reapir 3'x3' damaged concrete. repair windows and light switch. install carbon monoxide. smoke detectors.Details
comply complaint#: 202418086. repair fireplace. repair. damaged ceiling repair damaged walls. repair bathroom ventilation. repair floor covering. reapir 3'x3' damaged concrete. repair windows and light switch. install carbon monoxide. smoke detectors. | $5,000 |
| Aug 7, 2023 | Completed final sign-off Apr 2025 | 1751 16th Av | revision to 202103307515. reduce expansion from 776 sf to 377 sf. small expansion 377 sf to (e) sfr. 1 master bedroom, bath & closet. renovate partial garage to gym. (n) rear roof deck over (n) master bedroom suite, (n) balcony @ (n) master bedroomDetails
revision to 202103307515. reduce expansion from 776 sf to 377 sf. small expansion 377 sf to (e) sfr. 1 master bedroom, bath & closet. renovate partial garage to gym. (n) rear roof deck over (n) master bedroom suite, (n) balcony @ (n) master bedroom | |
| Jun 20, 2023 | Completed final sign-off Apr 2024 | 2606 39th Av | 1/f: new bedroom, media room, bathroom and bar. relocate washer/dryer and mech per plans.Details
1/f: new bedroom, media room, bathroom and bar. relocate washer/dryer and mech per plans. | $105,000 |
| Apr 21, 2023 | Completed final sign-off Sep 2023 | 3040 22nd Av | remodel kitchen and bathroom. replace new 5/8 sheetrock at 2nd floor. upgrade whole house electric workDetails
remodel kitchen and bathroom. replace new 5/8 sheetrock at 2nd floor. upgrade whole house electric work | $60,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2026 | 1201 43rd Av | legalize 2nd fl un-permitted rear bathroom addition in connection w/ adu pa #202212168535. in response to dbi comment for a ground fl adu permit. a 75 sqft 2nd fl rear bathroom appears to be constructed between 2004-2007 & w/o permit records. this is a hybrid proj w/ needed aduDetails
legalize 2nd fl un-permitted rear bathroom addition in connection w/ adu pa #202212168535. in response to dbi comment for a ground fl adu permit. a 75 sqft 2nd fl rear bathroom appears to be constructed between 2004-2007 & w/o permit records. this is a hybrid proj w/ needed adu | $50,000 |
| Jan 31, 2023 | Completed final sign-off Jul 2023 | 1052 Noe St | 1052 noe st: add 1 full bathroom.Details
1052 noe st: add 1 full bathroom. | $25,000 |
| Aug 26, 2022 | Completed final sign-off May 2023 | 2728 35th Av | 2/f: remodel 1 kitchen and remodel (e) bathroom. no other work pefformed.Details
2/f: remodel 1 kitchen and remodel (e) bathroom. no other work pefformed. | $32,000 |
| Aug 25, 2022 | Completed final sign-off Apr 2025 | 2239 43rd Av | compliance w/ compliant notice 202290967. proposed interior remodeling of (e) sfh: 1st fl conversion of storage space @ 1st fl to habitable space to incorporate bedrooms & bathrooms all with envelope. 2nd flor modi of 2nd fl remodel kitchen and bath. additon of new deck @ and flr to provide accessDetails
compliance w/ compliant notice 202290967. proposed interior remodeling of (e) sfh: 1st fl conversion of storage space @ 1st fl to habitable space to incorporate bedrooms & bathrooms all with envelope. 2nd flor modi of 2nd fl remodel kitchen and bath. additon of new deck @ and flr to provide access | $250,000 |
| Aug 2, 2022 | Completed final sign-off Dec 2022 | 2231 16th Av | convert ground floor to storage, (1) bedroom & media room. legalize (e) bath on g/f (no wall change). no work on 2/f.Details
convert ground floor to storage, (1) bedroom & media room. legalize (e) bath on g/f (no wall change). no work on 2/f. | $20,000 |
| Jun 29, 2022 | Completed final sign-off Dec 2022 | 2217 16th Av | revision to pa# 202110180610. add ground floor bedroom, bathroom, media room + kitchenette (2 burner cooktop, no oven) within (e) footprint. add 2 windows to rear facade. not visible from street.Details
revision to pa# 202110180610. add ground floor bedroom, bathroom, media room + kitchenette (2 burner cooktop, no oven) within (e) footprint. add 2 windows to rear facade. not visible from street. | $71,000 |
| Mar 2, 2022 | Completed final sign-off Mar 2022 | 1738 39th Av | replace new tile. new toilet. new shower at ground floor bathroom. no change to layout or walls. comply complaint # 202286688Details
replace new tile. new toilet. new shower at ground floor bathroom. no change to layout or walls. comply complaint # 202286688 | $5,000 |
| Jan 21, 2022 | Completed final sign-off Jun 2022 | 163 Whittier St | to comply with nov 202182937, reconfigure existing bathroom on ground fl; convert (e) playroom to bedroom and (e) playroom; add wet bar; 2nd fl - remodel kitchen and reconfigure (e) bathroom and add (n) half bath; no new window openings under this permitDetails
to comply with nov 202182937, reconfigure existing bathroom on ground fl; convert (e) playroom to bedroom and (e) playroom; add wet bar; 2nd fl - remodel kitchen and reconfigure (e) bathroom and add (n) half bath; no new window openings under this permit | $46,000 |
| Dec 21, 2021 | Never finaled issued Feb 2022, no final | 1643 11th Av | 1st fl: re-configure (e) interior space 2 new bedrooms, 2 bathrooms, family rm, laundry and storage area. 2nd fl: re-configure bathrooms, add new bathrooms. kitchen remodel in-kind, infill (e) lightwell and (e) stair , build new staircase.Details
1st fl: re-configure (e) interior space 2 new bedrooms, 2 bathrooms, family rm, laundry and storage area. 2nd fl: re-configure bathrooms, add new bathrooms. kitchen remodel in-kind, infill (e) lightwell and (e) stair , build new staircase. | $110,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2022 | 2217 16th Av | interior remodel, kitchen and bath remodel, add full bath, remodel interior stair, no expansion of bldg envelope or work at front facade visible from street.Details
interior remodel, kitchen and bath remodel, add full bath, remodel interior stair, no expansion of bldg envelope or work at front facade visible from street. | $120,000 |
| Oct 7, 2021 | Completed final sign-off Dec 2021 | 2701 Lincoln Wy | remodel 2 full bathroom at 3rd floor. in kind. ea bathroom has (1) shower, (1) vanity, (1) toilet.Details
remodel 2 full bathroom at 3rd floor. in kind. ea bathroom has (1) shower, (1) vanity, (1) toilet. | $30,000 |
| Jul 29, 2021 | Completed final sign-off Aug 2022 | 2421 Clement St | new ada bath in commercial unit; change of use from retail to ice cream shop. new plumbing, mop and prep sinks. (e) hvac system to remainDetails
new ada bath in commercial unit; change of use from retail to ice cream shop. new plumbing, mop and prep sinks. (e) hvac system to remain | $50,000 |
| Jun 4, 2021 | Completed final sign-off Aug 2022 | 2295 25th Av | 1st floor: add 2 bedrooms, 2 full baths, office and family. 2nd floor: remodel kitchen and bath. add bedroom and full bath. replace all window in kind.Details
1st floor: add 2 bedrooms, 2 full baths, office and family. 2nd floor: remodel kitchen and bath. add bedroom and full bath. replace all window in kind. | $140,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 579 Naples St | 1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer.Details
1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer. | $98,000 |
| Mar 30, 2021 | Completed final sign-off Apr 2025 | 1751 16th Av | addition of 1 bedroom, expansion of 1 bedroom and garage/hall, addition of 1 bath, (ground floor) 1 gym (basement) and backyard decksDetails
addition of 1 bedroom, expansion of 1 bedroom and garage/hall, addition of 1 bath, (ground floor) 1 gym (basement) and backyard decks | $100,000 |
| Mar 4, 2021 | Completed final sign-off Aug 2024 | 1274 22nd Av | add second unit per density rule on 1st floor: 1)infill under the extg structure at rear. 2)infill the south side lightwell on 1st floor. 3)add living/dining room, bedroom, office, kitchen, entertainment and one 3 fixture bathroom. 2nd floor: 4)remove wall between living room and dining room.Details
add second unit per density rule on 1st floor: 1)infill under the extg structure at rear. 2)infill the south side lightwell on 1st floor. 3)add living/dining room, bedroom, office, kitchen, entertainment and one 3 fixture bathroom. 2nd floor: 4)remove wall between living room and dining room. | $20,000 |
| Jan 19, 2021 | Completed final sign-off Mar 2021 | 1415 21st Av | remodel kithcen, replace cabinets, fixtures,couner top. remodel bath at second floor,new tile, new toilet and vanity.Details
remodel kithcen, replace cabinets, fixtures,couner top. remodel bath at second floor,new tile, new toilet and vanity. | $30,000 |
| Nov 13, 2020 | Expired or cancelled expired Apr 2024 | 1983 Quesada Av | 2/f: add 1 (n) bathroom on 2/f in (e) closet of bedroom.Details
2/f: add 1 (n) bathroom on 2/f in (e) closet of bedroom. | $17,600 |
| Nov 12, 2020 | Completed final sign-off Apr 2023 | 590 27th Av | construct 2 bedroom, 1 bathroom, & laundry at g/f. remodel (e) bathroom, relocate (e) kitchen. add 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor. construct new dek at rear of bldg (18' x 4'6"). in-fill (e) lighwell & install 4 skylights.Details
construct 2 bedroom, 1 bathroom, & laundry at g/f. remodel (e) bathroom, relocate (e) kitchen. add 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor. construct new dek at rear of bldg (18' x 4'6"). in-fill (e) lighwell & install 4 skylights. | $120,000 |
| Nov 4, 2020 | Completed final sign-off Jun 2021 | 2601 31st Av | remodel (e) kitchen, bathroom, and add one new bathroom at 2nd floor.Details
remodel (e) kitchen, bathroom, and add one new bathroom at 2nd floor. | $35,000 |
| Sep 5, 2020 | Completed final sign-off May 2021 | 25 Ottawa Av | ground floor relocate half bath and add new bath, bedroom, office and media room. 2nd floor: rearrange bathroom and add new bathroom, remodel kitchen per plan. no new opening proposed.Details
ground floor relocate half bath and add new bath, bedroom, office and media room. 2nd floor: rearrange bathroom and add new bathroom, remodel kitchen per plan. no new opening proposed. | $90,000 |
| Aug 25, 2020 | Completed final sign-off Nov 2020 | 1534 27th Av | remodel bathroom ata 2nd fl. repair inside house, comply with complain # 202044533Details
remodel bathroom ata 2nd fl. repair inside house, comply with complain # 202044533 | $15,000 |
| Aug 12, 2020 | Completed final sign-off Dec 2020 | 1652 Greenwich St | 2nd flr unit_remodel one kitchen and 1.5 bathroom in kind. remodel laudry area. all work in kind.Details
2nd flr unit_remodel one kitchen and 1.5 bathroom in kind. remodel laudry area. all work in kind. | $40,000 |
| Mar 13, 2020 | Completed final sign-off Jun 2021 | 2601 31st Av | construct 1 bedroom, 1 full bath, family room, convert (e) family room to one bedroom & rearrange (e) bath room. all work at ground floor.Details
construct 1 bedroom, 1 full bath, family room, convert (e) family room to one bedroom & rearrange (e) bath room. all work at ground floor. | $80,000 |
| Mar 4, 2020 | Completed final sign-off Oct 2021 | 2623 22nd Av | interior renovation 1st fl - add 2 bedrooms, 2 (3) fixture bathrooms, add 1 entertainment; 2nd fl - relocate (e) kitchen & bathroom, add 1 office and 1 (3) fixture bathroom; eliminate (e) lightwell.Details
interior renovation 1st fl - add 2 bedrooms, 2 (3) fixture bathrooms, add 1 entertainment; 2nd fl - relocate (e) kitchen & bathroom, add 1 office and 1 (3) fixture bathroom; eliminate (e) lightwell. | $50,000 |
| Jan 15, 2020 | Completed final sign-off Jul 2020 | 600 Felton St | remodel 1 bath 2nd fl comply with 202009591 4.5x8.5Details
remodel 1 bath 2nd fl comply with 202009591 4.5x8.5 | $10,000 |
| Jan 15, 2020 | Expired or cancelled expired Mar 2021 | 201 South Hill Bl | remodel 1 full bath at 2nd fl 5x8Details
remodel 1 full bath at 2nd fl 5x8 | $15,000 |
| Dec 27, 2019 | Completed final sign-off Jul 2020 | 600 Felton St | 2/f: demo wall between (e) living room & kitchen. demo (e) fireplace. construct (n) bathroom for (e) master bedroom, n 1/2 bath (n) elec. fireplace in (e) dining room. g/f: construction 3 new bedrooms, 2 (n) bathrooms, (n) rec room, relocate (e) furnace & w/h, enlarge wndw in (n) bed 3 & garage.Details
2/f: demo wall between (e) living room & kitchen. demo (e) fireplace. construct (n) bathroom for (e) master bedroom, n 1/2 bath (n) elec. fireplace in (e) dining room. g/f: construction 3 new bedrooms, 2 (n) bathrooms, (n) rec room, relocate (e) furnace & w/h, enlarge wndw in (n) bed 3 & garage. | $65,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 723 43rd Av | 1)convert 2 bedroom, 2 bathroom, and media room at ground floor. 2)remodel extg kitchen, & add one bathroom at 2nd floor. 3)new deck at rear of bldg. (size approx 9'-6x 16'-8")Details
1)convert 2 bedroom, 2 bathroom, and media room at ground floor. 2)remodel extg kitchen, & add one bathroom at 2nd floor. 3)new deck at rear of bldg. (size approx 9'-6x 16'-8") | $168,000 |
| Oct 24, 2019 | Completed final sign-off Mar 2021 | 570 Moscow St | residential interior remodel of single family residence, ground floor remodel of habitable space for total of 2 bed, 1 laundry, 1 media, and 2 bath at 1st fl. remodel of 2nd fl. new rear deck at rear of (e) bldg front window replacement in-kind to use wood interior -alum cladDetails
residential interior remodel of single family residence, ground floor remodel of habitable space for total of 2 bed, 1 laundry, 1 media, and 2 bath at 1st fl. remodel of 2nd fl. new rear deck at rear of (e) bldg front window replacement in-kind to use wood interior -alum clad | $200,000 |
| Jul 1, 2019 | Completed final sign-off Oct 2019 | 426 Sweeny St | 1st flr - add 2 bedrooms, 2 baths, office and family room. 2nd floor - relocate kitchen and add 1 full bathDetails
1st flr - add 2 bedrooms, 2 baths, office and family room. 2nd floor - relocate kitchen and add 1 full bath | $80,000 |
| Jun 17, 2019 | Completed final sign-off Oct 2019 | 961 Athens St | remodel 2 full bathrooms (5x8), kitchen (10x11) at 2nd floor. replace new 5/8 type x sheetrock. for bedroom dining room., fam room about 1500 sq ftDetails
remodel 2 full bathrooms (5x8), kitchen (10x11) at 2nd floor. replace new 5/8 type x sheetrock. for bedroom dining room., fam room about 1500 sq ft | $40,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 1663 37th Av | construct 2 bedrooms, 2 full bathrooms & half bathroom @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & re-built (e) interior staircase from 2nd fl down to ground fl & upgrade partial ceiling joists at 2nd fl; construct new deck w/staircase at rear of bldg (size 17'x12')Details
construct 2 bedrooms, 2 full bathrooms & half bathroom @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & re-built (e) interior staircase from 2nd fl down to ground fl & upgrade partial ceiling joists at 2nd fl; construct new deck w/staircase at rear of bldg (size 17'x12') | $125,000 |
| Mar 5, 2019 | Completed final sign-off Jan 2021 | 2278 29th Av | construct 2 bedrooms, 2 full bathrooms & media room @ ground fl; add 2 new bathrooms & re-build (e) interior staircase 2nd fl down to ground floor. construct new deck w/staircase @ rear of bldg (size approx 17'x12')Details
construct 2 bedrooms, 2 full bathrooms & media room @ ground fl; add 2 new bathrooms & re-build (e) interior staircase 2nd fl down to ground floor. construct new deck w/staircase @ rear of bldg (size approx 17'x12') | $98,000 |
| Jan 18, 2019 | Completed final sign-off Jun 2019 | 380 Princeton St | ground floor renovation including convert (e) space behind garage into 1 bedroom, a family room and 2 bathsDetails
ground floor renovation including convert (e) space behind garage into 1 bedroom, a family room and 2 baths | $20,000 |
| Jan 16, 2019 | Completed final sign-off Jan 2021 | 2278 29th Av | remodel kitchen (10x12) a full bathroom (5x8) replace new sheetrock 2000 sq ft for bedroom, 1 dining room 1, living room at 2nd floor (all interior wall)Details
remodel kitchen (10x12) a full bathroom (5x8) replace new sheetrock 2000 sq ft for bedroom, 1 dining room 1, living room at 2nd floor (all interior wall) | $35,000 |
| Nov 29, 2018 | Completed final sign-off May 2019 | 2400 41st Av | remodel kitchen and 1 full bathroom at second floorDetails
remodel kitchen and 1 full bathroom at second floor | $20,000 |
| Sep 27, 2018 | Completed final sign-off Jun 2019 | 1838 33rd Av | remodel existing residence - add bathroom on 1st and 2nd fl. legalize existing bedroom & bath on 1st fl. new deck & stairs at rear yard. replace existing 2 front windows with wood clad aluminum. same sizeDetails
remodel existing residence - add bathroom on 1st and 2nd fl. legalize existing bedroom & bath on 1st fl. new deck & stairs at rear yard. replace existing 2 front windows with wood clad aluminum. same size | $40,000 |
| Aug 8, 2018 | Completed final sign-off Aug 2019 | 255 Tingley St | ground floor. add 1 family room, 2 bedrooms, 1 bathroomDetails
ground floor. add 1 family room, 2 bedrooms, 1 bathroom | $40,000 |
| Jun 27, 2018 | Completed final sign-off Feb 2019 | 1711 Mckinnon Av | convert from 1 unit to 2 unit remodel(e)kit bath rm, add one new bath rm, replace (e) sheetrk w/new & rewire elect lgt at grndd flr. relocate (e) kitn, bathrm, add one new bathrm, replace (e) sheetrk w/new & rewire elect, lgt at 2nd floor. add one bathrm-3rd flr, construct 2 dormers & rebuild stairsDetails
convert from 1 unit to 2 unit remodel(e)kit bath rm, add one new bath rm, replace (e) sheetrk w/new & rewire elect lgt at grndd flr. relocate (e) kitn, bathrm, add one new bathrm, replace (e) sheetrk w/new & rewire elect, lgt at 2nd floor. add one bathrm-3rd flr, construct 2 dormers & rebuild stairs | $120,000 |
| Jun 8, 2018 | Completed final sign-off Oct 2018 | 375 Los Palmos Dr | new bedroom, family room, and bathroom at 1st fl. relocate (e) laundry location on g/f.Details
new bedroom, family room, and bathroom at 1st fl. relocate (e) laundry location on g/f. | $40,000 |
| May 23, 2018 | Completed final sign-off Oct 2018 | 1571 22nd Av | 1st floor; add 1 bedroom, 2 bathrooms and sunroom. 2nd floor: add 1 bathroom, 1 closet, add new deck on rear of the buildingDetails
1st floor; add 1 bedroom, 2 bathrooms and sunroom. 2nd floor: add 1 bathroom, 1 closet, add new deck on rear of the building | $8,000 |
| May 10, 2018 | Completed final sign-off Aug 2019 | 255 Tingley St | remodel 2 bathrooms, 1 kitchen. replace new sheetrock for 3 bedrooms (100 sf max), 1 living room, 1 dining room at second floor; n/a maherDetails
remodel 2 bathrooms, 1 kitchen. replace new sheetrock for 3 bedrooms (100 sf max), 1 living room, 1 dining room at second floor; n/a maher | $28,000 |
| May 10, 2018 | Completed final sign-off Jun 2019 | 1838 33rd Av | remodel kitchen, 2 bathrooms at second floor. replace new sheetrock for dining room, living room (100 sq.ft. max), 3 bedrooms at second floor.Details
remodel kitchen, 2 bathrooms at second floor. replace new sheetrock for dining room, living room (100 sq.ft. max), 3 bedrooms at second floor. | $28,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2018 | 568 41st Av | comply with n.o.v 201832682. kitchen and bathroom remodel. replace tile at bathroom floor.Details
comply with n.o.v 201832682. kitchen and bathroom remodel. replace tile at bathroom floor. | $6,000 |
| Jan 11, 2018 | Completed final sign-off Oct 2018 | 239 28th Av | construct (n) bathroom, family room, storage at ground floor. open (n) window at front of basement/ground level. enlarge (e) front door. (n) window at rear basementDetails
construct (n) bathroom, family room, storage at ground floor. open (n) window at front of basement/ground level. enlarge (e) front door. (n) window at rear basement | $30,000 |
| Dec 22, 2017 | Completed final sign-off Oct 2018 | 239 28th Av | convert extg closet to new bathroom at 2nd floor.Details
convert extg closet to new bathroom at 2nd floor. | $8,000 |
| Dec 15, 2017 | Completed final sign-off Jul 2020 | 2463 19th Av | legalize 1st fl as 2nd unit including 3 beds,3 full baths,kitchen, dining and living.remodel kitchen and bath, add 2 full bath, relocate stairs, remove walls & add flat skylights on 2nd fl. enlarge garage door. replace w/aluminum clad wood windows at front & side,vinyl winddows at rear.Details
legalize 1st fl as 2nd unit including 3 beds,3 full baths,kitchen, dining and living.remodel kitchen and bath, add 2 full bath, relocate stairs, remove walls & add flat skylights on 2nd fl. enlarge garage door. replace w/aluminum clad wood windows at front & side,vinyl winddows at rear. | $120,000 |
| Dec 1, 2017 | Completed final sign-off May 2018 | 2424 Quintara St | add 2 bedrooms, an office, 3 full bathrooms and a hallway on 1/f.Details
add 2 bedrooms, an office, 3 full bathrooms and a hallway on 1/f. | $70,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2018 | 926 Capitol Av | add 1 bedroom, 2 bath, 1 laundry rm, 1 family rm at 1st fl. add deck at rear.Details
add 1 bedroom, 2 bath, 1 laundry rm, 1 family rm at 1st fl. add deck at rear. | $30,000 |
| Nov 13, 2017 | Completed final sign-off Apr 2018 | 212 Howth St | add 2 bedrooms, 1 bathroom on first floorDetails
add 2 bedrooms, 1 bathroom on first floor | $20,000 |
| Sep 28, 2017 | Completed final sign-off Mar 2019 | 1391 14th Av | new habitable space at ground floor (new family room, living room, full bathroom and half bath). lower existing slab approx 18" (30" max). underpinning of existing foundation required. rear facade alteration (2 windows and french door). maher n/a.Details
new habitable space at ground floor (new family room, living room, full bathroom and half bath). lower existing slab approx 18" (30" max). underpinning of existing foundation required. rear facade alteration (2 windows and french door). maher n/a. | $75,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 250 Burrows St | remodel on 2nd floor - add 1 new bathroom & 1/2 bathroom, remodel kitchen & new partition wall, enlarge computer room w/closet.Details
remodel on 2nd floor - add 1 new bathroom & 1/2 bathroom, remodel kitchen & new partition wall, enlarge computer room w/closet. | $30,000 |
| Aug 8, 2017 | Never finaled issued Aug 2017, no final | 250 Burrows St | remodel (1) full bathroom, (1) powder room, (1) kitchenDetails
remodel (1) full bathroom, (1) powder room, (1) kitchen | $32,000 |
| Jul 13, 2017 | Completed final sign-off Dec 2017 | 208 Bowdoin St | internal remodel on 1st fl. add (1) bedroom, (1) full bath, and (1) family rm.Details
internal remodel on 1st fl. add (1) bedroom, (1) full bath, and (1) family rm. | $30,000 |
| Jul 10, 2017 | Completed final sign-off Aug 2025 | 2591 25th Av | vertical 3rd story additio with two bathrooms.Details
vertical 3rd story additio with two bathrooms. | $120,000 |
| Apr 28, 2017 | Completed final sign-off Jul 2017 | 240 Holyoke St | interior remodeling 0 2nd floor - add 1 bathroom, kitchen remodel; 1st floor - add 1 bathrooms, 2 bedrooms, family room and laundry room.Details
interior remodeling 0 2nd floor - add 1 bathroom, kitchen remodel; 1st floor - add 1 bathrooms, 2 bedrooms, family room and laundry room. | $40,000 |
| Mar 2, 2017 | Completed final sign-off Apr 2018 | 212 Howth St | add 2 each dormer windows, 1 each bathroom on attic. 1 each half bathroom on 1st floor.Details
add 2 each dormer windows, 1 each bathroom on attic. 1 each half bathroom on 1st floor. | $20,000 |
| Feb 7, 2017 | Completed final sign-off Oct 2017 | 473 11th Av | add 2 bedrooms, 2 bathrooms, 1 family room & mud room on 1st floor per plan; kitchen remodel and add a full bath on 2nd floorDetails
add 2 bedrooms, 2 bathrooms, 1 family room & mud room on 1st floor per plan; kitchen remodel and add a full bath on 2nd floor | $50,000 |
| Dec 14, 2016 | Expired or cancelled expired Mar 2018 | 212 Howth St | remodel 2 full bathroom, kitchen, 3 bedrooms, one dining room, one family room at 2nd floor. replace new windows at back of building.Details
remodel 2 full bathroom, kitchen, 3 bedrooms, one dining room, one family room at 2nd floor. replace new windows at back of building. | $30,000 |
| Oct 13, 2016 | Completed final sign-off Jan 2017 | 1440 09th Av | remodel 2 full bathroom. 1 kitchen at 2/f. replace new 5/8in sheetrock and change 8 windows at rear side.Details
remodel 2 full bathroom. 1 kitchen at 2/f. replace new 5/8in sheetrock and change 8 windows at rear side. | $35,000 |
| Sep 30, 2016 | Completed final sign-off Nov 2016 | 1236 Athens St | interior remodel on 1st floor. add 1 each bathroom and 2 each bedrooms and 1 each family room and one each laundry room.Details
interior remodel on 1st floor. add 1 each bathroom and 2 each bedrooms and 1 each family room and one each laundry room. | $30,000 |
| Sep 23, 2016 | Completed final sign-off Jun 2017 | 5133 Geary Bl | remodel 4 office, remodel 4 bathroom, replace pipes, replace electrical wire. replace sheet rock, and replace water heater furnace.Details
remodel 4 office, remodel 4 bathroom, replace pipes, replace electrical wire. replace sheet rock, and replace water heater furnace. | $95,000 |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 473 11th Av | remodel kitchen 2/f, replace (3) bedroom wall/sheetrock, change (10) windows rear building, remodel (1) full bath 2/f, new drywall to be 5/8" type "x" at all areas where removed/replaced.Details
remodel kitchen 2/f, replace (3) bedroom wall/sheetrock, change (10) windows rear building, remodel (1) full bath 2/f, new drywall to be 5/8" type "x" at all areas where removed/replaced. | $20,000 |
| Aug 18, 2016 | Completed final sign-off Mar 2017 | 1236 Athens St | remodel (1) full bathroom 2/f, replace (1) window rear buildingDetails
remodel (1) full bathroom 2/f, replace (1) window rear building | $10,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 435 Spruce St | remodel 1 bathroom and 1 half bathroom. remodel kitchen. change 10 windows at the rear side and the left side. paint the whole unit. no change on walls.Details
remodel 1 bathroom and 1 half bathroom. remodel kitchen. change 10 windows at the rear side and the left side. paint the whole unit. no change on walls. | $25,000 |
| Dec 18, 2015 | Completed final sign-off Mar 2016 | 326 29th Av | remodel 1 and 1/2 bathrooms at 3rd floor. install one new furnace for top floor and replace furnace for main floor and basement.Details
remodel 1 and 1/2 bathrooms at 3rd floor. install one new furnace for top floor and replace furnace for main floor and basement. | $15,000 |
| Sep 10, 2015 | Completed final sign-off Feb 2016 | 756 Valencia St | remodel kitchen, 3 full bathrooms at 2nd flDetails
remodel kitchen, 3 full bathrooms at 2nd fl | $47,000 |
| Aug 6, 2015 | Completed final sign-off Dec 2015 | 1830 Santiago St | remodel 2 full baths and half bath at 2nd floor. repair front stair - less than 50 percent replacement. no change in wall & opening layout. high efficancy lighting or controlled by manual on sensor and high eff. main lightDetails
remodel 2 full baths and half bath at 2nd floor. repair front stair - less than 50 percent replacement. no change in wall & opening layout. high efficancy lighting or controlled by manual on sensor and high eff. main light | $30,000 |