Back to bathroom remodel contractors
Yao Hui Liang
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Feb 2026
- Last 24 months
- 1 permit filed
48 permits since 2000: 44 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 27 completed, 1 expired or cancelled. Typically 15 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2024 | Completed final sign-off Nov 2024 | 420 17th Av | for address 420 17th avenue: remodel hallway bathroom with same location at 3rd floor hallway bathroomDetails
for address 420 17th avenue: remodel hallway bathroom with same location at 3rd floor hallway bathroom | $10,000 |
| Mar 13, 2023 | Completed final sign-off Jul 2023 | 241 Marietta Dr | in kind kitchen, (1) master bathroom and (1) hallway bathroom remodel.non structuralDetails
in kind kitchen, (1) master bathroom and (1) hallway bathroom remodel.non structural | $35,000 |
| Dec 30, 2022 | Completed final sign-off Apr 2024 | 1839 17th Av | construct 2 bedroom, 2 bathroom, & media room at g/f. relocate (e) kitchen, bathroom, add 2 bathroom, in-fill central patio & replace (e) sheet rock w/ new at 2/f. construct rear deck w/ staircase (18'x8').Details
construct 2 bedroom, 2 bathroom, & media room at g/f. relocate (e) kitchen, bathroom, add 2 bathroom, in-fill central patio & replace (e) sheet rock w/ new at 2/f. construct rear deck w/ staircase (18'x8'). | $274,000 |
| Feb 2, 2022 | Completed final sign-off Jun 2022 | 85 Forest Side Av | remodel kitchen and bathroom on 2nd floorDetails
remodel kitchen and bathroom on 2nd floor | $30,000 |
| Feb 2, 2022 | Expired or cancelled cancelled Feb 2026 | 163 Central Av | unit 3: remodel bathroom with same locationDetails
unit 3: remodel bathroom with same location | $10,000 |
| Nov 12, 2020 | Completed final sign-off Feb 2021 | 3740 Judah St | remodel (e) kitchen, bathroom, w/ new in kind at 2nd floor. repair (e) interior stair down to g/f in kind.Details
remodel (e) kitchen, bathroom, w/ new in kind at 2nd floor. repair (e) interior stair down to g/f in kind. | $38,000 |
| Oct 19, 2020 | Completed final sign-off Aug 2021 | 2583 29th Av | construct 2 bedrooms, 2 full bath, & family room at ground floor. remodel (e) kitchen, relocate (e) bathroom, add 1 new bathroom. rebuilt interior staircase down to ground floor & replace (e) sheet rock 2/ new at 2nd floor. construct new deck w/ staircase at rear of bldg (size approx 7.8' x16.2').Details
construct 2 bedrooms, 2 full bath, & family room at ground floor. remodel (e) kitchen, relocate (e) bathroom, add 1 new bathroom. rebuilt interior staircase down to ground floor & replace (e) sheet rock 2/ new at 2nd floor. construct new deck w/ staircase at rear of bldg (size approx 7.8' x16.2'). | $120,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2019 | 729 Grant Av | to comply with nov 201874061 & 201874201 ti to (e) retail space. upgrade 1 ada bathroom & new floor finishesDetails
to comply with nov 201874061 & 201874201 ti to (e) retail space. upgrade 1 ada bathroom & new floor finishes | $15,000 |
| Jan 19, 2018 | Completed final sign-off Jan 2018 | 729 Grant Av | repair/replace toilet sewer pip and repair bathroom light on ground floor.Details
repair/replace toilet sewer pip and repair bathroom light on ground floor. | $3,000 |
| Apr 24, 2017 | Completed final sign-off Jan 2018 | 3 09th Av | existing kitchen and bathroom to be remodeled. replace cabinets & fixture, re-finish electric & lighting. close off opening between bedroom and living room. maher naDetails
existing kitchen and bathroom to be remodeled. replace cabinets & fixture, re-finish electric & lighting. close off opening between bedroom and living room. maher na | $25,000 |
| Oct 7, 2016 | Completed final sign-off Jul 2017 | 1402 Broadway | remodel a bathroom and a kitchen. upgrade main meter 60 amp to 200 amp with 4 meter and replace an electrical new sub panelDetails
remodel a bathroom and a kitchen. upgrade main meter 60 amp to 200 amp with 4 meter and replace an electrical new sub panel | $30,000 |
| Sep 2, 2016 | Completed final sign-off Sep 2020 | 2522 38th Av | proposed horizontal addition @ rear of building. 2 bedrooms & 2 bathrooms in the addition. remodel (e) kitchen @ 2nd floor.Details
proposed horizontal addition @ rear of building. 2 bedrooms & 2 bathrooms in the addition. remodel (e) kitchen @ 2nd floor. | $120,000 |
| Feb 12, 2016 | Completed final sign-off May 2016 | 1619 York St | remodel kitchen & 1 bathroomDetails
remodel kitchen & 1 bathroom | $20,000 |
| Jul 21, 2015 | Completed final sign-off Nov 2015 | 3738 Judah St | construct 1 home office and half bath rm at gr flDetails
construct 1 home office and half bath rm at gr fl | $18,000 |
| May 21, 2015 | Completed final sign-off Feb 2016 | 343 Bacon St | legalize (e) bedroom, bathroom & family room. all work at ground floor.Details
legalize (e) bedroom, bathroom & family room. all work at ground floor. | $42,000 |
| Apr 20, 2015 | Completed final sign-off Jun 2015 | 3738 Judah St | remodel existing kitchen/bathroom at 3rd floor, replace counter, coutner top, sink & flooring.Details
remodel existing kitchen/bathroom at 3rd floor, replace counter, coutner top, sink & flooring. | $23,000 |
| Dec 22, 2014 | Completed final sign-off Sep 2015 | 4675 18th St | interior remodel of lower unit. selective demo of structural bearing wall, kitchen and interior finishes. new structural posts beams and shear wall. new kitchen and bath finishesDetails
interior remodel of lower unit. selective demo of structural bearing wall, kitchen and interior finishes. new structural posts beams and shear wall. new kitchen and bath finishes | $35,000 |
| Jul 22, 2014 | Completed final sign-off Jun 2016 | 149 Teresita Bl | remodel 1st floor: add bedroom, family room and full bath. remove 2nd floor door at (e) stairs.Details
remodel 1st floor: add bedroom, family room and full bath. remove 2nd floor door at (e) stairs. | $45,000 |
| Jan 7, 2014 | Completed final sign-off Jun 2014 | 450 Los Palmos Dr | addition of 2nd bathroom to house. conversion of basement storage cupboard/area to include sink, wc, & shower. addition of doorway to separate bathroom from basement. upgrade stair well from kitchen to bathroom/bsmnt (sheetrock/carpet)conversion of remaining basement storage area to laundry room.Details
addition of 2nd bathroom to house. conversion of basement storage cupboard/area to include sink, wc, & shower. addition of doorway to separate bathroom from basement. upgrade stair well from kitchen to bathroom/bsmnt (sheetrock/carpet)conversion of remaining basement storage area to laundry room. | $20,000 |
| Dec 16, 2013 | Completed final sign-off Nov 2015 | 1680 Sloat Bl | convert 1/fl bath to laundry,remodel kitchen & add 2/fl powder rm.remodel 2/fl bath.add attic level bath&closet.ext wk limited to roof repair, entry stair repair&reloc rear deck patio door.repair 9 reclad entry stair.remove garden wall.Details
convert 1/fl bath to laundry,remodel kitchen & add 2/fl powder rm.remodel 2/fl bath.add attic level bath&closet.ext wk limited to roof repair, entry stair repair&reloc rear deck patio door.repair 9 reclad entry stair.remove garden wall. | $180,000 |
| Nov 20, 2013 | Completed final sign-off Mar 2014 | 512 Oak St | 3rd floor interior remodel:1. alterations to existing bath, bedroom closets and hall. 2. relocate washer and dryer. 3. remodel bedroom to bath.Details
3rd floor interior remodel:1. alterations to existing bath, bedroom closets and hall. 2. relocate washer and dryer. 3. remodel bedroom to bath. | $23,300 |
| Nov 18, 2013 | Completed final sign-off Apr 2014 | 377 Capitol Av | convert (e) bathroom into one full bath room and one half bath room. all work at second floor.Details
convert (e) bathroom into one full bath room and one half bath room. all work at second floor. | $16,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2014 | 3691 17th St | remodel two units build 1. replace all old windows with new insulated and energy efficient windows. 2) repair/ replace old drywall and insulation with new drywall and insulation 3) install new 2008 energy code compliant electrical lighting throughout 4) replace all old kitchens and bathrooms.add 2Details
remodel two units build 1. replace all old windows with new insulated and energy efficient windows. 2) repair/ replace old drywall and insulation with new drywall and insulation 3) install new 2008 energy code compliant electrical lighting throughout 4) replace all old kitchens and bathrooms.add 2 | $250,000 |
| Mar 22, 2013 | Completed final sign-off Jun 2013 | 1229 Ulloa St | remodel kitchen and 2 baths. kitchen remodel lighting to comply with cec 150 kDetails
remodel kitchen and 2 baths. kitchen remodel lighting to comply with cec 150 k | $15,000 |
| Mar 29, 2010 | Completed final sign-off Jul 2010 | 1337 Vicente St | remodel ground floor. add 1 bedroom, family room, full bathroom and storage room.Details
remodel ground floor. add 1 bedroom, family room, full bathroom and storage room. | $40,000 |
| May 23, 2008 | Completed final sign-off Jul 2008 | 18 Redondo St | remodel bathroom and change two bedrooms drywall and one storage room and living room on second floor. less than 2/3 wall coverage. replace on two windows in kind. one front one back.Details
remodel bathroom and change two bedrooms drywall and one storage room and living room on second floor. less than 2/3 wall coverage. replace on two windows in kind. one front one back. | $15,000 |
| Feb 7, 2008 | Completed final sign-off Jun 2008 | 1750 Fitzgerald Av | ground floor: add 1 (n) bathroom and 1 (n) bedroom. remodel/reconfigure 1 (e) bathroom & 1 (e) bedroom. enlarge two (e) windows. relocate garage door. replace existing furnace. all work as per plans.Details
ground floor: add 1 (n) bathroom and 1 (n) bedroom. remodel/reconfigure 1 (e) bathroom & 1 (e) bedroom. enlarge two (e) windows. relocate garage door. replace existing furnace. all work as per plans. | $20,000 |
| Jun 5, 2007 | Completed final sign-off Aug 2007 | 2000 Bancroft Av | one bedroom, storage room, & full bathroom to be added at g/f. construct 5'x9' deck at rear of bldng.Details
one bedroom, storage room, & full bathroom to be added at g/f. construct 5'x9' deck at rear of bldng. | $20,000 |