Back to bathroom remodel contractors
Xlt Builders Inc
- Based in
- San Mateo
- On San Francisco permits
- Jun 2021 to Jan 2026
- Last 24 months
- 5 permits filed
10 permits since 2000: 7 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2024 | Completed final sign-off Nov 2024 | 98 Newton St | bathroom remodel like for like.Details
bathroom remodel like for like. | $10,000 |
| Sep 7, 2022 | Completed final sign-off Jan 2023 | 88 King St | unit 716 - master bathroom remodeling - fixture replacement with sink addition and rotate the stackable washer and dryer; 2nd bathroom - fixture replacement and replace pocket door by swing door; finishing floor replacement at entire apartment, carpet and wood floor by engineered wood floor withDetails
unit 716 - master bathroom remodeling - fixture replacement with sink addition and rotate the stackable washer and dryer; 2nd bathroom - fixture replacement and replace pocket door by swing door; finishing floor replacement at entire apartment, carpet and wood floor by engineered wood floor with | $90,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 661 Shotwell St | bathroom addition into (e) footprint. framing walls. no structural work. 2 outlest, 5 lights, faucet, shower valve, toilet.Details
bathroom addition into (e) footprint. framing walls. no structural work. 2 outlest, 5 lights, faucet, shower valve, toilet. | $22,000 |