Back to bathroom remodel contractors
Xing Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Feb 2026
- Last 24 months
- 1 permit filed
12 permits since 2000: 9 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 3 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2024 | Completed final sign-off Sep 2024 | 618 33rd Av | 3rd fl - reconfigure and remodel half bath with replacement of (e) windows in existing frame. windows not visible from streetDetails
3rd fl - reconfigure and remodel half bath with replacement of (e) windows in existing frame. windows not visible from street | $20,000 |
| Feb 21, 2024 | Expired or cancelled expired Mar 2026 | 1816 Funston Av | 1/f add laundry room. 2/f remodel kitchen, living room , dining rm & bathroom. add 1 bathroom. 3/f: remodel bedrooms and bathroom. add 1 bathroom. reconfigure interior stairs. add skylight. replace windows at rear per plan. add insulation & replace interior finishes.Details
1/f add laundry room. 2/f remodel kitchen, living room , dining rm & bathroom. add 1 bathroom. 3/f: remodel bedrooms and bathroom. add 1 bathroom. reconfigure interior stairs. add skylight. replace windows at rear per plan. add insulation & replace interior finishes. | $100,000 |
| Aug 25, 2015 | Completed final sign-off May 2016 | 2271 Cecilia Av | 1st flr: remodel bedroom, family rm, office. add one bedrm, two full bath & relocate garage door forward per plan, 2nd flr: remodel kitchen, bathroom, add one full bath & relocate entry door.Details
1st flr: remodel bedroom, family rm, office. add one bedrm, two full bath & relocate garage door forward per plan, 2nd flr: remodel kitchen, bathroom, add one full bath & relocate entry door. | $63,600 |
| Mar 19, 2014 | Completed final sign-off Mar 2015 | 109 Ottawa Av | add and legalize 2 new bedroom, 2 (n) bathrooms on 1/f, new paint on both floors.Details
add and legalize 2 new bedroom, 2 (n) bathrooms on 1/f, new paint on both floors. | $35,000 |
| Feb 7, 2014 | Completed final sign-off Apr 2014 | 54 Rae Av | comply with complaint #201448021, remodel (e) kitchen, bathroom, replace (e) sheetrock with 5/8" gyp. bd "x" & r-13 insulation and convert (e) closet into toilet room and replace 12 windows, not visable from street.Details
comply with complaint #201448021, remodel (e) kitchen, bathroom, replace (e) sheetrock with 5/8" gyp. bd "x" & r-13 insulation and convert (e) closet into toilet room and replace 12 windows, not visable from street. | $32,000 |
| Sep 19, 2013 | Completed final sign-off Jan 2014 | 54 Rae Av | legalize one bedroom, one bathroom, construct one new bedroom, family room & one half bathroom. all work at ground floor.Details
legalize one bedroom, one bathroom, construct one new bedroom, family room & one half bathroom. all work at ground floor. | $32,000 |