Back to bathroom remodel contractors
Wynn L Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Jul 2026
- Last 24 months
- 6 permits filed
17 permits since 2000: 14 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 28 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 3050 25th Av | remodeling existing building. change existing dinning room to a bedroom, add 1 bath room in the garage area.Details
remodeling existing building. change existing dinning room to a bedroom, add 1 bath room in the garage area. | $128,000 |
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2333 Funston Av | convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200ampDetails
convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200amp | $400,000 |
| Feb 15, 2023 | Completed final sign-off May 2023 | 3925 Mission St | remodel kitchen (90sf) and bathroom (40sf) in kind. replace 4 windows not visible from street. no removal of wallsDetails
remodel kitchen (90sf) and bathroom (40sf) in kind. replace 4 windows not visible from street. no removal of walls | $25,000 |
| Oct 11, 2022 | Completed final sign-off Apr 2025 | 1143 Rivera St | propose adu at ground floor per ordinance 162-16. two bedroom adu with two full baths and new kitchen.Details
propose adu at ground floor per ordinance 162-16. two bedroom adu with two full baths and new kitchen. | $42,000 |
| Aug 16, 2022 | Completed final sign-off Jan 2024 | 157 Stonecrest Dr | 1st floor: remodel kitchen and bath, add 1/2 bath, family room. 2nd floor: remodel bath.new patio at rear. (1) new window @ front w/aluminum clad woodDetails
1st floor: remodel kitchen and bath, add 1/2 bath, family room. 2nd floor: remodel bath.new patio at rear. (1) new window @ front w/aluminum clad wood | $70,000 |