Wu Yu Gao Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Jul 2024
- Last 24 months
- 0 permits filed
27 permits since 2000: 25 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2024 | Completed final sign-off May 2025 | 900 Avalon Av | interior remodel 1st fl: add 1 bedroom, family & bathroom 2nd fl: remodel (e) kitchen, family, dining & bathroom. add 1 full bathDetails
interior remodel 1st fl: add 1 bedroom, family & bathroom 2nd fl: remodel (e) kitchen, family, dining & bathroom. add 1 full bath | $80,000 |
| Aug 27, 2019 | Completed final sign-off Jun 2022 | 122 Tioga Av | add a new bedroom on the upper floor (bedroom & bath) 240 sf, add a new living room on the ground floor. 200 sf.Details
add a new bedroom on the upper floor (bedroom & bath) 240 sf, add a new living room on the ground floor. 200 sf. | $30,000 |
| Jan 25, 2019 | Completed final sign-off Jun 2019 | 704 Moultrie St | in-filled open space under 2nd fl habitable area. relocate rear stair & add laundry room. reconfigure interior layout per plan.Details
in-filled open space under 2nd fl habitable area. relocate rear stair & add laundry room. reconfigure interior layout per plan. | $15,000 |
| Sep 18, 2018 | Completed final sign-off Apr 2019 | 2527 39th Av | 1st floor: add 2 bedrooms, 2.5 baths and media room with wetbar. 2nd floor: relocate kitchen, add 1.5 baths, remodel 1 bath, new laundry. new deck at rear. new rear windows and sliding doors. - new stucco at the front. foundation repair(minor)Details
1st floor: add 2 bedrooms, 2.5 baths and media room with wetbar. 2nd floor: relocate kitchen, add 1.5 baths, remodel 1 bath, new laundry. new deck at rear. new rear windows and sliding doors. - new stucco at the front. foundation repair(minor) | $100,000 |
| Jul 9, 2018 | Completed final sign-off Jun 2019 | 704 Moultrie St | front stair replacement per plans, more than 50%Details
front stair replacement per plans, more than 50% | $10,000 |
| May 23, 2018 | Completed final sign-off Jul 2018 | 122 Tioga Av | new stucco at front of house (in-kind). horizontal trim division to remain. no other work.Details
new stucco at front of house (in-kind). horizontal trim division to remain. no other work. | $2,500 |
| May 1, 2018 | Completed final sign-off Jun 2019 | 704 Moultrie St | residential interior remodel of structure and addition of habitable space on ground fl. new 1 bed, 1/2 bath on ground fl. remodel on 2nd floor and add 1/2 bath. relocated rear yard access stair. new 1 bed & bath on 3rd fl. new dormer windows in accordance with za bulletin #3. rear yard landscapingDetails
residential interior remodel of structure and addition of habitable space on ground fl. new 1 bed, 1/2 bath on ground fl. remodel on 2nd floor and add 1/2 bath. relocated rear yard access stair. new 1 bed & bath on 3rd fl. new dormer windows in accordance with za bulletin #3. rear yard landscaping | $120,000 |
| Mar 28, 2018 | Completed final sign-off Jul 2018 | 122 Tioga Av | 2nd floor: add 1 new bathroom, remodel extg bath & extg kitchen. g/f add 1 new bathroom, 1 new bedroom, new family room. exterior: add 1 new skylight on roof. replace 2 windows (vinyl) at rear ground floor in kind.Details
2nd floor: add 1 new bathroom, remodel extg bath & extg kitchen. g/f add 1 new bathroom, 1 new bedroom, new family room. exterior: add 1 new skylight on roof. replace 2 windows (vinyl) at rear ground floor in kind. | $78,000 |
| Mar 23, 2018 | Completed final sign-off Jun 2018 | 2239 29th Av | replace exterior stucco.Details
replace exterior stucco. | $6,000 |
| Jan 10, 2018 | Completed final sign-off Jun 2018 | 2239 29th Av | minor arch revision to previously approved permit #201708286040 at ground and 2nd fl. add a half bathgroom at 2nd fl to approved permits.Details
minor arch revision to previously approved permit #201708286040 at ground and 2nd fl. add a half bathgroom at 2nd fl to approved permits. | |
| Jun 29, 2017 | Completed final sign-off Dec 2017 | 347 Lisbon St | add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan.Details
add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan. | $90,000 |
| Apr 14, 2017 | Completed final sign-off Dec 2017 | 347 Lisbon St | 1) to add on full bathroom and remodel extg bathroom on 2nd floor per plan. 2)to add one full bathroom and remodel extg bath room on 3rd floor per plan.Details
1) to add on full bathroom and remodel extg bathroom on 2nd floor per plan. 2)to add one full bathroom and remodel extg bath room on 3rd floor per plan. | $40,000 |
| Feb 6, 2017 | Completed final sign-off Jan 2018 | 1674 Palou Av | construct rear deck (10' ht. max) at ground floor level per plan.Details
construct rear deck (10' ht. max) at ground floor level per plan. | $7,000 |
| Jan 9, 2017 | Completed final sign-off Jan 2018 | 1674 Palou Av | add 2 bedrooms, 2 full bathrooms on (e) basement; add 2 bedrooms, 2 full bathrooms on ground floor; add 2 full bath room and remodel (e) kitchen & bathroom on 2nd floor per plan.Details
add 2 bedrooms, 2 full bathrooms on (e) basement; add 2 bedrooms, 2 full bathrooms on ground floor; add 2 full bath room and remodel (e) kitchen & bathroom on 2nd floor per plan. | $190,000 |
| Jul 28, 2016 | Completed final sign-off May 2017 | 19 Justin Dr | foundation repair per plan.Details
foundation repair per plan. | $5,000 |
| Jul 15, 2016 | Completed final sign-off May 2017 | 19 Justin Dr | comply with 201621361: g/f- add 2 (n) bedrooms, 2 new baths ,new home theater and new laundry, sheetrock garage. 2/f- add 1 new bath, new 1/2 bath, remodel 2 (e) bedrooms, kitchen, bath, living rm, dining rm. 2 new skylightsDetails
comply with 201621361: g/f- add 2 (n) bedrooms, 2 new baths ,new home theater and new laundry, sheetrock garage. 2/f- add 1 new bath, new 1/2 bath, remodel 2 (e) bedrooms, kitchen, bath, living rm, dining rm. 2 new skylights | $85,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2016 | 322 Flood Av | 1/f: convert (e) space to family room, 2 bedrooms, 2 full baths, powder room and laundry area; 2nd floor - remodel (e) kitchen and bathroom, add full bath and powder room.Details
1/f: convert (e) space to family room, 2 bedrooms, 2 full baths, powder room and laundry area; 2nd floor - remodel (e) kitchen and bathroom, add full bath and powder room. | $80,000 |
| Oct 14, 2015 | Completed final sign-off Mar 2016 | 590 Vienna St | to comply with nov 201569362 & remodel: g/f: remove illegal kitchen, legalize 1 new bath, 2 bedrooms & 1 home theater. remove rooms in (e) rear shed back to storage. 2/f: add 2 full baths, remodel 1 bath, kitchen; add 5 skylights.Details
to comply with nov 201569362 & remodel: g/f: remove illegal kitchen, legalize 1 new bath, 2 bedrooms & 1 home theater. remove rooms in (e) rear shed back to storage. 2/f: add 2 full baths, remodel 1 bath, kitchen; add 5 skylights. | $70,000 |
| Sep 17, 2015 | Never finaled issued Oct 2015, no final | 1052 Jamestown Av | to comply with nov 2010 36222: remove illegal unit in (e) basement. remove 2 bedrooms, 1 full bath, 1 kitchen & storage. remove bathroom shower, toilet & sink to source. remove kitchen stove, cabinets, frdge, counter, and sink to source per planDetails
to comply with nov 2010 36222: remove illegal unit in (e) basement. remove 2 bedrooms, 1 full bath, 1 kitchen & storage. remove bathroom shower, toilet & sink to source. remove kitchen stove, cabinets, frdge, counter, and sink to source per plan | $30,000 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 2178 22nd Av | 2nd floor - add 1 full bath, remodel 1 bathroom, remodel powder to be full bath; remodel kitchen, add recessed light to living room. add 1 sky lightDetails
2nd floor - add 1 full bath, remodel 1 bathroom, remodel powder to be full bath; remodel kitchen, add recessed light to living room. add 1 sky light | $40,000 |
| Jul 14, 2015 | Completed final sign-off Aug 2015 | 4010 San Bruno Av | remodel extg kitchen on 2nd floor (replace extg plumbing, electrical, and lighting) per plan.Details
remodel extg kitchen on 2nd floor (replace extg plumbing, electrical, and lighting) per plan. | $10,000 |
| Jan 30, 2014 | Completed final sign-off Apr 2014 | 421 Nevada St | upper level: remodel (e) kitchen, (e) bath. lower level: add new bathroom, legalize family room. replace all window and patio door with (n) rear & side window vinyl, wood clad window @ front.Details
upper level: remodel (e) kitchen, (e) bath. lower level: add new bathroom, legalize family room. replace all window and patio door with (n) rear & side window vinyl, wood clad window @ front. | $35,000 |
| Nov 21, 2013 | Completed final sign-off Apr 2014 | 1339 25th Av | add one bedroom, gameroom, utility room & bathroom at gr fl. add hallway.Details
add one bedroom, gameroom, utility room & bathroom at gr fl. add hallway. | $48,000 |
| Aug 12, 2013 | Completed final sign-off Sep 2013 | 325 Bacon St | comply w/complaint #201314371 dated 7/30/13 - remove existing illegal rear deck & construct new rear deck 5'x11' (9'-0" ht) at rear of existing bldg per plan.Details
comply w/complaint #201314371 dated 7/30/13 - remove existing illegal rear deck & construct new rear deck 5'x11' (9'-0" ht) at rear of existing bldg per plan. | $3,000 |
| Jan 24, 2013 | Completed final sign-off Aug 2013 | 168 Caine Av | revision work to previous permit #201211194473 legalize horizontal addition, rebuild wood deck.Details
revision work to previous permit #201211194473 legalize horizontal addition, rebuild wood deck. | $25,000 |
| Jul 18, 2008 | Completed final sign-off Sep 2008 | 3125 San Jose Av | comply to nov #200723200. remove (e) kitchen, counter/sink/range and remove garage bedroom. remodel storage. convert half bath to full bath. adjust hallway partition (9'-6" total). 2nd fl-cover exposed wiring, patch hole in kitchen and closet walls.Details
comply to nov #200723200. remove (e) kitchen, counter/sink/range and remove garage bedroom. remodel storage. convert half bath to full bath. adjust hallway partition (9'-6" total). 2nd fl-cover exposed wiring, patch hole in kitchen and closet walls. | $10,000 |
| Jul 8, 2008 | Completed final sign-off Sep 2008 | 581 Thornton Av | convert a portion of ex. garage into a new laundry rm and bathroom. change ex. garage double door to single doorDetails
convert a portion of ex. garage into a new laundry rm and bathroom. change ex. garage double door to single door | $7,000 |