Back to bathroom remodel contractors
Wrenwood O'brien Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Aug 2010
- Last 24 months
- 0 permits filed
97 permits since 2000: 68 completed, 16 never finaled, 13 expired or cancelled.
Of the 16 never-finaled permits, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 13 completed, 5 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2009 | Never finaled issued Mar 2009, no final | 1136 Haight St | demo bathroom in front of building and insulate and sheetrock new shower. remodel 1 bathroom.Details
demo bathroom in front of building and insulate and sheetrock new shower. remodel 1 bathroom. | $12,000 |
| Jun 10, 2008 | Completed final sign-off Aug 2008 | 1136 Haight St | remodel existing main 1 bathroom. no change to any door or window work .Details
remodel existing main 1 bathroom. no change to any door or window work . | $15,000 |
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 1594 42nd Av | revision to pa# 200704279869 & 200507278695 interior remodel at front to revision, 2 bed, family rm, one full bathn downstairs. 3 bed and 2 bath upstairs. beds at upstairs relocated from front to rear of building. no change of title 24. new plywood shear at front and bearing beamDetails
revision to pa# 200704279869 & 200507278695 interior remodel at front to revision, 2 bed, family rm, one full bathn downstairs. 3 bed and 2 bath upstairs. beds at upstairs relocated from front to rear of building. no change of title 24. new plywood shear at front and bearing beam | $20,000 |
| Aug 1, 2007 | Never finaled issued Aug 2007, no final | 616 Laguna Honda Bl | bathroom remodel , retile bathroom, wall new fixtures, cabinets, reconnect plumbingDetails
bathroom remodel , retile bathroom, wall new fixtures, cabinets, reconnect plumbing | $8,000 |
| Jul 16, 2007 | Completed final sign-off Jan 2008 | 1040 Green St | tileing two existing bathrooms, installing one shower . reinstall toilet + sinks.Details
tileing two existing bathrooms, installing one shower . reinstall toilet + sinks. | $20,000 |
| May 9, 2007 | Completed final sign-off May 2007 | 266 Hearst Av | rev. to applic. #2006/01/05/1557: added 2nd skylight in master bathroom switched toilet and shower location.Details
rev. to applic. #2006/01/05/1557: added 2nd skylight in master bathroom switched toilet and shower location. | $700 |
| Apr 26, 2007 | Completed final sign-off Jan 2008 | 455 Valley St | remodel to (e) lower flr unit to include new kitchen and bath in new configuration. moving (e) bedroom/wall to increase size, open bdrm/south wall move door location, enlarge bdrm 2, enlarge bath, move main floor units furn & loater heater to basement, add gas fire place in lvrm. relocate (e)Details
remodel to (e) lower flr unit to include new kitchen and bath in new configuration. moving (e) bedroom/wall to increase size, open bdrm/south wall move door location, enlarge bdrm 2, enlarge bath, move main floor units furn & loater heater to basement, add gas fire place in lvrm. relocate (e) | $60,000 |
| Mar 16, 2007 | Completed final sign-off Apr 2007 | 335 27th Av | work @ apt# b & apt# c only. to comply with nov# 200788775 & nov# 200342491. replace deck railing on # b to meet current code. replace stringer & 2 threads in kind less than 50% . replace dryrot in bathroom around window. apt c. replace 1 stringer less than 50%.Details
work @ apt# b & apt# c only. to comply with nov# 200788775 & nov# 200342491. replace deck railing on # b to meet current code. replace stringer & 2 threads in kind less than 50% . replace dryrot in bathroom around window. apt c. replace 1 stringer less than 50%. | $5,000 |
| Feb 15, 2007 | Completed final sign-off Mar 2007 | 3014 Clay St | fire repair on unit# 3c & unit# 2c in living room. kitchen & bathroom.Details
fire repair on unit# 3c & unit# 2c in living room. kitchen & bathroom. | $35,000 |
| Feb 12, 2007 | Completed final sign-off Jan 2008 | 563 Belvedere St | remodel kitchen and bath and make opening bigger between kitchen and dining room. install new window, 9 new windows, not visible from streetDetails
remodel kitchen and bath and make opening bigger between kitchen and dining room. install new window, 9 new windows, not visible from street | $100,000 |
| Dec 4, 2006 | Completed final sign-off Apr 2007 | 761 Anderson St | bathroom remodel - all fixtures to be placed in same layout. no walls moved.replace existing exterior french door at rear. provide efficacy lighting at bathroom at main switch.Details
bathroom remodel - all fixtures to be placed in same layout. no walls moved.replace existing exterior french door at rear. provide efficacy lighting at bathroom at main switch. | $15,000 |
| Nov 22, 2006 | Expired or cancelled expired Nov 2007 | 433 Ulloa St | remodel hall bath, take out everthing-bathtub, toilet, vanity- replace . put in new plumbing. lighting and a shower stall. replace floor tile. lighting to be flourscent or on occupant sensor.Details
remodel hall bath, take out everthing-bathtub, toilet, vanity- replace . put in new plumbing. lighting and a shower stall. replace floor tile. lighting to be flourscent or on occupant sensor. | $25,000 |
| Sep 25, 2006 | Never finaled issued Oct 2007, no final | 2255 Washington St | extand extg bedroom at lower level, add new bathroom, new patio gradeDetails
extand extg bedroom at lower level, add new bathroom, new patio grade | $50,000 |
| Jan 12, 2006 | Completed final sign-off May 2006 | 659 Fillmore St | provide smoke alarm per 310.9.1, fire damage repair. bathroom remodel on apt 9; roof repair & wall repair in misc area & work & repair units 9,10Details
provide smoke alarm per 310.9.1, fire damage repair. bathroom remodel on apt 9; roof repair & wall repair in misc area & work & repair units 9,10 | $25,000 |
| Jul 27, 2005 | Never finaled issued Aug 2006, no final | 1594 42nd Av | horizontal extension @rear,add family room,bathroom,laundry room @lower level.add master bedroom,relocate kitchen and relocate (e) bedrooms at upper level.Details
horizontal extension @rear,add family room,bathroom,laundry room @lower level.add master bedroom,relocate kitchen and relocate (e) bedrooms at upper level. | $80,000 |
| Jul 7, 2005 | Expired or cancelled expired Jan 2007 | 1701 Broadway | remodel guest bathroom. no walls been touched.Details
remodel guest bathroom. no walls been touched. | $9,500 |
| Jul 7, 2005 | Completed final sign-off Oct 2005 | 5 Perego Tr | remodel (e) two (2) bathrooms w/new tile flr, walls, counter top & shower. new tub, toilets, sinksDetails
remodel (e) two (2) bathrooms w/new tile flr, walls, counter top & shower. new tub, toilets, sinks | $12,000 |
| Jan 20, 2005 | Completed final sign-off Apr 2005 | 1677 Bush St | redoing cabinets in kitchen & bathroom redoing elec & plumbing in bathrm & kitchenDetails
redoing cabinets in kitchen & bathroom redoing elec & plumbing in bathrm & kitchen | $9,500 |
| Dec 15, 2004 | Completed final sign-off Jun 2005 | 2425 Divisadero St | bathroom remodel in upstairs bedroom. no structuralDetails
bathroom remodel in upstairs bedroom. no structural | $8,000 |
| Nov 3, 2004 | Completed final sign-off Dec 2004 | 1677 Bush St | kitchen and bath remodel unit 1, cabinet and counter top tile floor, no addition or removal of partiDetails
kitchen and bath remodel unit 1, cabinet and counter top tile floor, no addition or removal of parti | $9,000 |