Back to bathroom remodel contractors
World Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to May 2014
- Last 24 months
- 0 permits filed
16 permits since 2000: 8 completed, 1 never finaled, 7 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2013 | Completed final sign-off Mar 2014 | 1718 Revere Av | remodel 1/f- to add one study room; one 1/2 bath, and one family room.Details
remodel 1/f- to add one study room; one 1/2 bath, and one family room. | $25,000 |
| Apr 2, 2007 | Completed final sign-off Mar 2008 | 2265 31st Av | revisio to 200611016571s, relocate rear stairs, remodel kitchen, baths. infill lightwell at prop line. interior remodel to upstairs, repair/replace e plasterDetails
revisio to 200611016571s, relocate rear stairs, remodel kitchen, baths. infill lightwell at prop line. interior remodel to upstairs, repair/replace e plaster | $35,000 |
| Jan 12, 2007 | Completed final sign-off Sep 2007 | 200 San Marcos Av | remodeling 2 existing bathroom, replace wall tile, vanity, toilet, existing shower replace kitchen cabinets.Details
remodeling 2 existing bathroom, replace wall tile, vanity, toilet, existing shower replace kitchen cabinets. | $9,000 |
| Jan 9, 2006 | Completed final sign-off Jun 2008 | 231 Seneca Av | horizontal addition- remodel part of existing first flr & add new family room & bath in rear. remodel part of 2nd floor & add master bedroom suite.Details
horizontal addition- remodel part of existing first flr & add new family room & bath in rear. remodel part of 2nd floor & add master bedroom suite. | $125,000 |
| Feb 22, 2002 | Completed final sign-off Apr 2002 | 1526 08th Av | remodel (e)bathroom, replace bathtub, toilet, vanity, wall floor ceramicDetails
remodel (e)bathroom, replace bathtub, toilet, vanity, wall floor ceramic | $4,000 |
| Jan 23, 2001 | Completed final sign-off Mar 2001 | 475 Douglass St | remodeling (e) bathroom, replace tub,toilet, wall floor tileDetails
remodeling (e) bathroom, replace tub,toilet, wall floor tile | $5,500 |