Back to bathroom remodel contractors
Working Class Construction
- Based in
- Vacaville
- On San Francisco permits
- Sep 2012 to Jan 2020
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 600 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 1333 Jones St | remove & retile 2 bathroom showers only. replace ktichen countertops. upgrade (e) kitchen electrical & lighting. in unit. install new appliances, remove 1 doorway and one small partition wall - non-load bearing; retile patio.Details
remove & retile 2 bathroom showers only. replace ktichen countertops. upgrade (e) kitchen electrical & lighting. in unit. install new appliances, remove 1 doorway and one small partition wall - non-load bearing; retile patio. | $40,000 |
| Jan 8, 2016 | Completed final sign-off Oct 2017 | 2130 Harrison St | unit #15: first floor - replace vanity/vanity light/toilet/fixtures. install new pre fab shower kit. second floor - replace vanity/vanity light/toilet/fixtures. install 2 new shower valves. replace tile on floor and walls on both bathrooms.Details
unit #15: first floor - replace vanity/vanity light/toilet/fixtures. install new pre fab shower kit. second floor - replace vanity/vanity light/toilet/fixtures. install 2 new shower valves. replace tile on floor and walls on both bathrooms. | $10,000 |
| Mar 28, 2013 | Expired or cancelled expired Mar 2023 | 1355 46th Av | replace 3 windows with door and add new deck at back of home and add half bath on 1st level, electrical & plumbingDetails
replace 3 windows with door and add new deck at back of home and add half bath on 1st level, electrical & plumbing | $30,000 |
| Sep 11, 2012 | Completed final sign-off Apr 2014 | 1 Roanoke St | to comply with n.o.v. 201258003. new laundry at 3rd flr. window replacement. interior framing. remove center bearing wall at 2nd flr. new half bath. replace front exterior staircase. new doors at rear.Details
to comply with n.o.v. 201258003. new laundry at 3rd flr. window replacement. interior framing. remove center bearing wall at 2nd flr. new half bath. replace front exterior staircase. new doors at rear. | $50,000 |