Back to bathroom remodel contractors
Woods Const Co
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2014 to Jul 2026
- Last 24 months
- 7 permits filed
31 permits since 2000: 18 completed, 3 in progress, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 3 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2025 | Completed final sign-off Nov 2025 | 4149 26th St | add 2 bathrooms and wet bar to revision application#: 202505075942.Details
add 2 bathrooms and wet bar to revision application#: 202505075942. | $16,000 |
| May 7, 2025 | Completed final sign-off Nov 2025 | 4149 26th St | remodel main bathroom and kitchen in kind. no change to floor layout. no change to wall layout. no structural work.Details
remodel main bathroom and kitchen in kind. no change to floor layout. no change to wall layout. no structural work. | $60,000 |
| Sep 5, 2024 | Completed final sign-off Apr 2025 | 4033 25th St | 1 kitchen & 2 bathrooms renovation new applicances, interior finishes for both unit upper unit 4033 & lower unit 4035. move first fl window (4035 25th st) replace mech effeciency heat pumpDetails
1 kitchen & 2 bathrooms renovation new applicances, interior finishes for both unit upper unit 4033 & lower unit 4035. move first fl window (4035 25th st) replace mech effeciency heat pump | $35,000 |
| Nov 30, 2018 | Never finaled issued Nov 2019, no final | 4449 25th St | horizontal & vertical addition. renovation of (e) 2-story sfh includes: addition of 3rd flr, rear expansion & interior remodel. proposed project includes (4) bed, (4.5) bath, (1)playroom, (1) car stacker for (2) cars. design build fire sprinkler for nfpa 13r under separate permit.Details
horizontal & vertical addition. renovation of (e) 2-story sfh includes: addition of 3rd flr, rear expansion & interior remodel. proposed project includes (4) bed, (4.5) bath, (1)playroom, (1) car stacker for (2) cars. design build fire sprinkler for nfpa 13r under separate permit. | $642,750 |
| Nov 6, 2017 | Completed final sign-off May 2018 | 182 32nd Av | basement (n) work out room, wine storage & bathroom. 1st floor (re) bathroom; 3rd fl - (n) sauna room & bathroom. partial roof strengthening to repair (e) dry-rot, (n) wet barDetails
basement (n) work out room, wine storage & bathroom. 1st floor (re) bathroom; 3rd fl - (n) sauna room & bathroom. partial roof strengthening to repair (e) dry-rot, (n) wet bar | $48,000 |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1747 39th Av | revision to appl #201511031631 - remove wall & add beam at roof, relocate (e) rooms on 2nd floor, add shearwalls & holdowns, legalize bathroom & family room @ 1st floor.Details
revision to appl #201511031631 - remove wall & add beam at roof, relocate (e) rooms on 2nd floor, add shearwalls & holdowns, legalize bathroom & family room @ 1st floor. | $100,000 |