Back to bathroom remodel contractors
Wolk Development Company Llc
- Based in
- Novato
- On San Francisco permits
- Mar 2018 to Nov 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2023 | Completed final sign-off Feb 2025 | 1554 Chestnut St | remodel kitchen with new cabinets, new counters, new appliances, new can lighting and under cabinet led lighting. remodel bathroom with new shower controls, new can lighting, new low flow toilet, new floor and wall tile, new vanity. remodel half bath w/ new sink, new toilet, new floor tile.Details
remodel kitchen with new cabinets, new counters, new appliances, new can lighting and under cabinet led lighting. remodel bathroom with new shower controls, new can lighting, new low flow toilet, new floor and wall tile, new vanity. remodel half bath w/ new sink, new toilet, new floor tile. | $65,000 |
| Jun 24, 2019 | Completed final sign-off Aug 2019 | 525 Ortega St | remodel kitchen with new flooring, cabinets, counters, appliances, remodel 2.5 bathrooms with new tile floors, shower/tub tile, new toilets, new vanities, new shower controls. no framing modification - no structural work.Details
remodel kitchen with new flooring, cabinets, counters, appliances, remodel 2.5 bathrooms with new tile floors, shower/tub tile, new toilets, new vanities, new shower controls. no framing modification - no structural work. | $75,000 |
| Mar 21, 2019 | Completed final sign-off May 2019 | 3016 Laguna St | retile two bathrooms, install new vanity, install new toilet, paint 5'x 7' roughly & 5x5 roughlyDetails
retile two bathrooms, install new vanity, install new toilet, paint 5'x 7' roughly & 5x5 roughly | $25,000 |
| Jun 29, 2018 | Completed final sign-off Sep 2018 | 3324 Scott St | demo old plaster walls and ceiling from at re-hallway wall, close off bathromm entry door & relocate to other wall, build new bathroom to 3rd bedroom, install new kitchen counters and cabinets, install new windows not visible fromt he stree, install non structural wall & ceiling maher nDetails
demo old plaster walls and ceiling from at re-hallway wall, close off bathromm entry door & relocate to other wall, build new bathroom to 3rd bedroom, install new kitchen counters and cabinets, install new windows not visible fromt he stree, install non structural wall & ceiling maher n | $75,000 |
| Apr 16, 2018 | Completed final sign-off Sep 2018 | 3326 Scott St | to comply with nov 201856051 - replace windows not visable from st, add new bathroom, convert sun porch to bedroom, add closet build new hallway wall, remove plaster & re-sheetrock. all work in 3326 scott. no exterior work visible from street. in 90% unit - new insulation; n/a maherDetails
to comply with nov 201856051 - replace windows not visable from st, add new bathroom, convert sun porch to bedroom, add closet build new hallway wall, remove plaster & re-sheetrock. all work in 3326 scott. no exterior work visible from street. in 90% unit - new insulation; n/a maher | $25,000 |
| Mar 26, 2018 | Completed final sign-off Sep 2018 | 3326 Scott St | bathroom and kitchen remodel. replace cabinets, counters, backsplash, appliances in like kind in kitchen. replace tub wih shower pan, tiles on floor and walls, new vanity, new toilet in bathroom, paint back and sides of building. no change on walls.Details
bathroom and kitchen remodel. replace cabinets, counters, backsplash, appliances in like kind in kitchen. replace tub wih shower pan, tiles on floor and walls, new vanity, new toilet in bathroom, paint back and sides of building. no change on walls. | $50,000 |