Back to bathroom remodel contractors
Wolfe Painting Co
- Based in
- Daly City
- On San Francisco permits
- May 2009 to Aug 2026
- Last 24 months
- 24 permits filed
123 permits since 2000: 92 completed, 14 in progress, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 27 completed, 5 in progress, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress issued Aug 2026 | 227 Roosevelt Wy | add 1 (n) wet bar, 1 (remodel) full bath and 1 (n) bedroom on 1st floor. remodel one new full bath.Details
add 1 (n) wet bar, 1 (remodel) full bath and 1 (n) bedroom on 1st floor. remodel one new full bath. | $22,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 542 41st Av | kitchen remodel in kind position/new cabibets, countertop. bathroom new vanity, toilet. replace 5 front windows with new vinyl windows. no removal of wallsDetails
kitchen remodel in kind position/new cabibets, countertop. bathroom new vanity, toilet. replace 5 front windows with new vinyl windows. no removal of walls | $40,000 |
| Dec 11, 2025 | Completed final sign-off Jul 2026 | 1450 22nd Av | demo walls + ceilings to allow for electrical work. kitchen remodel - replace countertops. bathroom remodel - demo floor + wall tile, demo to allow for electrical work, install new tile, vanity toilet. patch walls after demo.Details
demo walls + ceilings to allow for electrical work. kitchen remodel - replace countertops. bathroom remodel - demo floor + wall tile, demo to allow for electrical work, install new tile, vanity toilet. patch walls after demo. | $46,000 |
| Mar 27, 2025 | In progress issued Mar 2025 | 731 Castro St | opening ip walls & ceililng &patching/tubing for installation of new romex wiring construction work for replacement of shower stall in 1 bathroom, replace toilet & vanity etc. like for like.Details
opening ip walls & ceililng &patching/tubing for installation of new romex wiring construction work for replacement of shower stall in 1 bathroom, replace toilet & vanity etc. like for like. | $29,000 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 512 Bella Vista Wy | bathroom remodel - replace shower w/ new shower stall. new vanity + fixtures. no change in location.Details
bathroom remodel - replace shower w/ new shower stall. new vanity + fixtures. no change in location. | $24,000 |
| Mar 4, 2025 | In progress issued Mar 2025 | 3044 Franklin St | unit 301. remodel of kitchen (same position), two bathrooms/one shower.Details
unit 301. remodel of kitchen (same position), two bathrooms/one shower. | $54,000 |
| Feb 10, 2025 | In progress issued Feb 2025 | 3536 Clay St | remodel in kind of bathroom: new shower pan, tile, fixtures, shower valve etc.Details
remodel in kind of bathroom: new shower pan, tile, fixtures, shower valve etc. | $19,000 |
| Dec 5, 2024 | Completed final sign-off Jan 2025 | 145 Ames St | replace sheetrock after water damage, install insulation on exterior walls and ceiling, resilient channel on ceiling in bathroom and living room and three layers 5/8" dry wall. upstairs kitchen 5/8" sheetrock on both wall behind cabinets, lower stairway and bedroom install 5/8" drywallDetails
replace sheetrock after water damage, install insulation on exterior walls and ceiling, resilient channel on ceiling in bathroom and living room and three layers 5/8" dry wall. upstairs kitchen 5/8" sheetrock on both wall behind cabinets, lower stairway and bedroom install 5/8" drywall | $35,000 |
| Oct 8, 2024 | Completed final sign-off Feb 2025 | 722 Parnassus Av | open up walls & ceilings as necessary to allow for electrical work. replace & abandon all knob & tube wiring. rewire all switches, lights, & outlets. patch sheetrock, texture, & paint in all units.patch back all finishes in kind. replace p-traps bath/kitchen.Details
open up walls & ceilings as necessary to allow for electrical work. replace & abandon all knob & tube wiring. rewire all switches, lights, & outlets. patch sheetrock, texture, & paint in all units.patch back all finishes in kind. replace p-traps bath/kitchen. | $60,000 |
| Aug 19, 2024 | Completed final sign-off Aug 2025 | 1050 North Point St | unit #603: demo (e) kitchen cabinets, counter, etc. replace in kind with new cabinets, countertop, appliances etc. replace tub valve in bathroom. replace vanity, top and toilet.Details
unit #603: demo (e) kitchen cabinets, counter, etc. replace in kind with new cabinets, countertop, appliances etc. replace tub valve in bathroom. replace vanity, top and toilet. | $48,000 |
| Apr 12, 2024 | Completed final sign-off Feb 2025 | 35 Buena Vista Tr | unit 1: 460 sf sheetrock replac. unit 3: sheetrock replace. unit 6: bathroom remodel in-kind & 64 sf sheetrock replace. no exterior work. comply w/ nov 202420243 & 202420567Details
unit 1: 460 sf sheetrock replac. unit 3: sheetrock replace. unit 6: bathroom remodel in-kind & 64 sf sheetrock replace. no exterior work. comply w/ nov 202420243 & 202420567 | $18,000 |
| Apr 12, 2024 | Completed final sign-off Oct 2024 | 1250 Ellis St | unit 3: kitchen remodel, new cabinets, sink in e) location. install washer in dryer rm. 2 bathrooms change vanitiesDetails
unit 3: kitchen remodel, new cabinets, sink in e) location. install washer in dryer rm. 2 bathrooms change vanities | $36,000 |
| Nov 28, 2023 | Completed final sign-off Jun 2024 | 103 22nd Av | one kitchen remodel-change cabinets and countertops in place. new sheetrock 5/8" type x, insulate outer walls. remodel one bathroom in place. new vanity/shower pan/vanity and faucetsDetails
one kitchen remodel-change cabinets and countertops in place. new sheetrock 5/8" type x, insulate outer walls. remodel one bathroom in place. new vanity/shower pan/vanity and faucets | $55,000 |
| Sep 19, 2023 | Completed final sign-off Oct 2023 | 1925 Leavenworth St | to correct nov# 202312602. kitchen and bath remodel w/p permitDetails
to correct nov# 202312602. kitchen and bath remodel w/p permit | $20,000 |
| Jul 5, 2022 | Completed final sign-off Nov 2022 | 4475 24th St | unit #2: demo (e) bathroom shower stall, install new shower pan after close up, install floor and some wall tile, install tile for shower stall, replace in kind approx 90 sf of sheetrock; no structural workDetails
unit #2: demo (e) bathroom shower stall, install new shower pan after close up, install floor and some wall tile, install tile for shower stall, replace in kind approx 90 sf of sheetrock; no structural work | $29,000 |
| Mar 16, 2022 | Completed final sign-off Nov 2022 | 1310 Scott St | demo one kitchen cabinets, countertop, etc. install new cabinets, countertop, sink etc in same positions as existing. install 2 new bathroom vanities. non structuralDetails
demo one kitchen cabinets, countertop, etc. install new cabinets, countertop, sink etc in same positions as existing. install 2 new bathroom vanities. non structural | $40,000 |
| Mar 29, 2021 | Never finaled issued Mar 2021, no final | 155 Shawnee Av | repair siding to front of building. remodel kitchen (no chang to sin/appliances positions) remodel two bathrooms (no change to fixture positions) cosmetic repairs. all work repair in kindDetails
repair siding to front of building. remodel kitchen (no chang to sin/appliances positions) remodel two bathrooms (no change to fixture positions) cosmetic repairs. all work repair in kind | $65,000 |
| Nov 30, 2020 | Completed final sign-off Nov 2021 | 228 Evelyn Wy | to comply with nov# 201808541. all work on ground fl. remove cooktop & cabinetry. legalize (n) full bathroom, & (n) storage. approx 476 sqft.Details
to comply with nov# 201808541. all work on ground fl. remove cooktop & cabinetry. legalize (n) full bathroom, & (n) storage. approx 476 sqft. | $2,000 |
| Mar 2, 2020 | Completed final sign-off Aug 2022 | 2840 Harrison St | demo kitchen in both units, demo closets in both units per plan. reinstall kitchen cabinets and new counters, rough plumbing and fixtures. construct 2 baths accordin to plans. convert dining rm to bedroom, expansion into sunroom no exterior work. install new fixture flooring in 2 (e) bathroomDetails
demo kitchen in both units, demo closets in both units per plan. reinstall kitchen cabinets and new counters, rough plumbing and fixtures. construct 2 baths accordin to plans. convert dining rm to bedroom, expansion into sunroom no exterior work. install new fixture flooring in 2 (e) bathroom | $60,000 |
| Oct 18, 2019 | Completed final sign-off Feb 2020 | 48 Navajo Av | replace kitchen base cabinets, replace counter top in kitchen with new quartz counter top. replace bathroom vanity and sink with newDetails
replace kitchen base cabinets, replace counter top in kitchen with new quartz counter top. replace bathroom vanity and sink with new | $21,000 |
| Aug 7, 2019 | Completed final sign-off Jan 2020 | 1332 Scott St | remove (e) flooring, subflooring, sheetrocked on walls, and kitchen cabinets & counter top and sink. install new sub floor. replace cab & counter in kitchen in existing configuration change bath vanity + sink & toilet. ground floor unit nothing below kitchen 60 sqft bathroom 45 maintain fire ratingDetails
remove (e) flooring, subflooring, sheetrocked on walls, and kitchen cabinets & counter top and sink. install new sub floor. replace cab & counter in kitchen in existing configuration change bath vanity + sink & toilet. ground floor unit nothing below kitchen 60 sqft bathroom 45 maintain fire rating | $30,000 |
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 528 45th Av | remodel 1 (e) bathroom: demo (e) tile, shower, lavy, tilet etc. replace with new tile, shower, lavy, toilet & related fixtures.Details
remodel 1 (e) bathroom: demo (e) tile, shower, lavy, tilet etc. replace with new tile, shower, lavy, toilet & related fixtures. | $28,000 |
| Apr 20, 2018 | Completed final sign-off Jun 2021 | 338 Jersey St | renovate a protion of the (e) 1st flr apartment, including bathromm, kitchen, closets and interior partitions. relocate (e) bathroom and add window at bathroom (not visible from street) relocate and widen (e) exterior back door. remove (e) exterior door at bedroom. relocate (e) w/d. ele/plm sep prDetails
renovate a protion of the (e) 1st flr apartment, including bathromm, kitchen, closets and interior partitions. relocate (e) bathroom and add window at bathroom (not visible from street) relocate and widen (e) exterior back door. remove (e) exterior door at bedroom. relocate (e) w/d. ele/plm sep pr | $80,000 |
| Mar 29, 2018 | Completed final sign-off Oct 2018 | 1666 Geneva Av | kitchen and (2) bathrooms remodel. remove and replace kitchen cabinets, counter top, sink, etc. in bathrooms, rebuild shower valve and change vanities. new ceramic tiles in both bathroom and kitchenDetails
kitchen and (2) bathrooms remodel. remove and replace kitchen cabinets, counter top, sink, etc. in bathrooms, rebuild shower valve and change vanities. new ceramic tiles in both bathroom and kitchen | $27,000 |
| Aug 21, 2017 | Completed final sign-off Nov 2017 | 1972 Post St | remove (e) kitchen countertop, sink, etc. demo kitchen and bathroom tile. install new tile on kitchen floor and bathroom floor and above bathtub. install new countertop sink and fixtures. no changes on walls.Details
remove (e) kitchen countertop, sink, etc. demo kitchen and bathroom tile. install new tile on kitchen floor and bathroom floor and above bathtub. install new countertop sink and fixtures. no changes on walls. | $23,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 3294 Clay St | apt 6: in master bathroom, remove tile over tub & install new tile to replace. in hall bathroom, remove shower tile & shower pan & install new shower pan & tile. no change on walls.Details
apt 6: in master bathroom, remove tile over tub & install new tile to replace. in hall bathroom, remove shower tile & shower pan & install new shower pan & tile. no change on walls. | $17,000 |
| Feb 23, 2016 | Completed final sign-off Jun 2016 | 1050 North Point St | remove extg kitchen counter top and sink fixtures with new countertop, sink, & fixture. change bathroom vanity fixtures and in hallway bath change tile and fixtures. no walls to be altered or removed.Details
remove extg kitchen counter top and sink fixtures with new countertop, sink, & fixture. change bathroom vanity fixtures and in hallway bath change tile and fixtures. no walls to be altered or removed. | $12,000 |
| Jan 19, 2016 | Completed final sign-off Mar 2016 | 345 Church St | #2c - replace kitchen countertop, sink & fixtures; bathroom- repalce vanituy top & sinkDetails
#2c - replace kitchen countertop, sink & fixtures; bathroom- repalce vanituy top & sink | $8,500 |
| Mar 6, 2015 | Completed final sign-off Jul 2015 | 208 Warren Dr | remodel master bathroom, allocation of its wardrobe area to improve use & efficiency. electrical, plmbg, mech work related to above, update finishes. remodel hall bathroom, related plmbg elec work update finishes.Details
remodel master bathroom, allocation of its wardrobe area to improve use & efficiency. electrical, plmbg, mech work related to above, update finishes. remodel hall bathroom, related plmbg elec work update finishes. | $33,000 |
| Jan 28, 2015 | Completed final sign-off Mar 2015 | 2972 21st St | finishes only. remove vanities/sinks in 2 bathrooms. in large bathroom, open walls and increase waste lines to allow for double sinks. add gfi, close walls & install new vanities, sinks, etc in both bathrooms. no walls to be moved.Details
finishes only. remove vanities/sinks in 2 bathrooms. in large bathroom, open walls and increase waste lines to allow for double sinks. add gfi, close walls & install new vanities, sinks, etc in both bathrooms. no walls to be moved. | $6,500 |
| Dec 18, 2014 | Completed final sign-off Jul 2015 | 208 Warren Dr | remove and replace kitchen cabinets, sink and fixtures with new ones. in same locations; replace vanity and sink in hall bathroom ; replace roof with modifiifed bitumen. to comply with cec150.0(k)3 & 5Details
remove and replace kitchen cabinets, sink and fixtures with new ones. in same locations; replace vanity and sink in hall bathroom ; replace roof with modifiifed bitumen. to comply with cec150.0(k)3 & 5 | $28,000 |
| Aug 8, 2014 | Completed final sign-off Apr 2015 | 1945 Washington St | remove (e) countertop, sink, cabinets, etc in kitchen. install new cabinets, sink, counter, etc in same locations. remove(e) vanity & sinks from bathrooms & replace with new vanities & sinks.Details
remove (e) countertop, sink, cabinets, etc in kitchen. install new cabinets, sink, counter, etc in same locations. remove(e) vanity & sinks from bathrooms & replace with new vanities & sinks. | $23,800 |
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 3201 23rd St | unit #204: remove existing counter top in kitchen, install new vinyl couner with existing sink and faucet, change p-trap etc .install new linoleum in bath and kitchen, move gas line to accommodate new stove. change vanity and p-trap etc in bathrm with new faucet,no change in wallsDetails
unit #204: remove existing counter top in kitchen, install new vinyl couner with existing sink and faucet, change p-trap etc .install new linoleum in bath and kitchen, move gas line to accommodate new stove. change vanity and p-trap etc in bathrm with new faucet,no change in walls | $4,500 |
| Sep 13, 2011 | Completed final sign-off Dec 2011 | 3524 Pierce St | in bath kitchen,remove extg counter, sink, fixtures and replace with new counter, sink, fixtures. repair rear deck, replace rotten wood less than 50%.Details
in bath kitchen,remove extg counter, sink, fixtures and replace with new counter, sink, fixtures. repair rear deck, replace rotten wood less than 50%. | $3,500 |
| Apr 27, 2010 | Completed final sign-off Mar 2011 | 2458 Bush St | demo bathroom. install tub, toilet, lavy sink. insulate, sheetrock & tile. 3 new circuits for lights, spa & receptacles.Details
demo bathroom. install tub, toilet, lavy sink. insulate, sheetrock & tile. 3 new circuits for lights, spa & receptacles. | $27,000 |
| Apr 27, 2010 | Expired or cancelled expired Jun 2012 | 2733 Diamond St | to comply with nov 200926987. remove tile @ bathroom. repair dry rot studs. install exhaust fans in units 2 & 4. repalce shower valves unit 2. install shower valves. re-tile bathroom. provide he lights per t-24.Details
to comply with nov 200926987. remove tile @ bathroom. repair dry rot studs. install exhaust fans in units 2 & 4. repalce shower valves unit 2. install shower valves. re-tile bathroom. provide he lights per t-24. | $4,000 |
| Sep 17, 2009 | Never finaled issued Sep 2009, no final | 126 09th Av | remodel bathroom on 2nd floor, 1 1/2 bath. sheetrock furnace room. replace plumbing fixtures, tile floor, wall. 5/8" type x. no lighting or exhaust fan changeDetails
remodel bathroom on 2nd floor, 1 1/2 bath. sheetrock furnace room. replace plumbing fixtures, tile floor, wall. 5/8" type x. no lighting or exhaust fan change | $15,000 |
| Jul 24, 2009 | Never finaled issued Jul 2009, no final | 5044 Diamond Heights Bl | remove sink top from vanity in downstair bathroom. replace sink top . remove vanity and sinks from upstair bathrooms. remove linoleum floor. inside hardy board subfloor and ceramic tile over. install new vanity & sinks. plumbing & electric separate permits.Details
remove sink top from vanity in downstair bathroom. replace sink top . remove vanity and sinks from upstair bathrooms. remove linoleum floor. inside hardy board subfloor and ceramic tile over. install new vanity & sinks. plumbing & electric separate permits. | $3,600 |