Back to bathroom remodel contractors
Wo-Guang Li Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2000 | Completed final sign-off Jul 2000 | 578 33rd Av | add rooms at ground floor, one family room, one bedroom and one half bathDetails
add rooms at ground floor, one family room, one bedroom and one half bath | $8,000 |
| Mar 9, 2000 | Expired or cancelled expired Sep 2000 | 304 17th Av | remodel existing kitchen 7 bathroom, replace 10 windows (double glazing)Details
remodel existing kitchen 7 bathroom, replace 10 windows (double glazing) |