Back to bathroom remodel contractors
Wing Chow Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2004 to Jan 2025
- Last 24 months
- 1 permit filed
38 permits since 2000: 33 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 18 completed, 1 expired or cancelled. Typically 10 days from filing to permit and 310 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2025 | Completed final sign-off Jul 2026 | 1262 20th Av | addition : rear yard addition 91 sf, 3 story addition of total space 3x 91sf =273sf. (n) bathroom addition at 2nd and 3rd floor. ground floor to be garage and storage onlyDetails
addition : rear yard addition 91 sf, 3 story addition of total space 3x 91sf =273sf. (n) bathroom addition at 2nd and 3rd floor. ground floor to be garage and storage only | $30,000 |
| Sep 18, 2023 | Completed final sign-off Jul 2026 | 1262 20th Av | 1 kichen and 1 bathroom remodel. no structural work. no wall layout change. no floor layout change. no new openingDetails
1 kichen and 1 bathroom remodel. no structural work. no wall layout change. no floor layout change. no new opening | $45,000 |
| Oct 6, 2021 | Completed final sign-off Mar 2024 | 427 08th Av | conversion of storage and garage space on 1st floor to habitable space for expansion of unit #2 from 2nd floor. extg unit 2: 846 sq ft ( 1bedroom, bath, l/r, kitchen). new unit 2: 1751 sq ft (2 bedrm, 2 bath, 1 powder rm, 1 office, l/r and kitchen). infill of south lightwell on 2nd floor.Details
conversion of storage and garage space on 1st floor to habitable space for expansion of unit #2 from 2nd floor. extg unit 2: 846 sq ft ( 1bedroom, bath, l/r, kitchen). new unit 2: 1751 sq ft (2 bedrm, 2 bath, 1 powder rm, 1 office, l/r and kitchen). infill of south lightwell on 2nd floor. | $37,000 |
| Aug 17, 2021 | Completed final sign-off Jan 2022 | 1285 Waller St | one kitchen and one bathroom remodel, no structural. lighting to comply with cec 150.0 (k)Details
one kitchen and one bathroom remodel, no structural. lighting to comply with cec 150.0 (k) | $20,000 |
| Jun 3, 2021 | Completed final sign-off Sep 2021 | 1277 Waller St | one kitchen and bathroom remodel. non structural.Details
one kitchen and bathroom remodel. non structural. | $20,000 |
| Oct 7, 2020 | Completed final sign-off Jul 2021 | 510 26th Av | revision to adu permit. reference pa #2017-0420-4439 relocate kitchen and bath within unit only.Details
revision to adu permit. reference pa #2017-0420-4439 relocate kitchen and bath within unit only. | |
| Apr 20, 2017 | Completed final sign-off Jul 2021 | 510 26th Av | addition of new unit on existing ground flr per add unit ordinance 162-16. (2) bedrooms, (1) living room, (1) kitchen, (1) bathroom. legalization permit #2017-0411-3679 not yet approved, increases unit count to 33.Details
addition of new unit on existing ground flr per add unit ordinance 162-16. (2) bedrooms, (1) living room, (1) kitchen, (1) bathroom. legalization permit #2017-0411-3679 not yet approved, increases unit count to 33. | $60,000 |
| Apr 11, 2017 | Completed final sign-off Sep 2022 | 510 26th Av | unit 101. upgrade & legalize unit per unit legalization ord 43-14. at unit #101 to be upgraded & leglaized; 1 bedroom, 1 living rm, 1 kitchen, 1 bathroom.Details
unit 101. upgrade & legalize unit per unit legalization ord 43-14. at unit #101 to be upgraded & leglaized; 1 bedroom, 1 living rm, 1 kitchen, 1 bathroom. | $40,000 |
| Mar 21, 2017 | Completed final sign-off Apr 2021 | 1300 Masonic Av | addition of 1 new unit on ground floor per ordinance# 162-16. new unit with 1 living room, 1 bedrooms, 1 office, 1 kitchen, 1 bathroom.Details
addition of 1 new unit on ground floor per ordinance# 162-16. new unit with 1 living room, 1 bedrooms, 1 office, 1 kitchen, 1 bathroom. | $25,000 |
| Dec 29, 2016 | Expired or cancelled cancelled Nov 2024 | 1308 Masonic Av | addition of new unit per ord 162-16. 1 kitchen, 2 bedroom, 2 bathrooms, 1 living room, 1 office, 1 media room.Details
addition of new unit per ord 162-16. 1 kitchen, 2 bedroom, 2 bathrooms, 1 living room, 1 office, 1 media room. | $50,000 |
| Apr 5, 2016 | Completed final sign-off Nov 2024 | 558 21st Av | add unit per ordinance# 30-15. add unit# 6 w/ (1) bedroom, (1) full bath, (1) kitchen & laundry on 1st floor per plan. ref pa# 201506098552.Details
add unit per ordinance# 30-15. add unit# 6 w/ (1) bedroom, (1) full bath, (1) kitchen & laundry on 1st floor per plan. ref pa# 201506098552. | $100,000 |
| Feb 5, 2016 | Completed final sign-off May 2017 | 635 Clayton St | addition of one 351.6 sq. ft. on 1st floor per ordinance# 30-15 seismic application pa# 2015/10/09/9348. new unit 1 bedroom, 1 bathroom, 1 kitchen.Details
addition of one 351.6 sq. ft. on 1st floor per ordinance# 30-15 seismic application pa# 2015/10/09/9348. new unit 1 bedroom, 1 bathroom, 1 kitchen. | $20,000 |
| Aug 3, 2015 | Completed final sign-off Sep 2015 | 2732 36th Av | demolish the existing unpermitted bathroom on ground floor.Details
demolish the existing unpermitted bathroom on ground floor. | $980 |
| Apr 21, 2015 | Completed final sign-off Nov 2017 | 1227 15th Av | convert unconditioned garage space to conditioned space with a new dwelling unit. extend 1st, 2nd & 3rd floors to the rear. add new floor area. remodel kitchen & powder room on 2nd floor. new unit will have 1 bed & 1 bath.Details
convert unconditioned garage space to conditioned space with a new dwelling unit. extend 1st, 2nd & 3rd floors to the rear. add new floor area. remodel kitchen & powder room on 2nd floor. new unit will have 1 bed & 1 bath. | $200,000 |
| Jan 12, 2012 | Completed final sign-off May 2012 | 2234 26th Av | remodel kitchen & 1 bathroom on 2/f., lighting shall comply with cec150(k)8 & 150(k)10Details
remodel kitchen & 1 bathroom on 2/f., lighting shall comply with cec150(k)8 & 150(k)10 | $12,000 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 558 21st Av | remodel (2) kitchen in unit #1 & #4 and (2) bathroom, cabinet.Details
remodel (2) kitchen in unit #1 & #4 and (2) bathroom, cabinet. | $20,000 |
| Dec 11, 2009 | Completed final sign-off Nov 2010 | 600 Noriega St | removal of 2 (e) stairways, (n) replacement stairway to rear elevation, remodel (e) master bathroom and master bedroom. (n) windows in (n) & (e). and modified (e) openings.Details
removal of 2 (e) stairways, (n) replacement stairway to rear elevation, remodel (e) master bathroom and master bedroom. (n) windows in (n) & (e). and modified (e) openings. | $12,000 |
| Dec 7, 2004 | Completed final sign-off Feb 2005 | 930 Scott St | remodel bathroom, paint interior of apt. #4Details
remodel bathroom, paint interior of apt. #4 | $8,000 |
| Sep 2, 2004 | Completed final sign-off Jun 2005 | 1267 15th Av | remodeling kitchen & two bathroom. repair stairs.Details
remodeling kitchen & two bathroom. repair stairs. | $30,000 |