William S Rehlich Inc
- Based in
- Portola Valley
- On San Francisco permits
- Sep 2020 to Jun 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 1 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2021 | Completed final sign-off Dec 2021 | 464 Dewey Bl | remodel(e)2nd fl kitchen, upgrade(e) electrical and alter plumbing. removal of knob and tube wiring. install new cabs, fixtures, appliances. repair dryrot no additional sqft added relocate entry doorway to kitchen from dining room.insulate and sheetorock 1st fl ceiling. repair rear deck <50%Details
remodel(e)2nd fl kitchen, upgrade(e) electrical and alter plumbing. removal of knob and tube wiring. install new cabs, fixtures, appliances. repair dryrot no additional sqft added relocate entry doorway to kitchen from dining room.insulate and sheetorock 1st fl ceiling. repair rear deck <50% | $85,000 |