Back to bathroom remodel contractors
Wiley Construction
- Based in
- Burlingame
- On San Francisco permits
- Jan 2000 to Mar 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 19 completed, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2015 | Completed final sign-off Jun 2016 | 1242 Mason St | renovation of existing kitchen, bathroom and half bath.Details
renovation of existing kitchen, bathroom and half bath. | $15,000 |
| Oct 30, 2014 | Completed final sign-off Jan 2015 | 150 Parque Dr | revise existing permit, change bathroom location, building permit 201407090842.Details
revise existing permit, change bathroom location, building permit 201407090842. | |
| Jul 9, 2014 | Never finaled issued Sep 2014, no final | 150 Parque Dr | legalize 2 bedrooms and add bathroom at lower floor. add closet at e office, comply with nov 200565496. remove shed at back yard.Details
legalize 2 bedrooms and add bathroom at lower floor. add closet at e office, comply with nov 200565496. remove shed at back yard. | $10,000 |
| Jan 15, 2013 | Completed final sign-off May 2013 | 12 Junior Tr | add second bath at 1st floor. add partition at upstair bedroom. relocate bathroom at ground floor. 70 sq ft addition at garage.Details
add second bath at 1st floor. add partition at upstair bedroom. relocate bathroom at ground floor. 70 sq ft addition at garage. | $15,000 |
| Oct 18, 2010 | Completed final sign-off Feb 2011 | 1818 33rd Av | add a bedroom at downstair. add a bathroom at 2nd floor. enlarge extg storage room at downstairs.Details
add a bedroom at downstair. add a bathroom at 2nd floor. enlarge extg storage room at downstairs. | $10,000 |
| Jan 5, 2010 | Completed final sign-off Jul 2010 | 881 32nd Av | relocate furnace & water heater at ground floor, add 1 full bath at ground floor, add 1 bedroom at ground floor, renovate (e) 2nd floor bath & replace kitchen cabinets on 2nd floorDetails
relocate furnace & water heater at ground floor, add 1 full bath at ground floor, add 1 bedroom at ground floor, renovate (e) 2nd floor bath & replace kitchen cabinets on 2nd floor | $30,000 |
| May 13, 2004 | Completed final sign-off Jul 2004 | 2478 45th Av | replace kitchen cabinet remodel bathroom no structural work to be doneDetails
replace kitchen cabinet remodel bathroom no structural work to be done | $10,000 |
| Nov 27, 2001 | Expired or cancelled expired May 2002 | 676 39th Av | add 1 bedroom and bathroom at e family room area on ground floorDetails
add 1 bedroom and bathroom at e family room area on ground floor | $10,000 |