Back to bathroom remodel contractors
Whiteside Construction Corp.
- Based in
- Richmond
- On San Francisco permits
- Feb 2011 to May 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 21 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2011 | Never finaled issued Mar 2011, no final | 890 Valencia St | construction of new concrete shearwalls in basemnt for voluntary structural strengthening. new steel frames behind windows, no change to (e) facade/storefront. add ada bath to 1st level.Details
construction of new concrete shearwalls in basemnt for voluntary structural strengthening. new steel frames behind windows, no change to (e) facade/storefront. add ada bath to 1st level. | $80,000 |