Back to bathroom remodel contractors
Western Contractors
- Based in
- Hayward
- On San Francisco permits
- Oct 2019 to Mar 2026
- Last 24 months
- 7 permits filed
13 permits since 2000: 6 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 4 completed, 4 in progress. Typically 36 days from filing to permit and 333 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2026 | In progress issued Mar 2026 | 318 Harriet St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment. | $31,500 |
| Mar 17, 2026 | In progress issued Sep 2026 | 2774 Bryant St | install(n)a/c condensor for all unit on 1st flr. remodel: combine (e) bedroom with (e) living room to master bedroom with two full bathroom and walk-in closet. convert (e) storage to (n) laundry room. combine(e) kitchen, (e) pantry, (e) sunroom, with (e) bathroom to open kitchen and living room.Details
install(n)a/c condensor for all unit on 1st flr. remodel: combine (e) bedroom with (e) living room to master bedroom with two full bathroom and walk-in closet. convert (e) storage to (n) laundry room. combine(e) kitchen, (e) pantry, (e) sunroom, with (e) bathroom to open kitchen and living room. | $325,000 |
| Jul 22, 2025 | In progress issued Sep 2026 | 2774 Bryant St | 2nd/f(unit 2776 & 2782) & 3rd/f(unit 2778 & 2780) identical work on both flrs. combine e) office w/ e) living rm to master bedroom w/ full bath & walk in closet. convert e) storage to new landry. combine e) kitchen, e) pantry w/ sunroom to open kitchenDetails
2nd/f(unit 2776 & 2782) & 3rd/f(unit 2778 & 2780) identical work on both flrs. combine e) office w/ e) living rm to master bedroom w/ full bath & walk in closet. convert e) storage to new landry. combine e) kitchen, e) pantry w/ sunroom to open kitchen | $150,000 |
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 333 Austin St | interior remodeling on 333 austin st (2nd floor unit). relocate kitchen and remodel (e) bathroom. replace (e) water heaters with tankless water heater on ground floor.Details
interior remodeling on 333 austin st (2nd floor unit). relocate kitchen and remodel (e) bathroom. replace (e) water heaters with tankless water heater on ground floor. | $70,000 |
| Jul 9, 2025 | Completed final sign-off Nov 2025 | 271 Prague St | (1) kitchen and (1) bathroom remodel same locationDetails
(1) kitchen and (1) bathroom remodel same location | $30,000 |
| Apr 28, 2025 | In progress issued Mar 2026 | 318 Harriet St | add adu per state-mandated adu program per california government code section 65852.2. add new 950 sqft of living space on ground floor. add a kitchen, 2 bathroom, 3 bedroom and living room for adu. add new entry door and windows facing harriet street.Details
add adu per state-mandated adu program per california government code section 65852.2. add new 950 sqft of living space on ground floor. add a kitchen, 2 bathroom, 3 bedroom and living room for adu. add new entry door and windows facing harriet street. | $120,000 |
| Oct 24, 2023 | Completed final sign-off Dec 2024 | 43 Belvedere St | remodel (e) kitchen and (e) two bathrooms at existing location replace fixtures, tile, and cabinet. no walls to be remove. in kindDetails
remodel (e) kitchen and (e) two bathrooms at existing location replace fixtures, tile, and cabinet. no walls to be remove. in kind | $50,000 |
| Aug 24, 2021 | Completed final sign-off Dec 2022 | 617 Minna St | remodel (e) kitchens and bathrooms in all units. remove non load bearing walls.Details
remodel (e) kitchens and bathrooms in all units. remove non load bearing walls. | $250,000 |