West Valley Structural Co.

Contractor license
570208
State license record
Based in
So San Francisco
On San Francisco permits
Aug 2000 to Sep 2026
Last 24 months
24 permits filed

62 permits since 2000: 58 completed, 2 in progress, 2 never finaled.

Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 7Stairs 5Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 24 days from filing to permit and 64 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 13, 2022Completed
final sign-off Dec 2022
649 Central Avrepair damaged siding 1st and 2nd (roughly grows each 6" length) no structural changes/ like and kind material: repair location south side of home opposite of bathrooms- not street facing
Details
Permit
202212138177
Status
complete
Filed
Dec 13, 2022
Permit issued
Dec 13, 2022
Final sign-off
Dec 21, 2022
Declared cost
$3,500
Address
649 Central Av

repair damaged siding 1st and 2nd (roughly grows each 6" length) no structural changes/ like and kind material: repair location south side of home opposite of bathrooms- not street facing

Open the permit page

$3,500
Dec 26, 2000Completed
final sign-off Jun 2001
818 Madrid Stbasement remodel per plans (2 bed + bath) wrap entire garage area no struct
Details
Permit
200012268645
Status
complete
Filed
Dec 26, 2000
Permit issued
Feb 12, 2001
Final sign-off
Jun 12, 2001
Declared cost
$25,000
Address
818 Madrid St

basement remodel per plans (2 bed + bath) wrap entire garage area no struct

Open the permit page

$25,000