West Point Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jul 2011
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2011 | Completed final sign-off Sep 2012 | 520 South Van Ness Av | install new aluminum window system at reception desk, move security gate closer to front entrance door, replace existing hall door with new, reframe 4' of hall wall to create better view of entranceDetails
install new aluminum window system at reception desk, move security gate closer to front entrance door, replace existing hall door with new, reframe 4' of hall wall to create better view of entrance | $14,000 |
| Jun 20, 2011 | Never finaled issued Jul 2011, no final | 330 Ellis St | 5th floor - interior storefront partitions & casework, new flooring.Details
5th floor - interior storefront partitions & casework, new flooring. | $115,000 |
| Dec 16, 2010 | Completed final sign-off Feb 2011 | 1139 Broderick St | work on #1139 only - economy rehab: bathroom new vanity, tile, plumbing fixtures & toilet. kitchen -new cabinets, plumbing fixtures, appliances, countertops and new electrical fixtures.Details
work on #1139 only - economy rehab: bathroom new vanity, tile, plumbing fixtures & toilet. kitchen -new cabinets, plumbing fixtures, appliances, countertops and new electrical fixtures. | $44,000 |
| Oct 9, 2008 | Completed final sign-off Nov 2008 | 3731 Rivera St | install new electric service, install coaxial cable. repair non complying wiring. install new plugs & swichches, install ew surface mounted lights & smoke detectors. dryrot repair at ext. deck less than 50% around 6 windows in kinds vent dryer install venting for front window soffit.Details
install new electric service, install coaxial cable. repair non complying wiring. install new plugs & swichches, install ew surface mounted lights & smoke detectors. dryrot repair at ext. deck less than 50% around 6 windows in kinds vent dryer install venting for front window soffit. | $7,000 |
| Oct 4, 2007 | Completed final sign-off Nov 2007 | 1543 Dolores St | new tile, new plumbing fixtures, new electrical fixtures, new cabinets. remodel bathroom on second floor. replace lighting with fluorescent light.Details
new tile, new plumbing fixtures, new electrical fixtures, new cabinets. remodel bathroom on second floor. replace lighting with fluorescent light. | $20,000 |
| Sep 29, 2006 | Completed final sign-off Oct 2006 | 1970 Sutter St | tile 2 bathrooms, new sink, faucet & new paint.Details
tile 2 bathrooms, new sink, faucet & new paint. | $7,800 |
| Sep 9, 2005 | Completed final sign-off Nov 2005 | 1707 39th Av | kitchen/new cabinets/new fixtures/new flooring/bath-new plmg fixtures new flooring flourescent lightDetails
kitchen/new cabinets/new fixtures/new flooring/bath-new plmg fixtures new flooring flourescent light | $10,000 |
| Mar 24, 2005 | Completed final sign-off Dec 2005 | 461 02nd St | kitchen remodel, new cabinets, new lights, new appliances.Details
kitchen remodel, new cabinets, new lights, new appliances. | $35,000 |
| Sep 28, 2004 | Expired or cancelled expired Feb 2006 | 4087 17th St | remodel kitchen; replace cabs, replace appliances, replace electrical & plumbing fixtures. install iDetails
remodel kitchen; replace cabs, replace appliances, replace electrical & plumbing fixtures. install i | $22,500 |
| Sep 28, 2004 | Completed final sign-off May 2005 | 2127 Castro St | dry rot repair to south side wall, concrete repair approx 25'-0" by 10'-0" htDetails
dry rot repair to south side wall, concrete repair approx 25'-0" by 10'-0" ht | $4,500 |
| Mar 6, 2003 | Completed final sign-off Jun 2003 | 1949 Webster St | remodel existing kitchen, new cabinets, new countertops. no structural work.Details
remodel existing kitchen, new cabinets, new countertops. no structural work. | $33,500 |
| Dec 11, 2002 | Completed final sign-off Mar 2003 | 1948 Sutter St | install master bath on 2nd story in (e) bedroomDetails
install master bath on 2nd story in (e) bedroom | $20,500 |
| Jun 14, 2001 | Completed final sign-off Aug 2001 | 37 Concord St | remove & replace dry rot damaged wood at front stair banisters & front bay window.Details
remove & replace dry rot damaged wood at front stair banisters & front bay window. | $7,500 |