Back to bathroom remodel contractors
West Coast Painting
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to May 2025
- Last 24 months
- 4 permits filed
15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2024 | Completed final sign-off Jul 2025 | 555 Corbett Av | repairs to unit #6 only to replace 70years old. -vanity and sink, tile shower surround & floor (bathroom). - cabinets, sink, counter, floor applicance (kitchen). like for like. no wall demolition or construction, no change in plumbing fixture count. no wall opening.Details
repairs to unit #6 only to replace 70years old. -vanity and sink, tile shower surround & floor (bathroom). - cabinets, sink, counter, floor applicance (kitchen). like for like. no wall demolition or construction, no change in plumbing fixture count. no wall opening. | $30,000 |
| Dec 10, 2019 | Completed final sign-off Apr 2020 | 1620 Leavenworth St | unit 7: remodel bathroom only. new plumbing/light fixtures/tileDetails
unit 7: remodel bathroom only. new plumbing/light fixtures/tile | $10,000 |
| Nov 6, 2019 | Completed final sign-off Apr 2020 | 1620 Leavenworth St | unit 2: remodel kitchen and bath, new cabinets, tile, sheetrockDetails
unit 2: remodel kitchen and bath, new cabinets, tile, sheetrock | $28,000 |
| Nov 6, 2019 | Completed final sign-off Apr 2020 | 1620 Leavenworth St | unit 3: remodel kitchen and bath new cabinets, tile, sheetrockDetails
unit 3: remodel kitchen and bath new cabinets, tile, sheetrock | $28,000 |
| Nov 6, 2019 | Completed final sign-off Apr 2020 | 1620 Leavenworth St | unit 4: remodel kitchen and bath new cabinets, tile, sheetrockDetails
unit 4: remodel kitchen and bath new cabinets, tile, sheetrock | $28,000 |
| Jun 7, 2019 | Completed final sign-off Aug 2019 | 2090 Grove St | unit 11: remodel kitchen and bath in kind. replace door, new cabinets, appliance and tilesDetails
unit 11: remodel kitchen and bath in kind. replace door, new cabinets, appliance and tiles | $17,000 |