Back to bathroom remodel contractors
West Coast Builders
- Based in
- Greenbrae
- On San Francisco permits
- May 2013 to Jul 2026
- Last 24 months
- 8 permits filed
17 permits since 2000: 8 completed, 7 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 14 days from filing to permit and 586 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2024 | In progress issued Sep 2024 | 3321 Pierce St | gr fl remodel (1) bathroom, create (1) new bathroom, relocate hallway, widening garage door and expand garage, eliminate main door. 2nd fl fireplace, guardrail @ deck, panoramic door. remove spiral staircase, remodel bath #3. 3rd fl no work.Details
gr fl remodel (1) bathroom, create (1) new bathroom, relocate hallway, widening garage door and expand garage, eliminate main door. 2nd fl fireplace, guardrail @ deck, panoramic door. remove spiral staircase, remodel bath #3. 3rd fl no work. | $150,000 |
| Feb 6, 2024 | Completed final sign-off Aug 2024 | 4334 19th St | add 1/2 bathroom (2nd fl) in existing conditioned area to include direct vent with additional non bearing partition wall and add (2) interior doors. remodel (e) bathroom to replace (e) exhaust fan, tile and fixture and finishes. no shower pan removal. replace ladder steps to atticDetails
add 1/2 bathroom (2nd fl) in existing conditioned area to include direct vent with additional non bearing partition wall and add (2) interior doors. remodel (e) bathroom to replace (e) exhaust fan, tile and fixture and finishes. no shower pan removal. replace ladder steps to attic | $74,470 |
| Aug 19, 2022 | Completed final sign-off May 2025 | 120 Alhambra St | replace 1 exterior door ( bedroom 1, 1st fl, rear elevation). 1 new exterior window. replace 10 exterior windows. 370 sf interior remodel of 1st fl bedroom , bathrooms 1 and 2, and hall 1. 41 sf interior remodel of 2nd floor bathroom 2. 187 sf interior remodel of 2nd fl kitchen.Details
replace 1 exterior door ( bedroom 1, 1st fl, rear elevation). 1 new exterior window. replace 10 exterior windows. 370 sf interior remodel of 1st fl bedroom , bathrooms 1 and 2, and hall 1. 41 sf interior remodel of 2nd floor bathroom 2. 187 sf interior remodel of 2nd fl kitchen. | $350,000 |