Back to bathroom remodel contractors
West Coast Build Aka Fairway Constructio
- Based in
- Novato
- On San Francisco permits
- Nov 2023 to Sep 2026
- Last 24 months
- 33 permits filed
43 permits since 2000: 28 completed, 15 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 18 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 343 Sansome St | office ti 9th floor to include soft demo (e) space to include non structural partitions, doors, ceilings, lighting millwork, fixtures and finishes. add (n) non structural partitions, doors, window glazing, ceieling, lighting millwork, fixtures and finishes. update bathrooms, elevator,Details
office ti 9th floor to include soft demo (e) space to include non structural partitions, doors, ceilings, lighting millwork, fixtures and finishes. add (n) non structural partitions, doors, window glazing, ceieling, lighting millwork, fixtures and finishes. update bathrooms, elevator, | $1,012,487 |